Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Hydrogen

NISE Seeks Proposals for Green Hydrogen Infrastructure and Funding

editor by editor
August 21, 2024
in Hydrogen
Reading Time: 1 min read
0
NISE
Share on FacebookShare on TwitterShare on Linkedin

The National Institute of Solar Energy (NISE) has issued request for proposals to develop testing facilities, infrastructure, and institutional support to develop standards and regulatory frameworks under the National Green Hydrogen Mission. Proposals will be received from both the government and private sector entities. The central financial assistance (CFA) for the project will be provided by NISE. The proposal has to be submitted by September 14, 2024.

The main aim of this project is to build excellent testing facilities for various components, technologies, and processes used in the production, storage and transportation of green hydrogen and its derivatives.

RELATED POSTS

Aker Solutions Bags 150 MW Hydropower Project in Norway Infra

NHPC and UPPCL sign PPA for 260 MW Dulhasti Stage-II hydro project

For government entities, the entire cost of equipment, installation and commissioning will be covered. For non-government companies, 70 per cent of capital costs will be covered. Up to 15 per cent of total financial assistance can be covered as operational costs, distributed for four years after the project has been completed. A non-refundable fee of Rs 5,000 must be submitted by the entities seeking financial assistance.

The projects must be completed within the given timeline. Non-compliance will result in penalties in the form of 1 per cent of financial support.

Tags: CFAHydrogenNISERenewable Energy
ShareTweetShare
editor

editor

Related Posts

Aker Solutions

Aker Solutions Bags 150 MW Hydropower Project in Norway Infra

by Palak
July 1, 2026
0

Aker Solutions has secured a contract from Tussa Energi to supply all electromechanical equipment for the Tussa II hydropower plant....

NHPC and UPPCL

NHPC and UPPCL sign PPA for 260 MW Dulhasti Stage-II hydro project

by Palak
July 1, 2026
0

NHPC Limited and Uttar Pradesh Power Corporation Limited (UPPCL) have signed a power purchase agreement (PPA) for the supply of...

Department of Atomic Energy

DAE inaugurates world’s first nuclear heat-based hydrogen production facility

by Palak
June 30, 2026
0

The Department of Atomic Energy (DAE) has inaugurated the world’s first hydrogen production facility based on the copper–chlorine (Cu–Cl) thermochemical...

POWERGRID

POWERGRID receives LoI for green hydrogen transmission project under TBCB

by Palak
June 16, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has received a letter of award (LoI) under tariff-based competitive bidding (TBCB) for...

JSW Energy

JSW Energy Commissions 150 MW Tidong Hydro Project

by Palak
June 16, 2026
0

JSW Neo Energy Limited, a wholly owned subsidiary of JSW Energy Limited, has commissioned the entire 150 MW capacity of...

Next Post
Hydropower Import from Nepal

India Secures 941 MW Hydropower Import from Nepal

UPERC Solar Power Tender

UPERC Approves UPPCL's 2,000 MW Solar Power Tender

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Automation Expo 2026 Invite

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

July 14, 2026
POWERGRID

POWERGRID secures LoI for ISTS augmentation project under TBCB

July 14, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

POWERGRID secures LoI for ISTS augmentation project under TBCB

JSW Energy arm bags Rs 4.4 billion BESS order from Bondada Engineering

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

SAEL bags solar module supply order from NTPC REL

Thailand Approves $1.99 Billion Investment in AI, Data Centres and Clean Energy

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved