Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

MoP releases revised Draft Electricity (Rights of Consumers) Amendment Rules, 2026

Palak by Palak
November 25, 2026
in Power
Reading Time: 1 min read
0
Electricity
Share on FacebookShare on TwitterShare on Linkedin

The Ministry of Power (MoP) has circulated a revised draft of the Electricity (Rights of Consumers) Amendment Rules, 2026, proposing to bring the amendments into effect from April 1, 2027. The energy storage requirement for prosumers would take effect from April 1, 2028. The amendments follow deliberations on the financial viability of discoms and challenges arising from higher renewable energy integration.

The proposed changes empower State Electricity Regulatory Commissions (SERCs) to determine net metering limits and associated charges based on state-specific conditions. Prosumers may also install renewable energy capacity beyond their sanctioned load, subject to prescribed limits. Installations exceeding the specified threshold may require energy storage equivalent to at least 20 per cent of daily generation, or another proportion determined by the SERC. In the absence of a state-specific threshold, this requirement would apply to systems exceeding 10 kW. Other changes include revised timelines for electricity connections, a minimum two-level consumer grievance redressal mechanism, revised time-of-day tariff implementation timelines, safeguards against abnormal billing variations and provisions enabling SERCs to establish demand response frameworks.

RELATED POSTS

Waaree Transpower secures over Rs 1 billion transformer order from NTPC

AESL Wins Bihar Transmission Project to Evacuate Power from 2,400 MW Pirpainti Plant

Tags: ElectricityRenewable EnergySERC
ShareTweetShare
Palak

Palak

Related Posts

Waaree Renewable

Waaree Transpower secures over Rs 1 billion transformer order from NTPC

by Palak
November 24, 2026
0

Waaree Transpower, a subsidiary of Waaree Energies, has secured an order worth over Rs 1 billion from NTPC for supplying...

AESL

AESL Wins Bihar Transmission Project to Evacuate Power from 2,400 MW Pirpainti Plant

by Palak
November 24, 2026
0

Adani Energy Solutions Limited (AESL) has secured a transmission project for evacuating power from the upcoming 2,400 MW Pirpainti thermal...

RECPDCL

RECPDCL transfers Vikramshila Power Transmission SPV to AESL

by Palak
November 23, 2026
0

REC Power Development and Consultancy Limited (RECPDCL) has transferred Vikramshila Power Transmission Limited, a project-specific special purpose vehicle (SPV) for...

Power

AESL Wins Bihar Transmission Project to Facilitate Power Evacuation from 2,400 MW Pirpainti Plant

by Palak
November 21, 2026
0

Adani Energy Solutions Limited (AESL) has secured a transmission project for evacuating power from the upcoming 2,400 MW Pirpainti thermal...

Oriana Power

TrueRE Oriana Power to Set up Five CBG Projects Across Three States with 110 TPD Capacity; to Invest Rs. 750 Crores

by Palak
November 20, 2026
0

New Delhi, Delhi, India - TrueRE Oriana Power Limited, listed on NSE Emerge, and one of India’s leading integrated renewable...

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Electricity

MoP releases revised Draft Electricity (Rights of Consumers) Amendment Rules, 2026

November 25, 2026
Armee Infotech

Armee Infotech signs MoU with MSEDCL for 135 MW solar project in Maharashtra

November 24, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

MoP releases revised Draft Electricity (Rights of Consumers) Amendment Rules, 2026

Armee Infotech signs MoU with MSEDCL for 135 MW solar project in Maharashtra

Waaree Transpower secures over Rs 1 billion transformer order from NTPC

AESL Wins Bihar Transmission Project to Evacuate Power from 2,400 MW Pirpainti Plant

Juniper Green Energy Commissions 109 MWp Solar and 95 MWh Battery Storage Capacity

RECPDCL transfers Vikramshila Power Transmission SPV to AESL

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved