ACME Solar Commissions First Phase of 26.4 MW of its Maiden Wind Power Project in Gujarat
GURUGRAM : ACME Solar Holdings Limited has successfully commissioned the first phase of its maiden wind power project, located in Shapar, ...
GURUGRAM : ACME Solar Holdings Limited has successfully commissioned the first phase of its maiden wind power project, located in Shapar, ...
Bondada Engineering Limited has secured a letter of award (LoA) from Telangana Power Generation Corporation Limited (TSGENCO) for setting up ...
Reportedly, the Telangana government is preparing a comprehensive 50-year plan for power generation, with a target of achieving 20,000 MW ...
The Solar Energy Corporation of India Limited (SECI) has announced the results of its auction for 1.2 GW of round-the-clock ...
Bondada Engineering Limited has secured an allocation from the Andhra Pradesh government – Energy Department for developing a 2,000 MW ...
The Rajasthan Electricity Regulatory Commission (RERC) has issued the Rajasthan Electricity Regulatory Commission (Terms and Conditions for Green Energy Open ...
In the year 2000, solar energy accounted for a mere 0.2% of the world’s energy mix. Fast forward to 2024, ...
Promethean Energy has raised $2 million in a Pre-Series A funding round led by Transition VC. The round also saw ...
The Nordic Investment Bank (NIB) and Norwegian Sogn og Fjordande Energi AS (SFE) have inked a €30 million investment loan ...
Adani Green Energy Limited (AGEL) has operationalised a solar power project with capacity of 187.5 MW at Khavda, Gujarat, through ...
© 2016 – 2025 TechZone Print Media | All Rights Reserved