Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

SWREL bags Rs 13.81 billion solar BoS order from AGEL

Palak by Palak
December 3, 2025
in Solar
Reading Time: 1 min read
0
SWREL
Share on FacebookShare on TwitterShare on Linkedin

Sterling and Wilson Renewable Energy Limited (SWREL) has bagged a Rs 13.81 billion engineering, procurement, and construction (EPC) order from Adani Green Energy Limited (AGEL). The EPC order covers the balance of system (BoS) package of three solar projects at the Khavda renewable energy park in Gujarat.

The order also includes the supply of equipment and on-site services for the projects. Furthermore, SWREL has also inked a five-year strategic partnership framework agreement with AGEL.

RELATED POSTS

Has India Moved Too Fast on Solar Cell Localisation?

GREW Solar Strengthens Distribution Footprint in North India with PS Cube Industries Private Limited

Earlier in September 2025, SWREL secured a letter of intent from a private power producer for the BoS work and the EPC of a 300 MWac solar photovoltaic project in Rajasthan.

Furthermore, in August 2025, SWREL was declared as the lowest bidder for the EPC of a 245 MW AC grid-connected solar PV project in the state of Gujarat.

Tags: AGELPV solarRenewable EnergysolarSWREL
ShareTweetShare
Palak

Palak

Related Posts

ASDC

Has India Moved Too Fast on Solar Cell Localisation?

by Palak
August 31, 2026
0

India's DCR policy is accelerating domestic manufacturing—but is the upstream ecosystem ready to support the transition? India's solar manufacturing story...

Grew Solar

GREW Solar Strengthens Distribution Footprint in North India with PS Cube Industries Private Limited

by Palak
August 31, 2026
0

Mumbai/Ahmedabad : GREW Solar announced a new channel partnership with PS Cube Industries Private Limited in Faridabad, strengthening its presence in...

Joint Solar

Joint Solar puts quality and reliability at the heart of India’s solar push towards 500 GW

by Palak
August 27, 2026
0

New Delhi : India’s renewable energy sector is moving into a phase where the focus is not only on adding...

Hindustan Power

Hindustan Power Secures Financing for 435 MWp UP Solar Project

by Palak
August 25, 2026
0

Hindustan Power has achieved financial closure for its 435 MWp solar power project in Lalitpur, Uttar Pradesh, following the sanction...

Avantus

Avantus Secures $300 Million for California Solar Project

by Palak
August 25, 2026
0

Avantus has closed a $300 million tax equity commitment from Truist Bank for the Aratina 2 project located in Kern...

Next Post
ERG and Skellefteå

ERG and Skellefteå Sign PPA to Supply Renewable Energy in Sweden

Superheath

MS Dhoni Invests in Superhealth to Pioneer AI-Based Instant Healthcare, Targets Nationwide Expansion

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Plant inauguration by Shri Arjun Modhwadia, Cabinet Minister for Forest and Environment, Government of Gujarat, with Dr. Geetika Mandan, Medical Director & VP, Parul University

Parul University to Transform Campus Waste into Clean Energy and Carbon Resources in Partnership with Ankur Scientific

August 31, 2026
ASDC

Has India Moved Too Fast on Solar Cell Localisation?

August 31, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Parul University to Transform Campus Waste into Clean Energy and Carbon Resources in Partnership with Ankur Scientific

Has India Moved Too Fast on Solar Cell Localisation?

ASDC Conclave Focuses on Future-Ready Skills as Auto Sector Shifts to EVs, Industry 4.0

Ather Energy marks 4th Ather Community Day by launching Konarc and innovations across vehicle health, batteries and charging

GREW Solar Strengthens Distribution Footprint in North India with PS Cube Industries Private Limited

TARIL Enters Nuclear Sector with Landmark NPCIL Order

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved