Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Heelstone acquires 188 MWp solar project in Texas 

Palak by Palak
August 6, 2026
in Solar
Reading Time: 1 min read
0
Heelstone acquires 188 MWp solar project in Texas
Share on FacebookShare on TwitterShare on Linkedin

Heelstone Renewable Energy, a Qualitas Energy company, has acquired the Cypress Pointe solar project from Azimuth Renewables. The project features a 188 MWp utility-scale solar photovoltaic (PV) project. The project is located in Sabine County, Texas, within the Southwest Power Pool (SPP) market. 

Furthermore, Azimuth Renewables has built the project through its early and mid-stage phases. The project is currently in the development stage, with commercial operations expected in 2029. The transaction follows Heelstone’s financial close in July 2026 for three solar PV projects with a combined capacity of 86 MWp. 

RELATED POSTS

Hindustan Power Secures Financing for 435 MWp UP Solar Project

Avantus Secures $300 Million for California Solar Project

In April 2026, Heelstone Renewable Energy commenced construction on two solar projects totaling 206 MW in Georgia and Michigan. The 104 MW Alligator Creek project in Georgia and the 102 MW Murch project in Michigan are both slated for commercial operation by the end of 2026. EPC agreements have been executed with Pure Power Contractors for the Georgia site and Greensol Renewables for the Michigan facility. 

Tags: Azimuth RenewableHeelstonepowerRenewable Energysolar
ShareTweetShare
Palak

Palak

Related Posts

Hindustan Power

Hindustan Power Secures Financing for 435 MWp UP Solar Project

by Palak
August 25, 2026
0

Hindustan Power has achieved financial closure for its 435 MWp solar power project in Lalitpur, Uttar Pradesh, following the sanction...

Avantus

Avantus Secures $300 Million for California Solar Project

by Palak
August 25, 2026
0

Avantus has closed a $300 million tax equity commitment from Truist Bank for the Aratina 2 project located in Kern...

Shweta Solar

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

by Palak
August 22, 2026
0

New Delhi : The rooftop solar market in India has moved well beyond the early stage of convincing households to...

Servotech Renewable Power System Ltd.

Servotech Renewable Launches New TVC for Solar Lithium Batteries Featuring Sonu Sood

by Palak
August 20, 2026
0

New Delhi : Servotech Renewable Power System Ltd. has launched its latest TVC under its ongoing brand campaign featuring actor...

KPI Green Energy

KPI Green Energy Commissions 130 MW Solar Capacity in Gujarat

by Palak
August 20, 2026
0

KPI Green Energy Limited has commissioned 130 MWac/195 MWdc of solar capacity under its 370 MWac/677 MWdc wind-solar hybrid power...

Next Post
Rajesh Power

Rajesh Power Wins ₹3.63 Billion PGVCL Underground Cabling Contract

Ola

Ola Electric signs battery storage agreement with Axis Energy

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

STMicroelectronics

STMicroelectronics and NUS launch Corporate Labto power the future of Edge AI in Singapore

August 25, 2026
Tanmoy Duari

Has India Moved Too Fast on Solar Cell Localisation?

August 25, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

STMicroelectronics and NUS launch Corporate Labto power the future of Edge AI in Singapore

Has India Moved Too Fast on Solar Cell Localisation?

Hindustan Power Secures Financing for 435 MWp UP Solar Project

Statkraft and Hydro Energi sign 8.8 TWh PPA in Norway

SECI Announces Winners of 6,000 MWh Peak Power Tender

Avantus Secures $300 Million for California Solar Project

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved