Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Colombia Clears 557 MW Solar Projects

Palak by Palak
August 11, 2026
in Solar
Reading Time: 1 min read
0
Colombia
Share on FacebookShare on TwitterShare on Linkedin

The National Environmental Licensing Authority (ANLA) has granted environmental approval for the Turpiales and Los Nogales solar parks located in Río de Oro, Cesar, Colombia. The projects are being developed by Gestión Grupo Solar Colombia S.A.S. The projects have a combined authorised capacity of 557.2 MWac. 

Furthermore, the Turpiales solar project will have 348 MWpdc/278.6 MWac of installed capacity while the Los Nogales Photovoltaic Park will have 342.55 MWpdc/278.6 MWac of installed capacity. Turpiales and Los Nogales projects will use solar modules with an approximate unit capacity of 710 Wp, with the projects comprising 392 and 776 modules, respectively.

RELATED POSTS

TNB and IOI partner for 500 MW solar project in Malaysia

Vikran Engineering Posts 25% YoY Revenue Growth in Q2 FY27, Expands Solar EPC and Power T&D Presence

In April 2026, ANLA initiated the environmental assessment of the 19.9 MW DSE Neiva solar park and its 34.5 kV connection line. The project is located in Neiva, Huila, Colombia. The project is the first solar energy project to be submitted under Colombia’s LASolar mechanism for environmental licensing. LASolar mechanism applies to photovoltaic projects of 10 MW to 100 MW and cuts licensing timelines by more than 70 percent, from 90 to 25 working days.

Tags: ANLAColombiasolar
ShareTweetShare
Palak

Palak

Related Posts

Solar

TNB and IOI partner for 500 MW solar project in Malaysia

by Urja Daily
November 12, 2026
0

Tenaga Nasional Bhd (TNB) plans to invest up to RM424.4 million in a joint venture (JV) with IOI Corp Bhd...

Vikran Engineering

Vikran Engineering Posts 25% YoY Revenue Growth in Q2 FY27, Expands Solar EPC and Power T&D Presence

by Urja Daily
November 6, 2026
0

Thane : Vikran Engineering Limited, one of India's fast-growing EPC companies with a diversified presence across Power Transmission & Distribution,...

Bluebird Solar

Bluebird Solar Expands BESS Solutions Across Industries

by Urja Daily
November 4, 2026
0

Bluebird Solar Private Limited has announced its entry into the Battery Energy Storage System (BESS) segment with a new portfolio...

ACME Solar

ACME Solar signs PPA with NTPC for 400 MW FDRE project

by Urja Daily
November 2, 2026
0

ACME Marigold Urja Private Limited, a wholly owned subsidiary of ACME Solar Holdings Limited, has signed a power purchase agreement...

Mr. Vinay Thadani - Director & CEO - GREW Solar

GREW Solar Receives ALMM List-II Approval for 2.4 GW N-Type TOPCon G12R Cell Manufacturing Capacity, Supporting India’s Solar Self-Reliance Vision

by Urja Daily
November 1, 2026
0

Mumbai / Ahmedabad : GREW Solar has received approval for the inclusion of its 2407 MW solar PV cell manufacturing capacity...

Next Post
CREC

CREC, PELCO I Start 41 MWp Solar-Storage Project

NGEL

NGEL Wins 200 MW BESS Tender from WBSEDCL

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

VAML Accelerates Low- Carbon Transition

VAML Accelerates Low-Carbon Transition with 63% Rise in Renewable Energy Use

November 20, 2026
Sharad

India’s Renewable Energy Paradox: More Solar Capacity, but Is There Enough Storage?

November 20, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

VAML Accelerates Low-Carbon Transition with 63% Rise in Renewable Energy Use

India’s Renewable Energy Paradox: More Solar Capacity, but Is There Enough Storage?

GREW SOLAR MOVES CLOSER TO THE MARKET

Midwest Energy Receives LOI Under Centre’s ₹7,280 Crore Rare Earth Permanent Magnet Scheme

TrueRE Oriana Power to Set up Five CBG Projects Across Three States with 110 TPD Capacity; to Invest Rs. 750 Crores

Nepal to import 350 MW of electricity from India until July 2027

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved