Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Coal India Commissions 200 MW Solar Plant

Palak by Palak
August 11, 2026
in Solar
Reading Time: 1 min read
0
Coal India Limited
Share on FacebookShare on TwitterShare on Linkedin

Coal India Limited has commissioned 200 MW of solar power capacity out of its 300 MW solar power project at Khavda, Gujarat. The commissioned capacity commenced commercial operations on August 8, 2026.

In July 2026, Coal India Limited signed a joint venture (JV) agreement with Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited to develop renewable energy projects in Uttar Pradesh. Under the agreement, Coal India will hold a 51 per cent stake in the JV, while UPRVUNL will hold the remaining 49 per cent. 

RELATED POSTS

Has India Moved Too Fast on Solar Cell Localisation?

GREW Solar Strengthens Distribution Footprint in North India with PS Cube Industries Private Limited

In July 2026, Coal India Limited secured 600 MW of grid-connected solar capacity at the Jalaun Solar Park in Uttar Pradesh from Bundelkhand Saur Urja Limited, a joint venture of NHPC Limited and Uttar Pradesh New and Renewable Energy Development Agency. The project was awarded at a tariff of Rs 2.73 per kWh and is expected to be completed within 18 months from the signing of the power purchase agreement. 

Tags: Coal IndiapowerRenewable Energysolar
ShareTweetShare
Palak

Palak

Related Posts

ASDC

Has India Moved Too Fast on Solar Cell Localisation?

by Palak
August 31, 2026
0

India's DCR policy is accelerating domestic manufacturing—but is the upstream ecosystem ready to support the transition? India's solar manufacturing story...

Grew Solar

GREW Solar Strengthens Distribution Footprint in North India with PS Cube Industries Private Limited

by Palak
August 31, 2026
0

Mumbai/Ahmedabad : GREW Solar announced a new channel partnership with PS Cube Industries Private Limited in Faridabad, strengthening its presence in...

Joint Solar

Joint Solar puts quality and reliability at the heart of India’s solar push towards 500 GW

by Palak
August 27, 2026
0

New Delhi : India’s renewable energy sector is moving into a phase where the focus is not only on adding...

Hindustan Power

Hindustan Power Secures Financing for 435 MWp UP Solar Project

by Palak
August 25, 2026
0

Hindustan Power has achieved financial closure for its 435 MWp solar power project in Lalitpur, Uttar Pradesh, following the sanction...

Avantus

Avantus Secures $300 Million for California Solar Project

by Palak
August 25, 2026
0

Avantus has closed a $300 million tax equity commitment from Truist Bank for the Aratina 2 project located in Kern...

Next Post
MNRE

MNRE Clarifies ALMM List-II Rules for Solar Cells

JSW Energy

JSW Energy Completes Maruti Clean Coal Acquisition

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Plant inauguration by Shri Arjun Modhwadia, Cabinet Minister for Forest and Environment, Government of Gujarat, with Dr. Geetika Mandan, Medical Director & VP, Parul University

Parul University to Transform Campus Waste into Clean Energy and Carbon Resources in Partnership with Ankur Scientific

August 31, 2026
ASDC

Has India Moved Too Fast on Solar Cell Localisation?

August 31, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Parul University to Transform Campus Waste into Clean Energy and Carbon Resources in Partnership with Ankur Scientific

Has India Moved Too Fast on Solar Cell Localisation?

ASDC Conclave Focuses on Future-Ready Skills as Auto Sector Shifts to EVs, Industry 4.0

Ather Energy marks 4th Ather Community Day by launching Konarc and innovations across vehicle health, batteries and charging

GREW Solar Strengthens Distribution Footprint in North India with PS Cube Industries Private Limited

TARIL Enters Nuclear Sector with Landmark NPCIL Order

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved