Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Tips for Better Seasonal Layup/Startup of Boilers and Cooling Water Systems

Urja Daily by Urja Daily
October 12, 2026
in News
Reading Time: 3 mins read
0
electrical power substation with transformers and insulators
Share on FacebookShare on TwitterShare on Linkedin

 No matter which side of the equator your boiler or cooling water system finds itself on, corrosion protection is an integral part of the layup/startup checklist that is too often overlooked—sometimes solely due to lack of information. Simple corrosion prevention strategies not only minimize complications such as clogging and high iron levels at startup but also offer long-term benefits by discouraging the onset of leaks and promoting a longer asset service life overall. The following tips offer helpful insights into how water treatment service providers and boiler/cooling water system operators around the globe can make their lives easier and their assets last longer.

Northern Hemisphere: Best Practices for Cooling System Layup and Boiler Startup

RELATED POSTS

Waaree Transpower Bags Transformer Order Worth Over Rs 100 Crore from NTPC

GREW SOLAR MOVES CLOSER TO THE MARKET

For many, cooling tower winterization or chiller layup mean little more than shutting down the system and hoping for the best. However, without standard water treatment chemistry circulating through the system, the metal surfaces are vulnerable to corrosion that will gradually eat away at the asset, thinning the walls and releasing corrosion products into the water year after year. Adding a simple treatment such as the Cortec® Cooling Loop Gator® prepares the system for wet or dry layup. Circulating these film-forming corrosion inhibitors through the system for 12-24 hours leaves behind a protective layer that offers protection above and below the water level (as long as the system remains closed) and does not need to be removed at startup.

  Boilers are often brought back online at the same time cooling water systems are shut down, when the need for residential and commercial cooling gives way to heating demands. Boilers are especially vulnerable to corrosion as fresh, unheated, highly oxygenated water floods the system before the normal operating water treatment chemistry program is in place. Pitting corrosion is common and can easily be counteracted by adding a Boiler Egg™ to the boiler before startup. This water-soluble pouch dissolves in the makeup water, releasing active chemistry that scavenges oxygen and passivates metal surfaces in the critical startup phase. It also has NSF G7 certification for use in food processing areas where the treated water or steam has no food contact.

Southern Hemisphere: Boiler Layup and Cooling System Startup Tips

  Those south of the equator are experiencing the opposite seasonal change and need to think about boiler winterization and cooling system commissioning. In this case, boiler layup can be simplified by applying the VpCI® Gecko™, Boiler Lizard®, or VpCI® Dragon™ (depending on boiler size) to drained boilers and closing all openings to trap Vapor phase Corrosion Inhibitors within the space. In many cases, the boiler can be restarted without product removal. Boilers undergoing wet layup can be treated with the VpCI® Chameleon™, a corrosion inhibiting blend that includes NSF G6 certification for use in food industry boilers where steam may come into contact with food.

The Cooling Loop Croc™ is the Boiler Egg’s counterpart for cooling system startup. It is an excellent option for both a full return to service and temporary startup during winter warm spells. The Cooling Loop Croc™ comes in water-soluble bags that can be added to a turbulent area of the cooling tower basin after partially filling the system with water and turning on the circulating pumps. The Croc dissolves and releases multi-metal corrosion inhibiting chemistry for the protection of both ferrous and yellow metals.

A Valuable Addition to the Seasonal Shutdown/Startup Checklist

Adding corrosion protection to the seasonal shutdown and startup checklist is a relatively small step that promises significant returns in terms of headaches avoided and repairs and replacements delayed. Contact Cortec® Corporation for additional best practices on avoiding boiler and cooling system corrosion during critical shutdown and startup phases: https://www.cortecwatertreatment.com/contact-us/.

Tags: Cooling LoopcorrosionCortecVpCI
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Waaree Renewable

Waaree Transpower Bags Transformer Order Worth Over Rs 100 Crore from NTPC

by Palak
November 21, 2026
0

Waaree Transpower, a subsidiary of Waaree Energies, has secured an order worth over Rs 1 billion from NTPC for supplying...

Mr. Vinay Thadani - Director & CEO - GREW Solar

GREW SOLAR MOVES CLOSER TO THE MARKET

by Palak
November 20, 2026
0

Mumbai / Ahmedabad, - GREW Solar announced a significant milestone on its path to becoming a listed company. BSE Limited...

LOI_Midwest Energy

Midwest Energy Receives LOI Under Centre’s ₹7,280 Crore Rare Earth Permanent Magnet Scheme

by Palak
November 20, 2026
0

Hyderabad : Midwest Energy Limited has received a Letter of Intent (LOI) from the Ministry of Heavy Industries, Government of...

Executive Board of LAPP

Global growth: LAPP achieves sales of more than two billion euros for the first time

by Palak
November 17, 2026
0

Stuttgart – LAPP Group's global growth strategy is paying off: In fiscal year 2026 (1 October 2025 – 30 September...

Capital Trust Infra

Capital Infra Trust Reports Strong Q2FY27 Performance, Continues to Scale Annuity-Led Portfolio

by Palak
November 17, 2026
0

New Delhi : Capital Infra Trust a leading infrastructure investment trust (InvIT), announced on Friday, November 13, 2026, the financial results...

Next Post
POWERGRID

Swastika Infra Secures Rs 6.16 Billion MSEDCL Contract for Bhandup Distribution Works

Pace Digitek Limited

Pace Digitek Secures 115 MWh Battery Energy Storage Project from BRPL

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Waaree Renewable

Waaree Transpower Bags Transformer Order Worth Over Rs 100 Crore from NTPC

November 21, 2026
Power

AESL Wins Bihar Transmission Project to Facilitate Power Evacuation from 2,400 MW Pirpainti Plant

November 21, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Waaree Transpower Bags Transformer Order Worth Over Rs 100 Crore from NTPC

AESL Wins Bihar Transmission Project to Facilitate Power Evacuation from 2,400 MW Pirpainti Plant

VAML Accelerates Low-Carbon Transition with 63% Rise in Renewable Energy Use

India’s Renewable Energy Paradox: More Solar Capacity, but Is There Enough Storage?

GREW SOLAR MOVES CLOSER TO THE MARKET

Midwest Energy Receives LOI Under Centre’s ₹7,280 Crore Rare Earth Permanent Magnet Scheme

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved