Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Editor's Pick Articles

The “Solar Shelf-Life” Problem and how today’s Best Module Become Obsolete Before Its 25-Year Warranty Ends?

Dushyant Kumar, PV Quality Manager, AXITEC Energy India Pvt. Ltd, leading solar module manufacturer

Urja Daily by Urja Daily
September 23, 2026
in Articles
Reading Time: 3 mins read
0
Dushyant Kumar, PV Quality Manager
Share on FacebookShare on TwitterShare on Linkedin

India’s solar sector is confronting an unexpected shift: while photovoltaic modules are lasting longer than ever, they may be losing economic relevance much sooner.For years, a 25-year performance warranty has been central to solar project economics. Developers typically assumed that once installed, a module would deliver steady output with gradual degradation over decades. But rapid advances in technology are beginning to challenge that assumption.Industry experts now point to what is being described as a “solar shelf-life” problem where modules remain functional but are no longer the most efficient or cost-effective option for the same asset base.This shift comes at a time when India’s solar market is expanding aggressively. The country’s installed solar capacity has crossed 160 GW, supported by policy interventions such as the PM Surya Ghar rooftop scheme and domestic manufacturing mandates under ALMM (Approved List of Models and Manufacturers). However, a mismatch persists: module manufacturing capacity has scaled up rapidly, while domestic cell production remains limited, affecting supply chains and pricing.

At the same time, technology cycles are accelerating. The industry has moved from multi-crystalline to mono-PERC and now toward n-type technologies such as TOPCon, with efficiencies reaching 22–24% globally. Bifacial modules, once considered premium, now dominate installations.

RELATED POSTS

Energy Storage Systems & Their Role in India’s Smart Grid

Fuel Shocks Make Farm Waste a Strategic Industrial Fuel for India, says Ankur Scientific as it Marks 40 Years of R&D

“The pace of change means developers are no longer comparing a module only to its past performance, but to what’s available in the market today,” said a senior analyst at a renewable energy consultancy. “A plant built five years ago may still be operating well, but it could be significantly underperforming compared to new installations.”This has implications for both utility-scale and rooftop segments. In large solar parks, where land and grid infrastructure are already secured, replacing modules, a process known as repowering is becoming economically viable. With module prices having fallen by nearly 90–95% over the past decade, upgrading systems without rebuilding entire plants is increasingly feasible.However, the equation is different for residential consumers. Despite the push from schemes like PM Surya Ghar, rooftop adoption still faces barriers including high upfront costs, limited financing options, and low consumer awareness. For households, replacing modules prematurely may not be financially attractive due to installation and labour costs.Another emerging challenge is how developers assess long-term value. Traditionally, procurement decisions focused on cost per watt. But industry participants say the focus is shifting toward metrics such as levelised cost of electricity (LCOE), degradation rates, and energy yield.“There is a growing realisation that the cheapest module is not necessarily the best investment,” said an EPC contractor involved in utility-scale projects. “Performance over time and compatibility with future upgrades are becoming critical.”Yet, the rapid turnover of technology also introduces risks. Newer cell architectures, while more efficient, have limited long-term field data. Concerns around degradation, UV stability, and performance in India’s diverse climatic conditions remain areas of scrutiny.There is also a downstream implication. If modules are replaced earlier than expected, India could face a surge in solar waste. The country currently lacks a robust ecosystem for large-scale recycling and reuse, a gap that could widen as installations grow.Looking ahead, industry observers say solar projects may need to be designed not as static assets but as evolving platforms. Developers are beginning to consider “repowering readiness” ensuring that mounting structures, inverters, and grid connections can accommodate future upgrades.The shift marks a broader transition in how solar assets are valued. The question is no longer just how long a module will last, but whether it will remain economically optimal over its lifetime.As one analyst put it, “In today’s solar market, the risk is not that a module stops working, it’s that something better arrives much sooner.”

Tags: ALMMLCOERenewable EnergysolarTechnology
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

oswald

Energy Storage Systems & Their Role in India’s Smart Grid

by Urja Daily
October 26, 2026
0

India’s energy sector is entering a phase where merely adding generation capacity will not be enough to meet evolving requirements....

Ankur Jain

Fuel Shocks Make Farm Waste a Strategic Industrial Fuel for India, says Ankur Scientific as it Marks 40 Years of R&D

by Urja Daily
October 21, 2026
0

Vadodara : Wars and geopolitical conflicts in recent years have exposed the vulnerabilities of global energy supply chains, with disruptions increasingly...

Tanmoy Duari

How India’s Next Solar Bottleneck May Not Be Land, Capital or Technology and Could be Skilled Manpower?

by Urja Daily
October 21, 2026
0

As installations surge and manufacturing scales up, a shortage of skilled manpower is emerging as a critical bottleneck in the...

Mr. Madhvendra Singh

Embedded Technology: The Intelligence Behind Electronics and the Careers of Tomorrow

by Urja Daily
October 14, 2026
0

Much of the technology we rely on every day is powered by computing systems that most users never see. A...

Ravi Kumar

Managing Peak Power Demand: How BESS Can Help Commercial Establishments Optimise Energy Consumption

by Urja Daily
September 24, 2026
0

There is one line on every high-tension electricity bill in Maharashtra that businesses often treat as fixed: the demand charge. Unlike...

Next Post
transmission

CERC Releases Draft Second Amendment to Indian Electricity Grid Code Regulations, 2026

Solar Wind

AMPIN Energy Transition Raises $100 Million Investment from Norfund

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Micronora

Micronora 2026: Driving Quality Dialogues, Addressing Strategic Industrial Challenges and Expanding Global Ambitions

November 3, 2026
Vayavya Labs

Vayona Energy wins 108 MW order from Continuum Green Energy

November 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Micronora 2026: Driving Quality Dialogues, Addressing Strategic Industrial Challenges and Expanding Global Ambitions

Vayona Energy wins 108 MW order from Continuum Green Energy

ESSCI Hosts ESDM Skills Samvad 2026 to Strengthen Industry-Ready Workforce for Viksit Bharat

PetroVietnam and CIP advance 1 GW offshore wind project in Vietnam

JVVNL and Global Energy Alliance plan sodium-ion BESS pilot in Jaipur

ACME Solar signs PPA with NTPC for 400 MW FDRE project

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved