Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

Terra Clean Floats Tender for 100 MW Wind Project in Gujarat

Palak by Palak
March 25, 2026
in Wind
Reading Time: 1 min read
0
Terra Clean
Share on FacebookShare on TwitterShare on Linkedin

According to the tender guidelines, the scope of work includes the development of the InSTS project and ten years of operations and maintenance services. It is to be executed on a lump-sum turnkey basis within 23 months, with interconnection at the 66 kV level. The eligible bidders must qualify as Class-I local suppliers and demonstrate prior experience of having completed at least one wind project of 15 MW involving land acquisition or aggregation, design, engineering, construction, and commissioning, including power evacuation infrastructure at the 66 kV level, within the past seven years. 

Additionally, bidders must have cumulatively completed wind projects totalling at least 50 MW with a similar scope during the same period. The bidders are required to furnish an earnest money deposit of Rs 23.69 million along with a bidding fee of Rs 30,000 for participation in the electronic tendering process. 

RELATED POSTS

WestWind Energy Gets Approval for 122 MW Australian Wind Project

Powerica and K.P. Energy Sign PPAs for 100 MW Wind Projects with GUVNL

Earlier in May 2025, IOCL had approved an additional equity investment of Rs 10.86 billion in its wholly-owned subsidiary, Terra Clean, to support the development of 4.3 GW of renewable energy capacity, expanding on the earlier approved 1 GW capacity. 

Tags: powerRenewable EnergyTerra CleanWind
ShareTweetShare
Palak

Palak

Related Posts

WestWind Energy

WestWind Energy Gets Approval for 122 MW Australian Wind Project

by Palak
August 18, 2026
0

WestWind Energy has received planning approval for the Normanville Energy Park. The park will consist of a 122 MW wind...

KP Energy Limited

Powerica and K.P. Energy Sign PPAs for 100 MW Wind Projects with GUVNL

by Palak
August 6, 2026
0

Powerica Limited and K.P. Energy Limited have signed separate power purchase agreements (PPAs) with Gujarat Urja Vikas Nigam Limited (GUVNL)...

Wind

Vietnam Unveils New Legal Framework for Offshore Wind Development

by Palak
July 24, 2026
0

The Government of Vietnam has issued Decree 272/2026, introducing a new legal framework to support the development of offshore wind...

Wind

Vietnam issues new legal framework for offshore wind development

by Palak
July 23, 2026
0

The Government of Vietnam has issued Decree 272/2026, introducing a new legal framework to support the development of offshore wind...

Eurowind Energy

Eurowind Energy Romania Begins Construction of 138 MW Wind Projects

by Palak
July 22, 2026
0

Eurowind Energy Romania has commenced construction of three wind power projects, following the receipt of setting-up authorisations from the National...

Next Post
Energy China

Energy China Consortium Wins EPC Contract for 1,000 MWh BESS in Egypt

RECPDCL

RECPDCL Invites Bids for 2 GW PSP Power Evacuation in Karnataka

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Beyond Installation: What Defines a Successful Industrial Solar Project?

August 22, 2026
Shweta Solar

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

August 22, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Beyond Installation: What Defines a Successful Industrial Solar Project?

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

VinFast India Partners with Federal Bank to Strengthen Dealer Financing Ecosystem

MC²+ Ignite Selects 30 Energy Deep-Tech Startups for Funding

Servotech Renewable Launches New TVC for Solar Lithium Batteries Featuring Sonu Sood

Nuvoton Begins Production of 16-Cell Battery Monitoring ICs for AI Servers

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved