Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Tata Power Strengthens UP Grid with 765 kV Transmission Line Commissioning

Palak by Palak
February 3, 2026
in Power
Reading Time: 1 min read
0
Tata Power
Share on FacebookShare on TwitterShare on Linkedin

RELATED POSTS

U.S. Renewable Electricity Generation Surges 10%, Exceeds 30% Share

EODev and Baudouin partner on high-efficiency, distributed power generation

Tata Power Company Limited has commissioned two 765 kV extra high voltage (EHV) transmission corridors in Uttar Pradesh comprising the Mainpuri to Bara line spanning 380 circuit kilometres and the Mainpuri to Unnao line spanning 194 circuit kilometres, totalling 574 circuit kilometres. The corridors have been developed under the South East UP Power Transmission Company Limited (SEUPPTCL) project and are expected to strengthen the Northern Grid while enabling large scale power evacuation across the state. Once operational, the lines are expected to facilitate evacuation of over 3,000 MW of thermal power generated within Uttar Pradesh. The project, acquired by Resurgent Power Ventures Pte. Limited., a joint venture led by Tata Power, ICICI Bank and global investors, is part of the resolution of previously stressed power assets. The execution involved over 42,000 metric tonnes of tower steel, 6,900 kilometres of conductor stringing and completion of more than 100 major crossings, including railways, rivers and existing transmission corridors.

Tags: EHVICICI BankpowerTata Power
ShareTweetShare
Palak

Palak

Related Posts

Renewable Energy

U.S. Renewable Electricity Generation Surges 10%, Exceeds 30% Share

by Palak
July 24, 2026
0

Washington DC – New data just released by the U.S. Energy Information Administration (EIA), and reviewed by the SUN DAY Campaign, reveal...

EODev and Baudouin

EODev and Baudouin partner on high-efficiency, distributed power generation

by Palak
July 22, 2026
0

The partnership will introduce solid oxide fuel cell (SOFC) technology to EODev's portfolio of clean, distributed and reliable power solutions,...

Tata Power

Tata Power Secures LoA for 324 MW Pumped Storage Project from SECI

by Palak
July 22, 2026
0

Tata Power Company Limited has received a letter of award (LoA) from the Solar Energy Corporation of India Limited (SECI)...

Rajesh Power

Rajesh Power Bags ₹343.7 Million Orders from PGVCL & RVPNL

by Palak
July 22, 2026
0

Rajesh Power Services Limited has secured orders worth Rs 343.7 million, including taxes, from Paschim Gujarat Vij Company Limited (PGVCL)...

Joint Solar

Joint Solar targets wider market opportunities as India’s power demand heads towards 300 GW

by Palak
July 20, 2026
0

New Delhi : India’s electricity requirements are increasing at a fast pace and the major year-on-year rise in demand cannot...

Next Post
Octopus Energy

Octopus Energy and PCG Power Form Joint Venture in China

TNGECL

TNGECL Announces Winners of 375 MW Standalone Battery Storage Tender

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Ather Energy

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

August 3, 2026
PVV Infra

PVV Infra secures land mark sites from NHLML for developing wayside amenities

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

NIRL Secures LoI for 900 MW Solar Project from GUVNL

Brookfield Launches Renewable Energy Platform Lumara

NLC India Renewables Wins 900 MW Solar Project from GUVNL

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved