Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

Tata Power Commissions 100.8 MW Wind Project

Palak by Palak
July 6, 2026
in Wind
Reading Time: 1 min read
0
Tata Power
Share on FacebookShare on TwitterShare on Linkedin

Tata Power Renewable Energy Limited (TPREL), a subsidiary of Tata Power Company Limited, has commissioned its 100.8 MW Jewali wind project in Dharashiv district, Maharashtra. The power generated from the project will be supplied to Tata Power Mumbai Distribution, and will help meet its renewable purchase obligation targets.

The wind farm comprises 28 SG 3.6-145 wind turbine generators. Furthermore, the project is expected to generate around 299 million units of clean electricity every year, while offsetting nearly 245 million kg of carbon emissions annually. 

RELATED POSTS

JSW Energy places orders for two 800 MW turbine generators for Salboni Phase II

AMPIN Energy Transition Raises $100 Million Investment from Norfund

With the commissioning of the Jewali project, TPREL’s total renewable utility capacity has reached 11.6 GW, including 6.7 GW of operational capacity, comprising 5.4 GW of solar and 1.3 GW of wind. The remaining 4.9 GW is under various stages of implementation, including around 2.1 GW of solar projects, 2.6 GW of wind projects, and 0.2 GW of battery energy storage systems, which are expected to be commissioned over the next 6 to 24 months. 

Tags: carbon emissionRenewable EnergysolarStorageTata PowerWind
ShareTweetShare
Palak

Palak

Related Posts

JSW Energy

JSW Energy places orders for two 800 MW turbine generators for Salboni Phase II

by Urja Daily
September 28, 2026
0

JSW Thermal Energy Limited, a wholly owned subsidiary of JSW Energy Limited, has placed an order with its associate company,...

Solar Wind

AMPIN Energy Transition Raises $100 Million Investment from Norfund

by Urja Daily
September 24, 2026
0

The Climate Investment Fund, managed by Norfund, will invest up to $100 million in AMPIN Energy Transition. The investment will...

Wind and Solar Farms

Network Infrastructure for Wind and Solar Farms

by Palak
September 1, 2026
0

Bangalore - R&M, the globally active developer and provider of infrastructure solutions for data and communications networks, based in Wetzikon,...

WestWind Energy

WestWind Energy Gets Approval for 122 MW Australian Wind Project

by Palak
August 18, 2026
0

WestWind Energy has received planning approval for the Normanville Energy Park. The park will consist of a 122 MW wind...

KP Energy Limited

Powerica and K.P. Energy Sign PPAs for 100 MW Wind Projects with GUVNL

by Palak
August 6, 2026
0

Powerica Limited and K.P. Energy Limited have signed separate power purchase agreements (PPAs) with Gujarat Urja Vikas Nigam Limited (GUVNL)...

Next Post
ACME Solar

ACME, Mitsubishi Gas Chemical Sign Green Methanol Deal

GK Energy

GK Energy bags 10,000 solar pumps order from MSEDCL

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

JSW Energy

JSW Energy places orders for two 800 MW turbine generators for Salboni Phase II

September 28, 2026
IndiGrid

IndiGrid to Acquire Luhri Power Transmission from EnerGrid for Up to Rs13.36 Billion

September 28, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0

JSW Energy places orders for two 800 MW turbine generators for Salboni Phase II

IndiGrid to Acquire Luhri Power Transmission from EnerGrid for Up to Rs13.36 Billion

Nawgati Partners with Petrol Dealers Association (Thane, Raigad & Palghar) for AGM 2026

Pace Digitek arm secures major bess order from ntpc ge power services

Waaree Energies moves to merge Indosolar into the company

The “Solar Shelf-Life” Problem and how today’s Best Module Become Obsolete Before Its 25-Year Warranty Ends?

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved