Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Statkraft and Hydro Energi sign 8.8 TWh PPA in Norway

Palak by Palak
August 25, 2026
in Power
Reading Time: 1 min read
0
Statkraft and Hydro Energi
Share on FacebookShare on TwitterShare on Linkedin

Statkraft and Hydro Energi have signed a long-term power purchase agreement (PPA) in Norway. The agreement covers the supply of 876 GWh annually from 2031 to 2040, totalling to approximately 8.8 TWh over the contract period. The agreements will supply power to Hydro’s aluminium plants, with deliveries in NO5 electricity price area. The agreement follows two long-term PPAs signed by Hydro and Statkraft in April 2026 for the delivery of 0.9 TWh annually in 2029 and 2030, and 1.3 TWh annually from 2031 to 2038.

In August 2026, Statkraft agreed to invest approximately NOK 460 million in new control systems to modernise the Vikfalli hydro power plants located in Vik municipality, Norway. Vikfalli comprises the Målset, Refsdal and Hove power plants, which together can generate approximately 860 GWh annually. The plants annual output is equivalent to the electricity consumption of approximately 50,000 Norwegian households.

RELATED POSTS

SECI Announces Winners of 6,000 MWh Peak Power Tender

Teledyne FLIR to Show the New Si2a-PD Continuous Partial Discharge Monitor at Electric & Power Indonesia 2026

In July 2026, Statkraft agreed to invest in the Gran Sul onshore wind project located in Santa Vitória do Palmar, Brazil. The project has an installed capacity of 280 MW. Project construction is expected to commence in January 2027 and the project has already completed the required technical, environmental and regulatory processes.

Tags: Hydro EnergipowerStatkraftStorage
ShareTweetShare
Palak

Palak

Related Posts

SECI

SECI Announces Winners of 6,000 MWh Peak Power Tender

by Palak
August 25, 2026
0

Solar Energy Corporation of India (SECI) has announced the winners of its 1,500 MW/6,000 MWh assured peak power tender (FDRE-IX)....

Electric & Power Indonesia 2026

Teledyne FLIR to Show the New Si2a-PD Continuous Partial Discharge Monitor at Electric & Power Indonesia 2026

by Palak
August 24, 2026
0

Teledyne FLIR will bring the new FLIR Si2a-PD to Electric & Power Indonesia 2026 — a fixed-mount acoustic imaging camera...

RECPDCL

AESL Takes Over Vizag Power Transmission SPV

by Palak
August 19, 2026
0

REC Power Development and Consultancy Limited (RECPDCL) has transferred Vizag Power Transmission Limited, the special purpose vehicle (SPV) for an...

Singapore Solar

Singapore Approves 900 MW Malaysia Clean Power Imports

by Palak
August 19, 2026
0

Singapore’s Energy Market Authority (EMA) has granted conditional approvals to Sembcorp Utilities Pte Ltd and Southern Solar Alliance Pte Ltd...

RECPDCL

AESL Acquires Vizag Power Transmission SPV from RECPDCL

by Palak
August 18, 2026
0

REC Power Development and Consultancy Limited (RECPDCL) has transferred Vizag Power Transmission Limited, the special purpose vehicle (SPV) for an...

Next Post
Hindustan Power

Hindustan Power Secures Financing for 435 MWp UP Solar Project

Tanmoy Duari

Has India Moved Too Fast on Solar Cell Localisation?

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Tanmoy Duari

Has India Moved Too Fast on Solar Cell Localisation?

August 25, 2026
Hindustan Power

Hindustan Power Secures Financing for 435 MWp UP Solar Project

August 25, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Has India Moved Too Fast on Solar Cell Localisation?

Hindustan Power Secures Financing for 435 MWp UP Solar Project

Statkraft and Hydro Energi sign 8.8 TWh PPA in Norway

SECI Announces Winners of 6,000 MWh Peak Power Tender

Avantus Secures $300 Million for California Solar Project

JSW Centre of Excellence in Smart Grid and Automation Launched at MSRIT

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved