Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Solar FlexRack Installed in the Largest Landfill Solar Project in Utah

Urja Daily by Urja Daily
July 13, 2021
in Solar
Reading Time: 2 mins read
0
Solar FlexRack Mounting Solution
Share on FacebookShare on TwitterShare on Linkedin

YOUNGSTOWN, Ohio – Solar FlexRack, a division of Northern States Metals and an innovative leader in photovoltaic (PV) mounting and solar tracker solutions, announced that its Series B Cast-In-Place (CIP) ballasted mounting solution has been installed in a 4.7 MW community solar project in Spanish Fork, Utah. The project is managed by Utah Municipal Power Agency and represents the largest landfill solar project in the state. Prometheus Power, a top solar development, engineering, and finance firm in the region, built this project on a 27-acre landfill site that was unusable for commercial development. This is Solar FlexRack’s first project in Utah and is expected to be operational in summer 2021 and generate enough clean energy to power nearly 3,000 homes.

There has been a nearly 80% increase in landfill solar projects built in the U.S. over the past five years. However, landfills converted to solar generally do not allow penetration in the site’s land surface, as mounting and foundation technology must be adaptable, reliable, and lighter to meet all site regulations. Solar FlexRack’s Series B CIP mounting technology was selected for this project due to its unique design, complete with customizable blocks as well as a two-support system that reduces block thickness. Lighter ballasts and greater flexibility for array profiles onsite also translate to reduced project costs. This mounting solution also has internal bracing and fewer components, making it faster and easier to install.

RELATED POSTS

TNB and IOI partner for 500 MW solar project in Malaysia

Vikran Engineering Posts 25% YoY Revenue Growth in Q2 FY27, Expands Solar EPC and Power T&D Presence

“With a trajectory of growth laid out for Utah by legislative and regulatory bodies, we look forward to supporting the efficient and cost-effective execution of more renewable energy projects in the state,” said Steve Daniel, EVP of Sales and Marketing at Solar FlexRack. “EPCs, developers, project owners, and utilities can depend on our robust project support services and reliable technology to mitigate risks and maximize savings for their projects.”

“We are pleased to work with Solar FlexRack, who provided cradle-to-grave project support as well as the precise, high-quality mounting product required to execute our vision for this impactful landfill solar project,” said Brok Thayn of Prometheus Power. Leveraging its veteran in-house development team and industry relationships, Prometheus Power was able to deliver superior financial and operating results for the project.

In addition to exemplifying how a previously unusable space, such as a landfill, can be converted into a productive, clean energy generating field, this community solar project will also provide savings to subscribed local residents. The project also created 50 jobs and will result in reduced greenhouse gas emissions equivalent to removing about 5,400 cars from the road per year.

Tags: photovoltaic (PV)solarSolar FlexRackSolar ProjectSpanish ForkTrackerUtah
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Solar

TNB and IOI partner for 500 MW solar project in Malaysia

by Urja Daily
November 12, 2026
0

Tenaga Nasional Bhd (TNB) plans to invest up to RM424.4 million in a joint venture (JV) with IOI Corp Bhd...

Vikran Engineering

Vikran Engineering Posts 25% YoY Revenue Growth in Q2 FY27, Expands Solar EPC and Power T&D Presence

by Urja Daily
November 6, 2026
0

Thane : Vikran Engineering Limited, one of India's fast-growing EPC companies with a diversified presence across Power Transmission & Distribution,...

Bluebird Solar

Bluebird Solar Expands BESS Solutions Across Industries

by Urja Daily
November 4, 2026
0

Bluebird Solar Private Limited has announced its entry into the Battery Energy Storage System (BESS) segment with a new portfolio...

ACME Solar

ACME Solar signs PPA with NTPC for 400 MW FDRE project

by Urja Daily
November 2, 2026
0

ACME Marigold Urja Private Limited, a wholly owned subsidiary of ACME Solar Holdings Limited, has signed a power purchase agreement...

Mr. Vinay Thadani - Director & CEO - GREW Solar

GREW Solar Receives ALMM List-II Approval for 2.4 GW N-Type TOPCon G12R Cell Manufacturing Capacity, Supporting India’s Solar Self-Reliance Vision

by Urja Daily
November 1, 2026
0

Mumbai / Ahmedabad : GREW Solar has received approval for the inclusion of its 2407 MW solar PV cell manufacturing capacity...

Next Post
LG Innotek

LG Innotek Reduced 45K Tons of Greenhouse Gas Emissions

SoCalGas and SDG&E

SoCalGas and SDG&E Recognized of 100 Best Places to Work in IT

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved