Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Solar FlexRack Installed in the Largest Landfill Solar Project in Utah

Urja Daily by Urja Daily
July 13, 2021
in Solar
Reading Time: 2 mins read
0
Solar FlexRack Mounting Solution
Share on FacebookShare on TwitterShare on Linkedin

YOUNGSTOWN, Ohio – Solar FlexRack, a division of Northern States Metals and an innovative leader in photovoltaic (PV) mounting and solar tracker solutions, announced that its Series B Cast-In-Place (CIP) ballasted mounting solution has been installed in a 4.7 MW community solar project in Spanish Fork, Utah. The project is managed by Utah Municipal Power Agency and represents the largest landfill solar project in the state. Prometheus Power, a top solar development, engineering, and finance firm in the region, built this project on a 27-acre landfill site that was unusable for commercial development. This is Solar FlexRack’s first project in Utah and is expected to be operational in summer 2021 and generate enough clean energy to power nearly 3,000 homes.

There has been a nearly 80% increase in landfill solar projects built in the U.S. over the past five years. However, landfills converted to solar generally do not allow penetration in the site’s land surface, as mounting and foundation technology must be adaptable, reliable, and lighter to meet all site regulations. Solar FlexRack’s Series B CIP mounting technology was selected for this project due to its unique design, complete with customizable blocks as well as a two-support system that reduces block thickness. Lighter ballasts and greater flexibility for array profiles onsite also translate to reduced project costs. This mounting solution also has internal bracing and fewer components, making it faster and easier to install.

RELATED POSTS

SAEL bags solar module supply order from NTPC REL

Sunsure Energy secures Rs 2.62 billion financing for 75 MWp solar project in Tamil Nadu

“With a trajectory of growth laid out for Utah by legislative and regulatory bodies, we look forward to supporting the efficient and cost-effective execution of more renewable energy projects in the state,” said Steve Daniel, EVP of Sales and Marketing at Solar FlexRack. “EPCs, developers, project owners, and utilities can depend on our robust project support services and reliable technology to mitigate risks and maximize savings for their projects.”

“We are pleased to work with Solar FlexRack, who provided cradle-to-grave project support as well as the precise, high-quality mounting product required to execute our vision for this impactful landfill solar project,” said Brok Thayn of Prometheus Power. Leveraging its veteran in-house development team and industry relationships, Prometheus Power was able to deliver superior financial and operating results for the project.

In addition to exemplifying how a previously unusable space, such as a landfill, can be converted into a productive, clean energy generating field, this community solar project will also provide savings to subscribed local residents. The project also created 50 jobs and will result in reduced greenhouse gas emissions equivalent to removing about 5,400 cars from the road per year.

Tags: photovoltaic (PV)solarSolar FlexRackSolar ProjectSpanish ForkTrackerUtah
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

SAEL

SAEL bags solar module supply order from NTPC REL

by Palak
July 14, 2026
0

SAEL Solar P6 Private Limited, a subsidiary of SAEL Industries Limited, has secured a letter of award from NTPC Renewable...

Sunsure Energy

Sunsure Energy secures Rs 2.62 billion financing for 75 MWp solar project in Tamil Nadu

by Palak
July 9, 2026
0

Sunsure Energy has secured Rs 2.62 billion debt financing from FMO, the Dutch entrepreneurial development bank, and Axis Bank for...

Solar and Wind

Hexa Climate signs 100 MW wind-solar hybrid PPA with CESC

by Palak
July 9, 2026
0

Hexa Climate has signed a power purchase agreement (PPA) with CESC Limited for the supply of 100 MW of inter-state...

Jupiter International Limited

Jupiter International Limited Secures ₹1.08 Billion Solar Pumps Order from Maharashtra State Electricity Distribution Company Limited

by Palak
July 9, 2026
0

Jupiter International Limited has received a Letter of Empanelment (LoE) from the Maharashtra State Electricity Distribution Company Limited (MSEDCL). The...

Solar

Hartek Power Bags Order for 400 MW Solar Project in Rajasthan

by Palak
July 9, 2026
0

Hartek Power has secured a 400 MW utility-scale solar engineering, procurement, and construction (EPC) project in Rajasthan. The project will...

Next Post
LG Innotek

LG Innotek Reduced 45K Tons of Greenhouse Gas Emissions

SoCalGas and SDG&E

SoCalGas and SDG&E Recognized of 100 Best Places to Work in IT

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Automation Expo 2026 Invite

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

July 14, 2026
POWERGRID

POWERGRID secures LoI for ISTS augmentation project under TBCB

July 14, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

POWERGRID secures LoI for ISTS augmentation project under TBCB

JSW Energy arm bags Rs 4.4 billion BESS order from Bondada Engineering

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

SAEL bags solar module supply order from NTPC REL

Thailand Approves $1.99 Billion Investment in AI, Data Centres and Clean Energy

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved