Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable

RECPDCL Transfers SPV to PGCIL for Renewable Energy Transmission

Urja Daily by Urja Daily
January 3, 2025
in Renewable
Reading Time: 1 min read
0
RECPDCL
Share on FacebookShare on TwitterShare on Linkedin

REC Power Development and Consultancy Limited (RECPDCL), a subsidiary of REC Limited under the Ministry of Power, transferred the Special Purpose Vehicle (SPV) Rajasthan IV 4A Power Transmission Limited to Power Grid Corporation of India Limited (PGCIL). The transfer followed PGCIL’s selection as the Transmission Service Provider (TSP) through a Tariff-Based Competitive Bidding (TBCB) process conducted by RECPDCL. The project will be executed under the Build, Own, Operate, and Transfer (BOOT) model and is scheduled for completion in 24 months.

The transmission project, valued at Rs 53.78 billion, is designed to evacuate 3.5 GW of renewable energy from the Rajasthan Renewable Energy Zone. Key components of the project include a 765/400 kV, 2×1,500 MVA substation near Ghiror in Uttar Pradesh, the augmentation of the Barmer-I Pooling Station, and the construction of 283.05 km of 765 kV transmission lines and 43.28 km of 400 kV transmission lines, along with related works.

RELATED POSTS

Ardian Acquires 116 MW Solar Assets in Italy

NHPC Commissions 53.57 MW of Karnisar Solar Project in Bikaner

In November 2024, RECPDCL transferred the SPV for the Khavda V-A Power Transmission Project to PGCIL, on a BOOT basis scheduled for completion within 54 months.

Tags: BOOTpowerrecpdclRenewable Energy
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Ardian

Ardian Acquires 116 MW Solar Assets in Italy

by Palak
July 2, 2025
0

Ardian has acquired a 116 MW portfolio of 117 solar PV plants in operation. The plants are located in various...

NHPC Limited

NHPC Commissions 53.57 MW of Karnisar Solar Project in Bikaner

by Palak
July 2, 2025
0

NHPC Limited has commisioned 53.57 MW capacity under the 300 MW grid-connected Karnisar solar power project located in Bikaner, Rajasthan....

Ardian

Ardian Acquires 116 MW Solar Portfolio in Italy

by Palak
July 2, 2025
0

Ardian has acquired a 116 MW portfolio of 117 solar PV plants in operation. The plants are located in various...

Oswal Energies

Oswal Energies Receives Inaugural Electrolyser Shipment from Greenzo Energy

by Palak
July 2, 2025
0

Oswal Energies Limited has commenced its Rs 3.2 billion green hydrogen project with the receipt of the first 1 MW...

NLC India

NLC India to Build 450 MW Wind-Solar Hybrid Project for NTPC

by Palak
July 2, 2025
0

Reportedly, NLC India Limited has received a letter of award from NTPC Limited for developing a 450 MW interstate transmission...

Next Post
GACL

GACL to Source 62.7 MW Renewable Energy from Aditya Birla Renewables

UPNEDA Floating Solar

UPNEDA Invites Expressions of Interest for Floating Solar Projects in Uttar Pradesh

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Ministry of Power

MoP Launches India Energy Stack as Digital Public Infrastructure for Power Sector

July 2, 2025
Damodar Valley Corporation

DVC Inks PPA to Supply 300 MW Thermal Power to Karnataka Discoms

July 2, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

MoP Launches India Energy Stack as Digital Public Infrastructure for Power Sector

DVC Inks PPA to Supply 300 MW Thermal Power to Karnataka Discoms

Ardian Acquires 116 MW Solar Assets in Italy

NHPC Commissions 53.57 MW of Karnisar Solar Project in Bikaner

Ardian Acquires 116 MW Solar Portfolio in Italy

Oswal Energies Receives Inaugural Electrolyser Shipment from Greenzo Energy

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved