Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

POWERGRID commissions transmission system for 7 GW Khavda RE zone

Palak by Palak
July 16, 2026
in Power
Reading Time: 1 min read
0
POWERGRID
Share on FacebookShare on TwitterShare on Linkedin

Power Grid Corporation of India Limited (POWERGRID) has commissioned the transmission system for the evacuation of power from the potential renewable energy zone in the Khavda area of Gujarat under Phase IV (7 GW) – Part E4. The project achieved commercial operation with effect from June 21, 2026, in accordance with the applicable regulations of the Central Electricity Regulatory Commission 

In June 2026, POWERGRID emerged as the successful bidder under the tariff-based competitive bidding process for the development of the interstate transmission system (ISTS) associated with the proposed green hydrogen and green ammonia projects in the Kakinada area (Phase I). 

RELATED POSTS

Statkraft and Hydro Energi sign 8.8 TWh PPA in Norway

SECI Announces Winners of 6,000 MWh Peak Power Tender

In February 2026, POWERGRID, through its wholly owned subsidiary Powergrid Narela Transmission Limited, commissioned an ISTS in Rajasthan to facilitate the evacuation of 8.1 GW of solar power. The project will evacuate power through high-capacity 765 kV transmission corridors, enhancing overall grid stability.

Tags: ElectricityHydrogenISTSpowergrid
ShareTweetShare
Palak

Palak

Related Posts

Statkraft and Hydro Energi

Statkraft and Hydro Energi sign 8.8 TWh PPA in Norway

by Palak
August 25, 2026
0

Statkraft and Hydro Energi have signed a long-term power purchase agreement (PPA) in Norway. The agreement covers the supply of...

SECI

SECI Announces Winners of 6,000 MWh Peak Power Tender

by Palak
August 25, 2026
0

Solar Energy Corporation of India (SECI) has announced the winners of its 1,500 MW/6,000 MWh assured peak power tender (FDRE-IX)....

Electric & Power Indonesia 2026

Teledyne FLIR to Show the New Si2a-PD Continuous Partial Discharge Monitor at Electric & Power Indonesia 2026

by Palak
August 24, 2026
0

Teledyne FLIR will bring the new FLIR Si2a-PD to Electric & Power Indonesia 2026 — a fixed-mount acoustic imaging camera...

RECPDCL

AESL Takes Over Vizag Power Transmission SPV

by Palak
August 19, 2026
0

REC Power Development and Consultancy Limited (RECPDCL) has transferred Vizag Power Transmission Limited, the special purpose vehicle (SPV) for an...

Singapore Solar

Singapore Approves 900 MW Malaysia Clean Power Imports

by Palak
August 19, 2026
0

Singapore’s Energy Market Authority (EMA) has granted conditional approvals to Sembcorp Utilities Pte Ltd and Southern Solar Alliance Pte Ltd...

Next Post
Automation Expo 2026

INVT Electric India to Showcase Automation and Drive Solutions at Automation Expo 2026

Oorjan Cleantech

Why Battery Energy Storage Systems (BESS) Are Becoming the Missing Link in India’s Clean Energy Transition

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

STMicroelectronics

STMicroelectronics and NUS launch Corporate Labto power the future of Edge AI in Singapore

August 25, 2026
Tanmoy Duari

Has India Moved Too Fast on Solar Cell Localisation?

August 25, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

STMicroelectronics and NUS launch Corporate Labto power the future of Edge AI in Singapore

Has India Moved Too Fast on Solar Cell Localisation?

Hindustan Power Secures Financing for 435 MWp UP Solar Project

Statkraft and Hydro Energi sign 8.8 TWh PPA in Norway

SECI Announces Winners of 6,000 MWh Peak Power Tender

Avantus Secures $300 Million for California Solar Project

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved