Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Hydrogen

PFC Consulting Invites Bids for Green Hydrogen Power Evacuation

Palak by Palak
March 7, 2025
in Hydrogen
Reading Time: 1 min read
0
PFC Consulting Limited
Share on FacebookShare on TwitterShare on Linkedin

PFC Consulting Limited has invited bids to evacuate 3,000 MW of power for green hydrogen and ammonia projects. Located in Kakinada, Andhra Pradesh, the project has been developed under a build, own, operate, and transfer model. The deadline for bid submission is May 6, 2025. 

According to the tender guidelines, the bidders must pay a money deposit of Rs 149 million. Additionally, the developers must also provide a contract performance guarantee of Rs 372.5 million. The scope of work includes establishing a 765/400 kV, 3×1,500 MVA substation with a 240 MVAr bus reactor, integrating the Vemagiri-Srikakulam 765 kV double circuit line at the Kakinada substation, and setting up a ± 300 MVAr STATCOM system. Successful bidders will be responsible for developing, operating, and maintaining the project, which involves conducting surveys, preparing detailed project reports, securing financing, obtaining necessary clearances, and managing the overall execution. They must design, supply materials, construct, test, and commission the project while also compensating for land acquisition. The project must be completed within 24 months.

RELATED POSTS

H2 Core Systems builds scalable hydrogen energy solutions with Siemens Xcelerator

NHPC Set to Operationalise Fourth Unit of Subansiri Hydro Project

According to the eligibility criteria, the bidders must demonstrate prior experience in infrastructure projects with a minimum capital expenditure of Rs 7.45 billion over the last five financial years, with at least Rs 1.49 billion spent per project. Alternatively, they must have executed projects where aggregate payments received were at least Rs 7.45 billion over five years, with a minimum of Rs 1.49 billion per project. Additionally, they must have maintained a minimum net worth of Rs 2.98 billion over the last three financial years.

Tags: HydrogenPFC Consulting Limitedpower
ShareTweetShare
Palak

Palak

Related Posts

H2 Core

H2 Core Systems builds scalable hydrogen energy solutions with Siemens Xcelerator

by Palak
May 19, 2026
0

Siemens’ software and automation portfolio enables modular hydrogen energy system manufacturer to accelerate design, eliminate production errors and respond to...

NHPC

NHPC Set to Operationalise Fourth Unit of Subansiri Hydro Project

by Palak
May 7, 2026
0

NHPC Limited has declared the commercial operation date (CoD) of the fourth 250 MW unit of the Subansiri Lower Hydroelectric...

Advait Greenergy

Advait Greenergy inaugurates 30 MW alkaline electrolyser assembly facility in Gujarat

by Palak
March 16, 2026
0

Advait Greenergy Private Limited, a subsidiary of Advait Energy Transitions Limited, has inaugurated a 30 MW alkaline electrolyser assembly facility...

Hyundai

Hyundai to Build Integrated Hydrogen, AI and Solar Hub with USD 6 Billion Investment

by Palak
March 9, 2026
0

Hyundai Motor Group is set to invest USD 6 billion to develop a high-tech innovation hub in Saemangeum, Gunsan, focused...

TANAKA

TANAKA Unveils Palladium Membrane for High-Efficiency Hydrogen Purification

by Palak
March 9, 2026
0

TOKYO - TANAKA PRECIOUS METAL TECHNOLOGIES Co., announced the successful development of “HPM-L111”, the world’s first metal* palladium (Pd) hydrogen permeable membrane capable...

Next Post
GE Vernova

GE Vernova T&D Wins ₹5 Billion Order from PowerGrid

Vikram Solar

Vikram Solar to Set Up 1 GWh Solid-State Battery Plant

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Joint solar

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

June 3, 2026
Shri V. Packirisamy

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

June 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • How proper refurbishment can extend life of pre-owned bikes in India?

    0 shares
    Share 0 Tweet 0
  • ACWA Power Signs Landmark $10 Billion Clean Energy Agreements

    0 shares
    Share 0 Tweet 0

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

Sharika Enterprises Limited Enters SCADA-ADMS Market with Uttarakhand Grid Modernization Project

Cargill Launches Two-Year Livestock Development Initiative to Strengthen Maharashtra’s Dairy Sector

Flip Chip Technology Market Witnesses Rising Demand from Consumer Electronics Sector

Servotech Signs ₹400 Crore MoU for Haryana Manufacturing Expansion

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved