Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

Extension of Bid Submission Deadline: Tender for 50 MW (AC) Solar PV Project

Urja Daily by Urja Daily
June 7, 2021
in Tenders
Reading Time: 1 min read
0
solar power project
Share on FacebookShare on TwitterShare on Linkedin

Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India

Tender title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 50 MW (AC) Solar PV Project with Land having 10 years plant O&M at Tamilnadu, India

RELATED POSTS

RECPDCL floats tender for development of ISTS to evacuate 2 GW of solar power

Sembcorp Wins 150 MW FDRE Allocation in SJVN’s 6,000 MWh Tender

Tender No: SECI/C&P/TD/2020/TN/50

Tender Search Code (TSC): SECI-2021-TN000001

Extension of Bid submission Deadline: 

Existing Date & Time of Bid Submission: 07.06.2021 till 1400 HRS

Existing Date & Time of Bid Opening: 07.06.2021 at 1600 HRS

Revised Date & Time of Bid Submission: 30.06.2021 till 1400 HRS

Revised Date & Time of Bid Opening: 30.06.2021 at 1600 HRS

Prospective Bidders are requested to remain updated for any notices wrt the Bidding documents through the websites www.seci.co.in as no separate notification will be issued in this regard.

‘Click Here To See Files’

Tags: 50 MWSECISolar PV projecttender
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

RECPDCL

RECPDCL floats tender for development of ISTS to evacuate 2 GW of solar power

by Palak
March 16, 2026
0

REC Power Development and Consultancy (RECPDCL) has issued a request for proposal (RfP) for the development of an intrastate transmission...

Sembcorp

Sembcorp Wins 150 MW FDRE Allocation in SJVN’s 6,000 MWh Tender

by Palak
November 12, 2025
0

Sembcorp Industries, through its subsidiary Sembcorp Green Infra, has secured a 150 MW firm and dispatchable renewable energy (FDRE) project...

RECPDCL

RECPDCL Floats Tender for Maharashtra Substation Project

by Palak
September 3, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has floated a tender to set up a 400/132 kV AIS substation in...

Solar Energy

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

by Palak
August 8, 2025
0

Pavia Acque Scarl, the integrated water service company of Pavia city, has launched a €15.89 million tender for solar photovoltaic...

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

Next Post
Roof Top

Provision of Roof Top Based 0.1MW Solar Power Plant at RMS Dholpur

Duke Energy

Duke Energy Announced 250MW Solar Project in Texas

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Airengy and Nobian

Airengy and Nobian Partner to Explore 2.5 GWh Compressed Air Energy Storage Project in Denmark

July 14, 2026
Mr.Vinkesh Gulati

Automotive Skills Development Council Empowers Over 5 Lakh Learners with Future-Ready Automotive Skills on World Youth Skills Day

July 14, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

Airengy and Nobian Partner to Explore 2.5 GWh Compressed Air Energy Storage Project in Denmark

Automotive Skills Development Council Empowers Over 5 Lakh Learners with Future-Ready Automotive Skills on World Youth Skills Day

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

POWERGRID secures LoI for ISTS augmentation project under TBCB

JSW Energy arm bags Rs 4.4 billion BESS order from Bondada Engineering

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved