Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Solar FlexRack Installed in the Largest Landfill Solar Project in Utah

Urja Daily by Urja Daily
July 13, 2021
in Solar
Reading Time: 2 mins read
0
Solar FlexRack Mounting Solution
Share on FacebookShare on TwitterShare on Linkedin

YOUNGSTOWN, Ohio – Solar FlexRack, a division of Northern States Metals and an innovative leader in photovoltaic (PV) mounting and solar tracker solutions, announced that its Series B Cast-In-Place (CIP) ballasted mounting solution has been installed in a 4.7 MW community solar project in Spanish Fork, Utah. The project is managed by Utah Municipal Power Agency and represents the largest landfill solar project in the state. Prometheus Power, a top solar development, engineering, and finance firm in the region, built this project on a 27-acre landfill site that was unusable for commercial development. This is Solar FlexRack’s first project in Utah and is expected to be operational in summer 2021 and generate enough clean energy to power nearly 3,000 homes.

There has been a nearly 80% increase in landfill solar projects built in the U.S. over the past five years. However, landfills converted to solar generally do not allow penetration in the site’s land surface, as mounting and foundation technology must be adaptable, reliable, and lighter to meet all site regulations. Solar FlexRack’s Series B CIP mounting technology was selected for this project due to its unique design, complete with customizable blocks as well as a two-support system that reduces block thickness. Lighter ballasts and greater flexibility for array profiles onsite also translate to reduced project costs. This mounting solution also has internal bracing and fewer components, making it faster and easier to install.

RELATED POSTS

NIRL Secures LoI for 900 MW Solar Project from GUVNL

NLC India Renewables Wins 900 MW Solar Project from GUVNL

“With a trajectory of growth laid out for Utah by legislative and regulatory bodies, we look forward to supporting the efficient and cost-effective execution of more renewable energy projects in the state,” said Steve Daniel, EVP of Sales and Marketing at Solar FlexRack. “EPCs, developers, project owners, and utilities can depend on our robust project support services and reliable technology to mitigate risks and maximize savings for their projects.”

“We are pleased to work with Solar FlexRack, who provided cradle-to-grave project support as well as the precise, high-quality mounting product required to execute our vision for this impactful landfill solar project,” said Brok Thayn of Prometheus Power. Leveraging its veteran in-house development team and industry relationships, Prometheus Power was able to deliver superior financial and operating results for the project.

In addition to exemplifying how a previously unusable space, such as a landfill, can be converted into a productive, clean energy generating field, this community solar project will also provide savings to subscribed local residents. The project also created 50 jobs and will result in reduced greenhouse gas emissions equivalent to removing about 5,400 cars from the road per year.

Tags: photovoltaic (PV)solarSolar FlexRackSolar ProjectSpanish ForkTrackerUtah
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

SECI

SECI Announces Winners of 4.455 MW Rooftop Solar Auction

by Palak
July 30, 2026
0

The Solar Energy Corporation of India Limited (SECI) has announced the winners for grid-connected rooftop solar project under the renewable...

LNK Energy

LNK Energy Secures Funding for Phase 1 of 6 GW Solar Manufacturing Facility

by Palak
July 30, 2026
0

LNK Energy has secured financial closure for phase 1 of its 6 GW integrated solar manufacturing facility in Maharashtra through...

Shweta Solar

Shweta Solar champions dependable after-sales support in rooftop solar

by Palak
July 27, 2026
0

New Delhi : Installing a rooftop solar system is only the beginning of a much longer journey. As more households...

Next Post
LG Innotek

LG Innotek Reduced 45K Tons of Greenhouse Gas Emissions

SoCalGas and SDG&E

SoCalGas and SDG&E Recognized of 100 Best Places to Work in IT

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved