Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Amara Raja Batteries Announces 50 MW Solar Plant

Urja Daily by Urja Daily
February 15, 2021
in Solar
Reading Time: 1 min read
0
solar plant
Share on FacebookShare on TwitterShare on Linkedin

Amara Raja Batteries Limited (ARBL), an Industrial and Automotive Battery majors has issued its financial outcomes for the Q3 for the 2021 financial year. During the financial presentation, the firm announced plans for setting a 50 MW solar power plant in Andhra Pradesh.

The firm highlighted, in last quarter December 31, 2020, their revenue was Rs. 1960.12 cr, up from Rs. 1747.81 cr during the same quarter in the last FY. Also, Profit Before Tax (PBT) of Rs. 259.90 cr was also more than Rs. 217.36 cr. The Earnings Per Share for Q3 was at Rs. 11.31.

RELATED POSTS

Meta Signs EAPAs with Adapture Renewables for 360 MW Solar Project in Texas

JSW Energy Inks PPA with NHPC for 300 MW Solar-Wind Hybrid Project

For the automotive segment, the firm stated that revenue growth was supported by persistent growth in OEM & aftermarket segments with the Export segment registering robust growth. Telecom and commercial UPS market segments have also recorded strong growth in the Q3.

Amara also revealed that they have set-up a “Advanced Lithium Technology Research Hub” with Pilot plant facility for cell development. With newly developed range of battery packs for e-mobility and energy storage applications secured approvals from various OEMs and for commercial supplies.

For supporting the sustainability initiatives, ARBL is setting up a 50 MW solar power plant in Chittoor District of Andhra Pradesh at a total outlay of Rs. 220 crore. which will reduce the cost of power and simultaneously bring down the carbon footprint of the company.

Tags: Amara Raja BatteriesSolar Plant
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Meta

Meta Signs EAPAs with Adapture Renewables for 360 MW Solar Project in Texas

by Palak
June 27, 2025
0

Adapture Renewables has executed two environmental attributes purchase agreements (EAPAs) with Meta. The agreements total 360 MW across two solar...

JSW Energy

JSW Energy Inks PPA with NHPC for 300 MW Solar-Wind Hybrid Project

by Palak
June 27, 2025
0

JSW Energy Limited, through it’s subsidiary Energizent Power Private Limited has signed a power purchase agreement (PPA) with NHPC Limited...

Solar Pumps

Solar Pumps Surge Ahead: Fueling the Future of Sustainable Water Solutions

by Palak
June 25, 2025
0

As the world embraces clean and renewable energy sources, solar-powered technologies are stepping into the spotlight like never before. Among...

KPI Green Energy

KPI Green Energy Secures 36.87 MW Captive Solar Projects

by Palak
June 21, 2025
0

KPI Green Energy Limited’s wholly owned subsidiary Sun Drops Energia has secured new orders for 36.87 MW of captive solar...

Juniper Green Energy

Juniper Green Energy Commissions 59 MWp Solar Project in Wardha, Maharashtra

by Palak
June 21, 2025
0

Juniper Green Energy has commissioned the 59 MWp/42 MW solar component of its 75 MW hybrid power project in Karanja...

Next Post
Kabira Mobility launches KM3000 & KM4000, India's Fastest Electric Bikes

Kabira launches KM3000 & KM4000, India's Fastest E-Bikes

Agreement Between Maire Tecnimont Group and Essential Energy

Agreement Between Maire Tecnimont Group and Essential Energy

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Meta

Meta Signs EAPAs with Adapture Renewables for 360 MW Solar Project in Texas

June 27, 2025
Bondada Engineering

Bondada Engineering Establishes GreenBond RE Park to Accelerate Clean Energy Projects

June 27, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Meta Signs EAPAs with Adapture Renewables for 360 MW Solar Project in Texas

Bondada Engineering Establishes GreenBond RE Park to Accelerate Clean Energy Projects

METLEN and Jinko ESS Forge Energy Storage Partnership for Europe and Latin America

JSW Energy Inks PPA with NHPC for 300 MW Solar-Wind Hybrid Project

StayVista Raises Over INR 40 Cr in Funding Round Led by JSW Ventures

EIA Data Reveals Record-Breaking Renewable Energy Generation in April

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved