Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Vikran Engineering Commissions Second Solar Plant, Scales Distributed Renewable Push Under PM-KUSUM

Palak by Palak
May 6, 2026
in Solar
Reading Time: 2 mins read
0
Vikran Engineering
Share on FacebookShare on TwitterShare on Linkedin

Vikran Engineering Limited announced the commissioning of its second 5 MW solar power plant in Ambijalgaon, Ahilyanagar district, Maharashtra, under the PM KUSUM Scheme. The newly operational plant marks another milestone in the company’s expanding renewable energy portfolio and reflects continued progress under the 600 MW solar contract secured in December 2025.

The solar plant has been developed to provide reliable daytime electricity for agricultural irrigation, addressing longstanding challenges faced by farmers in the region due to unstable grid supply and dependence on costly diesel-powered irrigation.
The Ambijalgaon solar plant is expected to generate significant annual impact, including:

RELATED POSTS

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

  • 10,000 MWh of clean energy generation annually
  • 8,200 tonnes of CO₂ emissions avoided per year
  • Reliable daytime power supply for irrigation pumps through the dry season
  • Productive utilization of underutilized land, creating long-term revenue opportunities for local landowners

The commissioning reflects Vikran Engineering’s strategic expansion into renewable energy infrastructure, aligned with its long-term vision of building future-ready infrastructure that addresses energy security, sustainability, and rural economic development simultaneously.

Commenting on the development, Mr. Rakesh Markhedkar, CMD, Vikran Engineering Limited, said: “The commissioning of our second solar power plant under this project marks another important milestone in Vikran Engineering’s renewable energy journey and reflects our commitment to building infrastructure that delivers measurable impact on the ground. Beyond clean power generation, projects like these directly support farmer livelihoods, improve rural energy reliability, and contribute meaningfully to India’s sustainability goals. We remain focused on executing our solar pipeline with speed and precision as we continue to scale our renewable energy footprint across the country.”

With this commissioning, Vikran Engineering has now operationalized 2 solar power plants under its broader solar development pipeline, while an additional 145 MW remains under active construction, with the overall execution pipeline progressing as scheduled.

The company’s ability to maintain project momentum despite the operational complexities of executing in monsoon-prone geographies, while coordinating across government agencies, land partners, contractors, and supply chains, demonstrates its growing execution capabilities in large-scale renewable infrastructure deployment.

The development further highlights Vikran Engineering’s strategic diversification beyond its traditional transmission and distribution business into high-growth renewable energy infrastructure.

Tags: agricultureCo2 emissionpowerRenewable EnergysolarVikran Engineering
ShareTweetShare
Palak

Palak

Related Posts

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

by Urja Daily
October 23, 2026
0

For Indian industries, investing in solar power has become an important step towards controlling electricity costs and meeting sustainability goals....

Fujitsu

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

by Urja Daily
October 21, 2026
0

Kawasaki, Nagoya, Yokosuka and Tokyo, Japan - Fujitsu Limited (Fujitsu), Nagoya University, Tokai National Higher Education and Research System (Nagoya University),...

VIKRAM SOLAR

Vikram Solar to establish 7.5 GWh BESS plant in Tamil Nadu

by Urja Daily
October 21, 2026
0

VSL PowerHive, a wholly owned subsidiary of Vikram Solar, has announced plans to establish a 7.5 GWh battery energy storage...

Vikram Solar

Vikram Solar secures 187 MW module supply order in Karnataka and Tamil Nadu

by Urja Daily
October 20, 2026
0

Vikram Solar has secured a 187 MW module supply order from a leading renewable energy developer in India for solar...

Techzeal

Techzeal Info Pvt. Ltd. is Set to Execute Next-Phase Growth Strategy, Expanding Beyond Conventional Solar EPC

by Urja Daily
October 19, 2026
0

Mumbai, Maharashtra, India - Techzeal Info Private Limited is preparing for a major transformation of its business model, with plans...

Next Post
GEBT 2026

GEBT 2026 advances sustainable building through low-carbon intelligence and smart connectivity

Servotech

Servotech Renewable Secures 1415 kW Solar Rooftop Project Order from South Central Railway, Vijayawada Division

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

October 23, 2026
Emmvee

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

October 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

Fujiyama Power Systems Limited clarifying the potential impact of China’s proposed export restrictions on solar cell manufacturing technology and machinery

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved