Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

Uttar Pradesh Government Approves 1,200 MW Pumped Storage Project

editor by editor
August 1, 2024
in Storage
Reading Time: 1 min read
0
Uttar Pradesh Pumped Storage
Share on FacebookShare on TwitterShare on Linkedin

The Uttar Pradesh government has granted in-principal approval for THDC India’s 1,200 MW pumped storage project (PSP) in the Robertsganj tehsil of Sonbhadra district. The project, with an estimated cost of Rs 66 billion, will generate electricity for six hours and 36 minutes daily. The project is covered in 300.55 hectares of land and will require an initial annual filling of 15.031 million cubic meters (mcm) of water from the Son River, with an additional 1.7112 mcm needed to compensate for evaporation losses.

In June 2024, SJVN has been awarded a Letter of Intent (LoI) from the Mizoram government for the Darzo Lui pumped storage project (PSP). It will be the first such project in Mizoram. It is expected to cost Rs 139.48 billion at 2023 price levels and have a generation capacity of 2,400 MW. The project will be spread across Darzo Nallah, a tributary of the Tuipui river. It will be an on-stream closed-loop type PSP and will have eight units of 300 MW each. The estimated time of completion for the project is twenty-seven months. Annually, 4,993.20 MU of energy will be generated with 95 per cent plant availability.

RELATED POSTS

METSTO Enhances Warehouse Storage Systems with Advanced Racking Solutions

Premier Energies and RCT India Partner to Develop 12 GWh BESS Facility in Telangana

Tags: LoIMizoram GovernmentPSPStorage
ShareTweetShare
editor

editor

Related Posts

METSTO Enhances Warehouse Storage Systems with Advanced Racking Solutions

by Urja Daily
September 23, 2026
0

Bangalore, Karnataka, India - Most warehouse problems don't start on the floor. They start with a storage setup that was...

Premier Energies

Premier Energies and RCT India Partner to Develop 12 GWh BESS Facility in Telangana

by Urja Daily
September 14, 2026
0

Premier Energies Limited and RCT India, part of RCT Group, Germany, have signed a binding term sheet to form a...

Inox Clean Energy

Inox Clean Energy completes Rs 60 billion acquisition of Vena Energy India

by Palak
August 20, 2026
0

Inox Clean Energy Limited, part of the INOXGFL Group, has completed the acquisition of Vena Energy India Holdings Pte Ltd,...

Philippines

Philippines Begins 41 MWp Solar-53 MWh BESS Project

by Palak
August 18, 2026
0

Citicore Renewable Energy Corporation and Pampanga I Electric Cooperative have broken ground on an integrated solar photovoltaic (PV) and battery...

Jupiter Wagons

Jupiter Wagons secures 100 MW BESS projects in West Bengal 

by Palak
August 12, 2026
0

Jupiter Wagons Limited, through e-reverse auctions conducted under tariff-based competitive bidding, has secured two standalone battery energy storage system (BESS)...

Next Post
NTPC Limited

NTPC Announces Results for 1 GW Wind-Solar Hybrid Auction

EIB Solar Farm

EIB Provides €390 Million Loan to DEPA Commercial for Solar Farm Development in Greece

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

MG Indian Super League

ISL 2026-27 to be known as the MG Indian Super League

October 2, 2026
Thousand Trails

TARIL Secures Large Order from Damodar Valley Corporation for 500 MVA and 200 MVA Auto Transformers

October 2, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

ISL 2026-27 to be known as the MG Indian Super League

TARIL Secures Large Order from Damodar Valley Corporation for 500 MVA and 200 MVA Auto Transformers

KP Group Unveils KP 3.0 Strategy to Drive Its Next Phase of Growth

ASDC Champions Shine at WorldSkills Shanghai 2026; Secure 5 Medals for Excellence

Honeywell Technologies Partner with Dangote to Accelerate Refinery Development

Yash Highvoltage Expands US Footprint to 22 States with New Midwest Partnership

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved