Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

Tender for Operation & Maintenance for 05 years of 01 MW Grid Connected Rooftop Project at Port blair

Urja Daily by Urja Daily
August 30, 2021
in Tenders
Reading Time: 1 min read
0
Solar-Energy-Corporation-of-India
Share on FacebookShare on TwitterShare on Linkedin

This is in reference to the NIT No. SECI/C&P/O&M/2021/A&NA/01 regarding the Tender for Operation & Maintenance for 05 (Five) years of 01 (One) MW Grid Connected Rooftop Project at Port Blair, Andaman & Nicobar, Island, India
 
The Clarification 01 document including its Annexures have been uploaded on ISN-ETS Portal https://www.bharat-electronictender.com/ and under Tender Section of SECI Website www.seci.co.in. Prospective bidders are requested to refer to ISN-BHARAT Portal and SECI websites for details.
 

Bidders are required to refer the clarifications 01 as mentioned below link – 
 /upload/static/files/Clarification%2001%20upload.pdf

RELATED POSTS

RECPDCL floats tender for development of ISTS to evacuate 2 GW of solar power

Sembcorp Wins 150 MW FDRE Allocation in SJVN’s 6,000 MWh Tender

  
Prospective bidders are requested to remain updated for any notices/ amendments/ clarifications etc. to the RfS documents through the websites www.seci.co.in and https://www.bharat-electronictender.com/

Tags: C&PGridO&MrooftopSECItender
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

RECPDCL

RECPDCL floats tender for development of ISTS to evacuate 2 GW of solar power

by Palak
March 16, 2026
0

REC Power Development and Consultancy (RECPDCL) has issued a request for proposal (RfP) for the development of an intrastate transmission...

Sembcorp

Sembcorp Wins 150 MW FDRE Allocation in SJVN’s 6,000 MWh Tender

by Palak
November 12, 2025
0

Sembcorp Industries, through its subsidiary Sembcorp Green Infra, has secured a 150 MW firm and dispatchable renewable energy (FDRE) project...

RECPDCL

RECPDCL Floats Tender for Maharashtra Substation Project

by Palak
September 3, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has floated a tender to set up a 400/132 kV AIS substation in...

Solar Energy

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

by Palak
August 8, 2025
0

Pavia Acque Scarl, the integrated water service company of Pavia city, has launched a €15.89 million tender for solar photovoltaic...

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

Next Post
brahma-kumaris-solar-power-plant

Solar A Big Contributor To Brahma Kumaris Drive For Sustainable Energy

CORE Electric Cooperative

Intermountain Rural Electric Association Rebranding To CORE Electric Cooperative

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Automation Expo 2026 Invite

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

July 14, 2026
POWERGRID

POWERGRID secures LoI for ISTS augmentation project under TBCB

July 14, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

POWERGRID secures LoI for ISTS augmentation project under TBCB

JSW Energy arm bags Rs 4.4 billion BESS order from Bondada Engineering

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

SAEL bags solar module supply order from NTPC REL

Thailand Approves $1.99 Billion Investment in AI, Data Centres and Clean Energy

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved