Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

Tender for 5 MW (AC) grid connected ground based Solar PV Power Plant including 10 years plant O&M at V. O. Chidambaranar Port Trust, Tuticorin, Tamilnadu, India

Urja Daily by Urja Daily
November 27, 2021
in Tenders
Reading Time: 1 min read
0
SECI
Share on FacebookShare on TwitterShare on Linkedin

Owner: V. O. Chidambaranar Port Trust, Tuticorin, Tamilnadu, India

Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India

RELATED POSTS

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

TNGECL Issues Tender for 1 GWh BESS with VGF Support

Tender title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 5 MW (AC) grid connected ground based Solar PV Power Plant including 10 years plant O&M at V. O. Chidambaranar Port Trust, Tuticorin, Tamilnadu, India.

NIT No: SECI/C&P/NIT/2021/VOCPT5

The Bidding documents in English for the tender for Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 5 MW (AC) grid connected ground based Solar PV Power Plant including 10 years plant O&M at V. O. Chidambaranar Port Trust, Tuticorin, Tamilnadu, India will be available for download online at www.bharat-electronictender.com & SECI’s website @ www.seci.co.in within 04 weeks of the publication of this notice.

This is for advance intimation to all of the prospective bidders. Bidders are requested to remain updated for any notices wrt this Tender document through the websites www.seci.co.in and www.bharat-electronictender.com as no separate notification will be issued in this regard.

Tags: Bid submissionengineeringErectionSolar PVTesting & Commissioning
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

KPTCL

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

by Palak
April 9, 2025
0

Karnataka Power Transmission Corporation Limited (KPTCL) has announced the results of its 500 MW/1 GWh battery energy storage system (BESS)...

TNGECL

TNGECL Issues Tender for 1 GWh BESS with VGF Support

by Palak
March 18, 2025
0

Tamil Nadu Green Energy Corporation Limited (TNGECL) has initiated the bidding process for the development of six standalone battery energy...

NVVN

NVVN Issues Tender for 1,000 MWh BESS Project in Rajasthan

by Palak
March 3, 2025
0

NTPC Vidyut Vyapar Nigam Limited (NVVN) has invited proposals to develop standalone battery energy storage systems (BESS) with a total...

TGGENCO

TGGENCO Launches Tender for 250 MW/500 MWh BESS Project

by Urja Daily
January 27, 2025
0

Telangana Power Generation Corporation (TGGENCO) has issued a tender to develop a pilot project for a standalone battery energy storage...

NHPC Limited

NHPC Issues Tender for 125 MW/500 MWh BESS in Kerala

by Urja Daily
January 23, 2025
0

NHPC Limited has issued a tender to establish standalone battery energy storage systems (BESS) with an aggregate capacity of 500...

Next Post
MakotoUchida-CEO-left-AshwaniGupta-COO-right

Nissan Unveils Ambition 2030 Vision To Empower Mobility

Epson-Platinum-award-from-EcoVadis

Epson Meets Milestone in Switch to 100% Renewable Electricity

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

European Commission

European Commission awards public funding to 15 renewable hydrogen projects in Europe

May 22, 2025
ACME Solar

ACME Solar Commissions 112.5 MW in Phase Two of Sikar Solar Project

May 22, 2025
  • 643 Followers
  • 23.9k Followers

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

European Commission awards public funding to 15 renewable hydrogen projects in Europe

ACME Solar Commissions 112.5 MW in Phase Two of Sikar Solar Project

Deriva Energy Secures $127 Million Financing for U.S. Renewable Projects

India Champions Enhanced Energy Cooperation at BRICS Summit in Brazil

REC Secures ₹56.35 Billion via Private Placement Bond Issuance

Vikram Solar Awarded EcoVadis Platinum Medal, Ranked Among Top 1% Globally in Sustainability Performance

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved