Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

Tamil Nadu Announces Repowering, Refurbishment, and Life Extension Policy 2024 for Wind Energy Generators

Urja Daily by Urja Daily
September 16, 2024
in Wind
Reading Time: 1 min read
0
SECI
Share on FacebookShare on TwitterShare on Linkedin

Tamil Nadu has issued the Repowering, Refurbishment and Life Extension Policy 2024 for wind energy generators (WEG).

All WEGs that have completed their operational life period of 20 years will have to compulsorily opt for a repowering, refurbishment or a life extension project. For other WEGs, participation is voluntary. Further, the repowering, refurbishment, or life extension of state transmission utility connected projects will be implemented through the state nodal agency. For sale of power, if any WEG opts for repowering, they will be allowed 18 months for repowering and one year for refurbishment from the date of approval for execution of repowering and refurbishment respectively.  During the period of repowering or refurbishment of the WEG, they will be allowed to draw power from the grid for project completion. The repowered and refurbished projects can self-consume or sell the excess power generated to other entities at prevailing tariffs.

RELATED POSTS

WestWind Energy Gets Approval for 122 MW Australian Wind Project

Powerica and K.P. Energy Sign PPAs for 100 MW Wind Projects with GUVNL

Tags: powerRefurbishmentRepoweringwind energy
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

WestWind Energy

WestWind Energy Gets Approval for 122 MW Australian Wind Project

by Palak
August 18, 2026
0

WestWind Energy has received planning approval for the Normanville Energy Park. The park will consist of a 122 MW wind...

KP Energy Limited

Powerica and K.P. Energy Sign PPAs for 100 MW Wind Projects with GUVNL

by Palak
August 6, 2026
0

Powerica Limited and K.P. Energy Limited have signed separate power purchase agreements (PPAs) with Gujarat Urja Vikas Nigam Limited (GUVNL)...

Wind

Vietnam Unveils New Legal Framework for Offshore Wind Development

by Palak
July 24, 2026
0

The Government of Vietnam has issued Decree 272/2026, introducing a new legal framework to support the development of offshore wind...

Wind

Vietnam issues new legal framework for offshore wind development

by Palak
July 23, 2026
0

The Government of Vietnam has issued Decree 272/2026, introducing a new legal framework to support the development of offshore wind...

Eurowind Energy

Eurowind Energy Romania Begins Construction of 138 MW Wind Projects

by Palak
July 22, 2026
0

Eurowind Energy Romania has commenced construction of three wind power projects, following the receipt of setting-up authorisations from the National...

Next Post
Genus Power

Genus Power Establishes Two Special Purpose Vehicles (SPVs) for AMISP Services under RDSS

Azure Power

Azure Power Global Plans USD 350 Million Green Bond Prepayment with Rs 24 Billion Term Loan Refinancing

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Beyond Installation: What Defines a Successful Industrial Solar Project?

August 22, 2026
Shweta Solar

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

August 22, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Beyond Installation: What Defines a Successful Industrial Solar Project?

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

VinFast India Partners with Federal Bank to Strengthen Dealer Financing Ecosystem

MC²+ Ignite Selects 30 Energy Deep-Tech Startups for Funding

Servotech Renewable Launches New TVC for Solar Lithium Batteries Featuring Sonu Sood

Nuvoton Begins Production of 16-Cell Battery Monitoring ICs for AI Servers

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved