Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable

SSE Partners with Fluence, OCU Energy for UK BESS Project

editor by editor
March 11, 2024
in Renewable
Reading Time: 1 min read
0
OCU Energy
Share on FacebookShare on TwitterShare on Linkedin

SSE Renewables has announced the principal contractor and system supplier for its battery-based energy storage project at Fiddler’s Ferry, Warrington. Fluence has been selected as the supplier of the battery-based energy storage system to SSE. The project will utilise the Gridstack platform, proven for its industry leading safety and reliability.

Furthermore, construction is set to begin at the site in the coming weeks after SSE Renewables took a final investment decision in December 2023. OCU Energy will be the principal contractor at Fiddler’s Ferry. The 150 MW / 300 MWh battery storage project is situated at the site of the former SSE-owned coal-fired power station at Fiddler’s Ferry.

RELATED POSTS

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

NIRL Secures LoI for 900 MW Solar Project from GUVNL

Reportedly, the power station was decommissioned in March 2020, and the final demolition of its cooling towers came at the end of last year. Once operational, the system will be capable of storing power for release back to the UK National Grid when needed, helping to manage peaks of energy demand.

Tags: BatteryInvestmentpowerRenewablesSSE PartnersStorage System
ShareTweetShare
editor

editor

Related Posts

278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

by Palak
August 3, 2026
0

Bluebird Solar has announced a significant milestone by securing a 278 MW solar PV module supply order from Bridge &...

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

Brookfield

Brookfield Launches Renewable Energy Platform Lumara

by Palak
August 3, 2026
0

Brookfield has launched Lumara, a new renewable energy platform focused on accelerating the development and construction of renewable energy projects....

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

Tata Power

Tata Power begins construction of 800 MW renewable energy project in Andhra Pradesh

by Palak
August 3, 2026
0

Tata Power Renewable Energy Limited (TPREL), a subsidiary of Tata Power, has conducted the groundbreaking ceremony for its 800 MW...

Next Post
StoreDot

StoreDot Partners with EVE Energy for Fast Charging Batteries

NTPC Green Energy Limited

NTPC Signs MoU with RRVUNL for Renewable Energy and Green Hydrogen Projects

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved