Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

SRE Signs CPPAs for Formosa 4 Offshore Wind Project in Taiwan

Palak by Palak
January 2, 2026
in Wind
Reading Time: 1 min read
0
SRE
Share on FacebookShare on TwitterShare on Linkedin

Synera Renewable Energy Group (SRE) has reported that the entire 495 MW capacity of its Formosa 4 offshore wind project has been fully contracted through corporate power purchase agreements (CPPAs). The project, which is construction-ready, reached full subscription following an initial CPPA signed with Taiwan Smart Electricity & Energy in December 2025, along with two additional CPPAs concluded subsequently in the same month. These latter agreements were executed with an unnamed leading corporate buyer and another unnamed power services provider.

The Formosa 4 offshore wind project is planned off the coast of Miaoli county. It secured capacity allocation under Phase 3 of Taiwan’s offshore wind programme in the first auction round held in 2022. Additionally, the project obtained its establishment permit in late 2024. With permitting and offtake in place, the project is positioned to move into the construction phase.

RELATED POSTS

Vietnam Unveils New Legal Framework for Offshore Wind Development

Vietnam issues new legal framework for offshore wind development

Once operational, the wind farm is expected to generate around 2 billion kWh of green electricity annually. Moreover, Synera Renewable Energy Group has indicated that progress toward construction now depends on alignment of credit support and project financing. The company has urged the government and local financial institutions to address the project’s financing requirements.

Tags: CPPApowerRenewable EnergySREWind
ShareTweetShare
Palak

Palak

Related Posts

Wind

Vietnam Unveils New Legal Framework for Offshore Wind Development

by Palak
July 24, 2026
0

The Government of Vietnam has issued Decree 272/2026, introducing a new legal framework to support the development of offshore wind...

Wind

Vietnam issues new legal framework for offshore wind development

by Palak
July 23, 2026
0

The Government of Vietnam has issued Decree 272/2026, introducing a new legal framework to support the development of offshore wind...

Eurowind Energy

Eurowind Energy Romania Begins Construction of 138 MW Wind Projects

by Palak
July 22, 2026
0

Eurowind Energy Romania has commenced construction of three wind power projects, following the receipt of setting-up authorisations from the National...

SECI

SECI floats tender for 45.6 MW wind project in Andhra Pradesh

by Palak
July 20, 2026
0

The Solar Energy Corporation of India Limited (SECI) has invited bids for the design, engineering, supply, and construction of a...

RWE

RWE secures approval for 1.1 GW Australian wind farm

by Palak
July 17, 2026
0

RWE has received federal environmental approval for its 1.1 GW Theodore wind farm. The project is located in Central Queensland,...

Next Post
Waaree Energies

Waaree Energies Bags 1.5 GW Solar Module Supply Order

Kajra Solar Power

Bihar Commissions Initial Phase of Kajra Solar Power Project

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Tata Power

Tata Power begins construction of 800 MW renewable energy project in Andhra Pradesh

August 4, 2026
Avaada

Avaada secures $1.3 billion financing for 2.15 GW renewable energy portfolio

August 4, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Tata Power begins construction of 800 MW renewable energy project in Andhra Pradesh

Avaada secures $1.3 billion financing for 2.15 GW renewable energy portfolio

Vikran Engineering secures Rs 1.21 billion POWERGRID substation order

Cabinet Approves Rs 50.7 Billion Floating Solar Policy

Brookfield launches renewable energy platform Lumara

BSPGCL Floats Tender for 150 MW Solar-BESS Projects

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved