Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable

SJVN Unveils Results for 448 MW Renewable Energy Auction

Palak by Palak
March 4, 2025
in Renewable
Reading Time: 1 min read
0
SJVN
Share on FacebookShare on TwitterShare on Linkedin

RELATED POSTS

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

SJVN Limited has announced the results of its auction for 448 MW of inter-state transmission system (ISTS)-connected firm and dispatchable renewable energy (FDRE) projects, part of its 1,200 MW FDRE tender. ReNew Solar Power secured 100 MW at a tariff of Rs 4.82 per kWh, EG Energy Development  won 60 MW at Rs 4.86 per kWh, Dineshchandra R Agrawal Infracon secured 100 MW at Rs 4.86 per kWh, Serentica Renewables India won 100 MW at Rs 4.89 per kWh, and Tata Power Renewable Energy was awarded 88 MW at Rs 4.91 per kWh. The tender, issued in July 2024, also included a greenshoe option for an additional 1,200 MW, with a minimum bid requirement of 50 MW and a maximum of 600 MW. The projects will deploy commercially established and operational technologies to mitigate technology-related risks and ensure timely commissioning. The annual capacity utilisation factor for these projects must not be less than 75 per cent. For solar modules and balance of systems, the projects will adhere to government technical guidelines for grid-connected solar photovoltaic systems applicable at the time of commissioning. Wind power projects will also comply with the relevant regulatory standards.

Tags: powerRenewable EnergySJVNsolar
ShareTweetShare
Palak

Palak

Related Posts

Renewable Energy

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

by Urja Daily
November 12, 2026
0

The Telangana Electricity Regulatory Commission (TGERC) has granted in-principle approval to state distribution companies, Telangana State Southern Power Distribution Company...

Solar

TNB and IOI partner for 500 MW solar project in Malaysia

by Urja Daily
November 12, 2026
0

Tenaga Nasional Bhd (TNB) plans to invest up to RM424.4 million in a joint venture (JV) with IOI Corp Bhd...

Vikran Engineering

Vikran Engineering Posts 25% YoY Revenue Growth in Q2 FY27, Expands Solar EPC and Power T&D Presence

by Urja Daily
November 6, 2026
0

Thane : Vikran Engineering Limited, one of India's fast-growing EPC companies with a diversified presence across Power Transmission & Distribution,...

Wind Turbins

Datta Infra Strengthens Renewable Energy Portfolio with 110 MW Wind PPA with SJVN

by Urja Daily
November 5, 2026
0

Adyant Alpha Power Private Limited, a Datta Infra group company, has signed a 110 MW wind power purchase agreement (PPA)...

Wind

South Korea announces 2.2 GW offshore wind auction

by Urja Daily
November 5, 2026
0

South Korea’s Ministry of Climate, Energy and Environment has announced an auction for approximately 2.2 GW of offshore wind capacity...

Next Post
Galp

Galp Secures €430 Million from EIB for Renewable Hydrogen Initiative

Metis Engineering Sensor Family

Metis Engineering Unveils Family of Advanced CAN-Based Environmental Sensors for Safer Energy Storage

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved