Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

SECI Releases Tender for 2 GWh Standalone Battery Energy Storage System

editor by editor
July 2, 2024
in Tenders
Reading Time: 1 min read
0
Solar Energy Corporation of India
Share on FacebookShare on TwitterShare on Linkedin

The Solar Energy Corporation of India (SECI) has issued a request for proposals to establish 1,000 MW/ 2,000 MWh standalone battery energy storage systems (BESS). The projects will be located in India.

According to the tender guidelines, the bidders are required to submit Rs 341,000 per MWh per project as an earnest money deposit. The developers are required to furnish Rs 852,500 per MWh per project as a performance bank guarantee. The bid submission deadline is August 5, 2024.

RELATED POSTS

RECPDCL floats tender for development of ISTS to evacuate 2 GW of solar power

Sembcorp Wins 150 MW FDRE Allocation in SJVN’s 6,000 MWh Tender

The bidders are required to submit a single bid with total minimum and maximum project capacity of 50 MW/ 100 MWh and 1,000 MW/2,000 MWh, respectively. In order to minimise technological uncertainties and guarantee the timely commissioning of projects, only commercially proven and operational technologies are allowed for implementation.

Tags: Batter EnergyBESSSECITechnology
ShareTweetShare
editor

editor

Related Posts

RECPDCL

RECPDCL floats tender for development of ISTS to evacuate 2 GW of solar power

by Palak
March 16, 2026
0

REC Power Development and Consultancy (RECPDCL) has issued a request for proposal (RfP) for the development of an intrastate transmission...

Sembcorp

Sembcorp Wins 150 MW FDRE Allocation in SJVN’s 6,000 MWh Tender

by Palak
November 12, 2025
0

Sembcorp Industries, through its subsidiary Sembcorp Green Infra, has secured a 150 MW firm and dispatchable renewable energy (FDRE) project...

RECPDCL

RECPDCL Floats Tender for Maharashtra Substation Project

by Palak
September 3, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has floated a tender to set up a 400/132 kV AIS substation in...

Solar Energy

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

by Palak
August 8, 2025
0

Pavia Acque Scarl, the integrated water service company of Pavia city, has launched a €15.89 million tender for solar photovoltaic...

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

Next Post
Voltalia and Taqa Arabia

Voltalia and Taqa Arabia to Develop Green Energy in Egypt

Gunvor and Quercus

Gunvor and Quercus to Develop 3 GW Solar PV in Italy

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

MG Indian Super League

ISL 2026-27 to be known as the MG Indian Super League

October 2, 2026
Thousand Trails

TARIL Secures Large Order from Damodar Valley Corporation for 500 MVA and 200 MVA Auto Transformers

October 2, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

ISL 2026-27 to be known as the MG Indian Super League

TARIL Secures Large Order from Damodar Valley Corporation for 500 MVA and 200 MVA Auto Transformers

KP Group Unveils KP 3.0 Strategy to Drive Its Next Phase of Growth

ASDC Champions Shine at WorldSkills Shanghai 2026; Secure 5 Medals for Excellence

Honeywell Technologies Partner with Dangote to Accelerate Refinery Development

Yash Highvoltage Expands US Footprint to 22 States with New Midwest Partnership

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved