Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

SECI Announces 500 MW Offshore Wind Tender

Urja Daily by Urja Daily
September 18, 2024
in Wind, wind
Reading Time: 1 min read
0
SECI
Share on FacebookShare on TwitterShare on Linkedin

The Solar Energy Corporation of India (SECI) has issued a tender for 500 MW offshore wind projects (tranche-I) in Gujarat. The project will be connected to the inter state transmission system and be developed on a build-own-operate basis. It will be developed in a 202 sq. km area in the Gulf of Khambhat, off the coast of Gujarat. The last date of bid submission is December 10, 2024.

According to the tender guidelines, the bidders have to submit a document fee of Rs 50,000 and a bid processing fee of Rs 2 million. Both of these amounts are non-refundable. Bidders should submit an earnest money deposit of Rs 3.7 million.

RELATED POSTS

Gujarat Urja Vikas Nigam Limited Announces Winners of 250 MW Wind Power Auction

Made in India, Made for the World: India’s Wind Power Converter Manufacturing Reaches New Scale

The developer will have to establish offshore wind projects connected to an ISTS, set up the transmission network up to the interconnection/delivery point, identifying land for onshore manufacturing, storage, and assembly of wind turbine components and wind turbines and other associated parts.

SECI will enter into a power purchase agreement with the winning bidder for 25 years. The project will be allowed to apply for viability gap funding (VGF). The maximum amount receivable is Rs 81.28 million per MW of the contracted capacity. The MNRE will also enter into a 35 year seabed lease with the developer.

Tags: ISTSpowerSECIWind
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

GUVNL

Gujarat Urja Vikas Nigam Limited Announces Winners of 250 MW Wind Power Auction

by Palak
July 13, 2026
0

Gujarat Urja Vikas Nigam Limited (GUVNL) has announced the winners of its auction to procure power from 250 MW of...

Delta Electronics India

Made in India, Made for the World: India’s Wind Power Converter Manufacturing Reaches New Scale

by Palak
July 11, 2026
0

India's wind sector is crossing a meaningful manufacturing milestone. For years, much of the critical equipment inside turbines—especially converters that...

NTPC

NTPC Green Energy Limited Commissions 50.4 MW Vanki Wind Project in Gujarat

by Palak
July 10, 2026
0

NTPC Green Energy Limited (NGEL) has declared the commercial operation of the first part capacity of 50.4 MW of the...

Solar and Wind

Hexa Climate signs 100 MW wind-solar hybrid PPA with CESC

by Palak
July 9, 2026
0

Hexa Climate has signed a power purchase agreement (PPA) with CESC Limited for the supply of 100 MW of inter-state...

Tata Power

Tata Power Commissions 100.8 MW Wind Project

by Palak
July 6, 2026
0

Tata Power Renewable Energy Limited (TPREL), a subsidiary of Tata Power Company Limited, has commissioned its 100.8 MW Jewali wind...

Next Post
Hygenco and REC

Hygenco and REC Sign MoU for Green Ammonia Project in Odisha

KSEB and SECI

KSEB and SECI ink deal for 500 MW solar power contract

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Automation Expo 2026 Invite

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

July 14, 2026
POWERGRID

POWERGRID secures LoI for ISTS augmentation project under TBCB

July 14, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

POWERGRID secures LoI for ISTS augmentation project under TBCB

JSW Energy arm bags Rs 4.4 billion BESS order from Bondada Engineering

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

SAEL bags solar module supply order from NTPC REL

Thailand Approves $1.99 Billion Investment in AI, Data Centres and Clean Energy

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved