Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

SECI Announces 500 MW Offshore Wind Tender

Urja Daily by Urja Daily
September 18, 2024
in Wind, wind
Reading Time: 1 min read
0
SECI
Share on FacebookShare on TwitterShare on Linkedin

The Solar Energy Corporation of India (SECI) has issued a tender for 500 MW offshore wind projects (tranche-I) in Gujarat. The project will be connected to the inter state transmission system and be developed on a build-own-operate basis. It will be developed in a 202 sq. km area in the Gulf of Khambhat, off the coast of Gujarat. The last date of bid submission is December 10, 2024.

According to the tender guidelines, the bidders have to submit a document fee of Rs 50,000 and a bid processing fee of Rs 2 million. Both of these amounts are non-refundable. Bidders should submit an earnest money deposit of Rs 3.7 million.

RELATED POSTS

South Korea announces 2.2 GW offshore wind auction

Vayona Energy wins 108 MW order from Continuum Green Energy

The developer will have to establish offshore wind projects connected to an ISTS, set up the transmission network up to the interconnection/delivery point, identifying land for onshore manufacturing, storage, and assembly of wind turbine components and wind turbines and other associated parts.

SECI will enter into a power purchase agreement with the winning bidder for 25 years. The project will be allowed to apply for viability gap funding (VGF). The maximum amount receivable is Rs 81.28 million per MW of the contracted capacity. The MNRE will also enter into a 35 year seabed lease with the developer.

Tags: ISTSpowerSECIWind
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Wind

South Korea announces 2.2 GW offshore wind auction

by Urja Daily
November 5, 2026
0

South Korea’s Ministry of Climate, Energy and Environment has announced an auction for approximately 2.2 GW of offshore wind capacity...

Vayavya Labs

Vayona Energy wins 108 MW order from Continuum Green Energy

by Urja Daily
November 3, 2026
0

Mumbai : Vayona Energy has secured a firm 108 MW order from Continuum Green Energy Limited, an Independent Power Producer...

petrovietnam

PetroVietnam and CIP advance 1 GW offshore wind project in Vietnam

by Urja Daily
November 2, 2026
0

Vietnam’s state-owned PetroVietnam and Denmark-based investment firm Copenhagen Infrastructure Partners (CIP) have signed a cooperation agreement to advance the 1...

Wind

PetroVietnam and CIP advance 1 GW offshore wind project in Vietnam

by Urja Daily
October 30, 2026
0

Vietnam’s state-owned PetroVietnam and Denmark-based investment firm Copenhagen Infrastructure Partners (CIP) have signed a cooperation agreement to advance the 1...

Powerica

Powerica receives LoI for 50 MW wind power project in Gujarat

by Urja Daily
October 26, 2026
0

Powerica Limited has received a letter of intent (LoI) from Gujarat Urja Vikas Nigam Limited (GUVNL) for a 50 MW...

Next Post
Hygenco and REC

Hygenco and REC Sign MoU for Green Ammonia Project in Odisha

KSEB and SECI

KSEB and SECI ink deal for 500 MW solar power contract

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026
Ampt

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

STM32 Summit 2026: STMicroelectronics announces its unified MCU platform, addressing technology convergence across industrial, automotive and physical AI applications

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved