Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Sarawak-Singapore Electricity Project to Begin Operations by 2031

editor by editor
May 22, 2024
in Power
Reading Time: 1 min read
0
Sarawak-Singapore Electricity
Share on FacebookShare on TwitterShare on Linkedin

The Government of Sarawak has announced that the electricity supply interconnection project between Sarawak, Malaysia and Singapore will commence commercial operations by 2031. This project includes installing around 720-km-long undersea cable connecting Tondong, Sarawak to Changi, Singapore.

Currently, technical research and survey work for the undersea cable route are underway. Additionally, a preliminary study is being conducted by Sarawak Energy and Tenaga Nasional Bhd (TNB) for a proposed electricity supply connection project from Sarawak to the peninsula region of Malaysia.

RELATED POSTS

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

Greenply Industries Marks Another Clean Energy Milestone with Second Power Purchase Agreement at Vadodara Plant

Furthermore, the electricity supply connection project to Sabah involves a 275-kV transmission line spanning 34 km from the Lawas substation in Sarawak to the Mengalong substation in Sabah.

Tags: powerSarawak SingaporeTenaga Nasional Bhd
ShareTweetShare
editor

editor

Related Posts

Shri V. Packirisamy

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

by Palak
June 3, 2026
0

Mumbai : The Government of India has appointed Shri V. Packirisamy as Director (Commercial) at Power Finance Corporation Limited (PFC),...

Greenply Industries

Greenply Industries Marks Another Clean Energy Milestone with Second Power Purchase Agreement at Vadodara Plant

by Palak
June 2, 2026
0

Vadodara : Greenply Industries Limited has commissioned its second Power Purchase Agreement (PPA) at the Vadodara manufacturing facility, drawing electricity from...

STMicroelectronics

STMicroelectronics’ new GaN semiconductors improve energy efficiency for high-demand applications from AI servers to robotics

by Palak
May 29, 2026
0

New gallium nitride (GaN)-based power semiconductors from STMicroelectronics are designed to improve efficiency and increase power density in high-demand applications...

LTM

LTM to Drive AI-Powered Modernization of IT Infrastructure and Application Support for UK-based SSP Group

by Palak
May 25, 2026
0

Mumbai, India : LTM has entered a strategic partnership with SSP Group, a leading operator of food and beverage outlets in...

Adani Power

Adani Power Expands Portfolio with JPVL and Churk Thermal Agreements

by Palak
May 25, 2026
0

Adani Power Limited has signed definitive agreements with Jaiprakash Associates Limited (JAL) for acquisition of JAL’s 24 per cent stake...

Next Post
Enfinity Global

Enfinity Global Secures $135M Financing for 1.2 GW Solar and Wind Projects in India

FPT Industrial

FPT Industrial Showcases Sustainable Electric Solutions at ACT Expo

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Joint solar

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

June 3, 2026
Shri V. Packirisamy

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

June 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • How proper refurbishment can extend life of pre-owned bikes in India?

    0 shares
    Share 0 Tweet 0
  • ACWA Power Signs Landmark $10 Billion Clean Energy Agreements

    0 shares
    Share 0 Tweet 0

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

Sharika Enterprises Limited Enters SCADA-ADMS Market with Uttarakhand Grid Modernization Project

Cargill Launches Two-Year Livestock Development Initiative to Strengthen Maharashtra’s Dairy Sector

Flip Chip Technology Market Witnesses Rising Demand from Consumer Electronics Sector

Servotech Signs ₹400 Crore MoU for Haryana Manufacturing Expansion

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved