Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Sarawak-Singapore Electricity Project to Begin Operations by 2031

editor by editor
May 22, 2024
in Power
Reading Time: 1 min read
0
Sarawak-Singapore Electricity
Share on FacebookShare on TwitterShare on Linkedin

The Government of Sarawak has announced that the electricity supply interconnection project between Sarawak, Malaysia and Singapore will commence commercial operations by 2031. This project includes installing around 720-km-long undersea cable connecting Tondong, Sarawak to Changi, Singapore.

Currently, technical research and survey work for the undersea cable route are underway. Additionally, a preliminary study is being conducted by Sarawak Energy and Tenaga Nasional Bhd (TNB) for a proposed electricity supply connection project from Sarawak to the peninsula region of Malaysia.

RELATED POSTS

MSEDCL and PTSL Sign PPA for 2,500 MW Round-the-Clock Power Supply

MYIR Unveils MYC-JMX95X SMARC SOM: Secure Industrial Edge AI Powered by NXP i.MX95

Furthermore, the electricity supply connection project to Sabah involves a 275-kV transmission line spanning 34 km from the Lawas substation in Sarawak to the Mengalong substation in Sabah.

Tags: powerSarawak SingaporeTenaga Nasional Bhd
ShareTweetShare
editor

editor

Related Posts

MSEDCL

MSEDCL and PTSL Sign PPA for 2,500 MW Round-the-Clock Power Supply

by Urja Daily
September 10, 2026
0

Powerpulse Trading Solutions Limited (PTSL), a wholly owned subsidiary of Adani Energy Solutions Limited, has entered into a power purchase...

MYIR Unveils MYC-JMX95X SMARC SOM: Secure Industrial Edge AI Powered by NXP i.MX95

by Urja Daily
September 8, 2026
0

SHENZHEN, China — MYIR Electronics launched the MYC-JMX95X, a high-performance SMARC System-on-Module (SOM) based on the NXP i.MX95 applications processor....

NTPC

NTPC Limited Strengthens Supplier Ecosystem with Velocious

by Urja Daily
September 8, 2026
0

Bengaluru, Karnataka, India - NTPC Limited, India's largest power generation company under the Ministry of Power, Government of India, today...

ACS Energy

Karnataka Targets 66 GW Power Capacity by 2030: Energy Department Additional Chief Secretary Gaurav Gupta

by Palak
September 5, 2026
0

New Delhi, Delhi, India - Karnataka has unveiled a 10-year roadmap to scale its installed power capacity from over 39...

TARIL

TARIL Enters Nuclear Sector with Landmark NPCIL Order

by Palak
August 31, 2026
0

Ahmedabad : Transformers and Rectifiers (India) Limited (TARIL), a leading manufacturer of transformers and reactors, has secured a large order...

Next Post
Enfinity Global

Enfinity Global Secures $135M Financing for 1.2 GW Solar and Wind Projects in India

FPT Industrial

FPT Industrial Showcases Sustainable Electric Solutions at ACT Expo

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Ravindra Chauhan, Senior Management Officer – Business Development - POWERCON

POWERCON Group Deepens Leadership Bench with Ravindra Chauhan’s Appointment

September 12, 2026
Grew Solar

GREW Solar Strengthens West India Presence with New Distribution Partnership with Indogreen Infra LLP

September 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0

POWERCON Group Deepens Leadership Bench with Ravindra Chauhan’s Appointment

GREW Solar Strengthens West India Presence with New Distribution Partnership with Indogreen Infra LLP

ESSCI Partners with Aditya Birla Group to Skill 40,000 Electricians Across India

ELCIA Tech Summit 2026 Positions Electronics City as a GCC Growth Hub

Palantir and Fujitsu Deepen Partnership to Advance Enterprise AI Transformation, with Fujitsu Strengthening as a Global FDE Partner

Flow Battery Market Size Worth USD 4,074.68 Billion by 2034 | CAGR: 23.46%

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved