Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

PUB Announces Tender for Construction of Large-Scale Floating Solar Unit in Singapore

editor by editor
June 28, 2024
in Tenders
Reading Time: 1 min read
0
Floating Solar Unit in Singapore
Share on FacebookShare on TwitterShare on Linkedin

The Public Utilities Board (PUB) is inviting interested parties to participate in a tender exercise for the construction of a large-scale floating solar photovoltaic (PV) project at Pandan Reservoir in Singapore.

The selected contractor will handle the design, engineering, procurement, construction, installation, testing, and commissioning (EPCC) of the Selco Solar PV Plant at Sungai Selangor Phase 1 Water Treatment Plant – Package L5. Eligible tenderers must be registered with the Building Construction Authority (BCA) in ME03 (Solar PV System Integration) or ME05 (Electrical Engineering) financial grade L6. Tenders must remain valid for 270 days from the closing date, during which no withdrawal is allowed. The last date for submitting bids is September 26, 2024. Works under the contract, valued at RM21 million, is set to begin in March 2025. Eligible tenderers must be registered with the Building Construction Authority (BCA) in ME03 (Solar PV System Integration) or ME05 (Electrical Engineering) financial grade L6. Tenders must remain valid for 270 days from the closing date, during which no withdrawal is allowed.

RELATED POSTS

RECPDCL floats tender for development of ISTS to evacuate 2 GW of solar power

Sembcorp Wins 150 MW FDRE Allocation in SJVN’s 6,000 MWh Tender

Tags: EPCCPFloating Solar PVPUBsolar
ShareTweetShare
editor

editor

Related Posts

RECPDCL

RECPDCL floats tender for development of ISTS to evacuate 2 GW of solar power

by Palak
March 16, 2026
0

REC Power Development and Consultancy (RECPDCL) has issued a request for proposal (RfP) for the development of an intrastate transmission...

Sembcorp

Sembcorp Wins 150 MW FDRE Allocation in SJVN’s 6,000 MWh Tender

by Palak
November 12, 2025
0

Sembcorp Industries, through its subsidiary Sembcorp Green Infra, has secured a 150 MW firm and dispatchable renewable energy (FDRE) project...

RECPDCL

RECPDCL Floats Tender for Maharashtra Substation Project

by Palak
September 3, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has floated a tender to set up a 400/132 kV AIS substation in...

Solar Energy

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

by Palak
August 8, 2025
0

Pavia Acque Scarl, the integrated water service company of Pavia city, has launched a €15.89 million tender for solar photovoltaic...

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

Next Post
AMPIN

AMPIN Plans 246 MW Wind-Solar Hybrid Project with Rs 13 Billion Investment

MNRE

MNRE Updates Guidelines for Procuring Green Ammonia Production

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved