Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

POWERGRID wins India’s first ISTS SynCon project under TBCB

Palak by Palak
July 22, 2026
in News
Reading Time: 1 min read
0
POWERGRID
Share on FacebookShare on TwitterShare on Linkedin

Power Grid Corporation of India Limited (POWERGRID) has received a letter of intent (LoI) after emerging as the successful bidder under the tariff-based competitive bidding (TBCB) route, for the establishment of the inter-state transmission system (ISTS) project titled “Installation of 2 Nos. of Synchronous Condenser (SynCon) Units at 765/400/220 kV Fatehgarh-II Pooling Station”. The project will be implemented on a build, own, operate and transfer basis.

The project marks India’s first ISTS project awarded through the TBCB route exclusively for the installation of synchronous condensers. It involves the installation and commissioning of two synchronous condenser units at the Fatehgarh-II pooling station, along with associated bays.

RELATED POSTS

JVVNL and Global Energy Alliance plan sodium-ion BESS pilot in Jaipur

Teledyne FLIR’s Industry- First UL2684 Listing Gives APAC Fire Engineers a New Benchmark

Tags: ISTSpowergridSynConTBCB
ShareTweetShare
Palak

Palak

Related Posts

JVVNL

JVVNL and Global Energy Alliance plan sodium-ion BESS pilot in Jaipur

by Urja Daily
October 30, 2026
0

Jaipur Vidyut Vitran Nigam Limited (JVVNL) and the Global Energy Alliance for People and Planet have signed a memorandum of...

Teledyne

Teledyne FLIR’s Industry- First UL2684 Listing Gives APAC Fire Engineers a New Benchmark

by Urja Daily
October 30, 2026
0

Teledyne FLIR's A40 and A70 (Axx-Series) thermal imaging cameras are the first models to achieve UL 2684 listing. They are...

Comau

Comau and Automha Showcase End-to-End Food & Beverage Automation at Cibus Tec 2026

by Urja Daily
October 29, 2026
0

Comau and Automha will showcase an integrated portfolio of automation technologies spanning the food & beverage production and logistics flows...

Gateway Distriparks Limited

Gateway Distriparks announces its Q2 results

by Urja Daily
October 29, 2026
0

Gateway Distriparks Limited (GDL), a leading multimodal logistics company in India, announced its financial results for the quarter ended 30th...

Steamhouse

Steamhouse India Signs MoU with Haryana Government to Explore ₹500 Crore Industrial Infrastructure Investment

by Urja Daily
October 29, 2026
0

Surat - Steamhouse India Limited has signed a Memorandum of Understanding (MoU) with the Haryana Enterprises Promotion Centre (HEPC), Government of Haryana, to explore industrial infrastructure...

Next Post
Eurowind Energy

Eurowind Energy Romania Begins Construction of 138 MW Wind Projects

Tata Power

Tata Power Secures LoA for 324 MW Pumped Storage Project from SECI

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Mr. Vinay Thadani - Director & CEO - GREW Solar

GREW Solar Receives ALMM List-II Approval for 2.4 GW N-Type TOPCon G12R Cell Manufacturing Capacity, Supporting India’s Solar Self-Reliance Vision

November 1, 2026
SgurrEnergy

SgurrEnergy Crosses 240 GW Global Renewable Energy Milestone, Targets 400 GW by 2030

November 1, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

GREW Solar Receives ALMM List-II Approval for 2.4 GW N-Type TOPCon G12R Cell Manufacturing Capacity, Supporting India’s Solar Self-Reliance Vision

SgurrEnergy Crosses 240 GW Global Renewable Energy Milestone, Targets 400 GW by 2030

Avaada Electro achieves major milestone with 7.1 GW of ALMM-enlisted TOPCon Solar Cell Manufacturing Capacity

NEEPCO signs PPA with GUVNL for 164.4 MW power allocation

PetroVietnam and CIP advance 1 GW offshore wind project in Vietnam

JVVNL and Global Energy Alliance plan sodium-ion BESS pilot in Jaipur

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved