Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Power Mech Arm Secures 1 GWh BESS Contract from WBSEDCL with Greenshoe Flexibility

Palak by Palak
January 14, 2026
in Power
Reading Time: 1 min read
0
Power Mech
Share on FacebookShare on TwitterShare on Linkedin

PM Green Private Limited, a wholly owned subsidiary of Power Mech Projects Limited, has secured a contract from West Bengal State Electricity Distribution Company Limited (WBSEDCL) for the development of a 1 GWh battery energy storage system (BESS) project in West Bengal.

The project has been awarded by the Department of Power, Government of West Bengal and will be implemented under a build, own and operate model with a 100 per cent offtake guarantee from WBSEDCL. The scope of work includes design, financing, engineering, procurement, construction, operation and maintenance of a 250 MW/1,000 MWh BESS facility at the Goaltore substation in Paschim Medinapore. The contract also includes a greenshoe option for an additional 250 MW/1,000 MWh BESS project to be developed at the Durgapur Projects Limited campus in Durgapur.

RELATED POSTS

Singapore and the Philippines Advance Plans for Cross-Border Power Connectivity

POWERGRID Secures MCA Approval for Merger of 28 Wholly Owned Subsidiaries

The total revenue from the project is estimated at Rs 31.26 billion including the greenshoe option. The construction period is 18 months from the signing of the battery energy storage purchase agreement.

Tags: Battery EnergyBESSGreenshoePower MechStorageWBSEDCL
ShareTweetShare
Palak

Palak

Related Posts

Power

Singapore and the Philippines Advance Plans for Cross-Border Power Connectivity

by Urja Daily
November 5, 2026
0

Singapore and the Philippines have agreed to explore opportunities for cross-border electricity interconnections and strengthen cooperation in nuclear energy.  The...

POWERGRID

POWERGRID Secures MCA Approval for Merger of 28 Wholly Owned Subsidiaries

by Urja Daily
November 5, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has received approval from the Ministry of Corporate Affairs (MCA) for the merger...

NEEPCO

NEEPCO signs PPA with GUVNL for 164.4 MW power allocation

by Urja Daily
October 30, 2026
0

North Eastern Electric Power Corporation Limited (NEEPCO) has signed a power purchase agreement (PPA) with Gujarat Urja Vikas Nigam Limited...

Electricity

MoP releases National Electricity Data Sharing Framework 2026

by Urja Daily
October 30, 2026
0

The Ministry of Power has released the National Electricity Data Sharing Framework 2026 to establish common practices for sharing operational,...

NLC India

NLC India Signs MoUs with IPICOL to Develop Power and Industrial Projects in Odisha

by Urja Daily
October 27, 2026
0

NLC India Limited (NLCIL) has signed memoranda of understanding with the Industrial Promotion and Investment Corporation of Odisha Limited (IPICOL)...

Next Post
Meghmani Organics

Meghmani Organics Signs Pact to Source Power from Wind-Solar Hybrid Project in Gujarat

Shakti Pumps

Shakti Pumps Wins ₹654 Crore Solar Pump Order Under PM-KUSUM in Karnataka

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved