Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Hydrogen

NTPC Renewable Energy Invites Bids for 2 MW Green Hydrogen Electrolyser in Chhattisgarh

Palak by Palak
April 28, 2025
in Hydrogen
Reading Time: 1 min read
0
NTPC Renewable Energy
Share on FacebookShare on TwitterShare on Linkedin

NTPC Renewable Energy (NTPC REL) has invited bids for the installation of a 2 MW green hydrogen generation system or electrolyser at Sipat, Chhattisgarh, as part of its green hydrogen mobility project. The final project capacity may vary between 1 MW and 2 MW depending on NTPC REL’s requirements. 

According to the tender guidelines, the bidders are required to submit a security deposit of Rs 2 million. The selected bidders will be responsible for designing, engineering, erecting, testing, and commissioning the hydrogen mobility project. Furthermore, they must handle the delivery and receipt of project equipment and conduct all necessary safety assessments, including the hazard identification and risk assessment study. The last date for bid submission is May 7, 2025.

RELATED POSTS

POWERGRID receives LoI for green hydrogen transmission project under TBCB

JSW Energy Commissions 150 MW Tidong Hydro Project

Additionally, the bidders must also finalise the hydrogen generation layout for obtaining approvals from the Petroleum and Explosives Safety Organization and the local administration. The entire project is required to be completed within eight months. According to the eligibility criteria, the bidders must be electrolyser technology providers who were previously selected through an earlier expression of interest issued by NTPC REL and must have signed electrolyser technology provider agreements.

Tags: HydrogenNTPC Renewable EnergyPetroleumTechnology
ShareTweetShare
Palak

Palak

Related Posts

POWERGRID

POWERGRID receives LoI for green hydrogen transmission project under TBCB

by Palak
June 16, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has received a letter of award (LoI) under tariff-based competitive bidding (TBCB) for...

JSW Energy

JSW Energy Commissions 150 MW Tidong Hydro Project

by Palak
June 16, 2026
0

JSW Neo Energy Limited, a wholly owned subsidiary of JSW Energy Limited, has commissioned the entire 150 MW capacity of...

H2 Core

H2 Core Systems builds scalable hydrogen energy solutions with Siemens Xcelerator

by Palak
May 19, 2026
0

Siemens’ software and automation portfolio enables modular hydrogen energy system manufacturer to accelerate design, eliminate production errors and respond to...

NHPC

NHPC Set to Operationalise Fourth Unit of Subansiri Hydro Project

by Palak
May 7, 2026
0

NHPC Limited has declared the commercial operation date (CoD) of the fourth 250 MW unit of the Subansiri Lower Hydroelectric...

Advait Greenergy

Advait Greenergy inaugurates 30 MW alkaline electrolyser assembly facility in Gujarat

by Palak
March 16, 2026
0

Advait Greenergy Private Limited, a subsidiary of Advait Energy Transitions Limited, has inaugurated a 30 MW alkaline electrolyser assembly facility...

Next Post
Reliance

Reliance Launches Solar Manufacturing Line

Iberdrola

Iberdrola and Kansai Seal Deal for 315 MW Baltic Sea Offshore Wind Farm

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

FPT

FPT And Green Power Systems Help Boost Algeria’s Powdered Milk Production

June 23, 2026
Utkarsh Gupta

Gruner’s CBG Plant Sets Asia Record with 23.5 TPD Output, Achieves 120% of Design Capacity at Satna

June 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • How proper refurbishment can extend life of pre-owned bikes in India?

    0 shares
    Share 0 Tweet 0

FPT And Green Power Systems Help Boost Algeria’s Powdered Milk Production

Gruner’s CBG Plant Sets Asia Record with 23.5 TPD Output, Achieves 120% of Design Capacity at Satna

Integrals Power Validates Sustainably Produced Iron Phosphate Precursor and LFP Cathode Material in Cell Level at University of St Andrews

Power Transmission is the Foundation of Economic Growth

VinFast India, Tata Capital Join Hands for Dealer Financing

Sodium-Ion and Zinc-Air Batteries: The Future of Sustainable Energy Storage

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved