Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

NTPC REL Invites Bids for 110 MW Wind Project in Gujarat

Palak by Palak
February 18, 2025
in Wind
Reading Time: 2 mins read
0
NTPC REL
Share on FacebookShare on TwitterShare on Linkedin

NTPC Renewable Energy Limited (NTPC REL) has issued a tender for the supply and installation of wind turbine generators for a 110 MW interstate transmission system-connected wind energy project at Khavda NTPC Renewable Energy Park in Gujarat. The deadline for the bid submission is March 25, 2025. 

According to the tender guidelines, the bidders must submit a bid security of Rs 100 million, with the cost of the bidding documents being Rs 22,500. The project scope includes designing, engineering, manufacturing, supplying, erecting, installing, testing, and commissioning wind turbine generators with a minimum capacity of 3 MW. Additionally, the bidders are required to establish guaranteed performance parameters for the entire wind power project by installing the offered wind turbine generators, control panels, SCADA, and control systems software at NTPC REL’s Pooling Substations 2 and 3. Bidders will also be responsible for the comprehensive operation and maintenance of the entire system for ten years after commissioning. This includes supplying spare parts and consumables, as well as repairing or replacing faulty equipment. They must obtain the necessary statutory approvals and clearances for power evacuation and grid connectivity while coordinating with state nodal renewable energy agencies as required.

RELATED POSTS

Hungary Targets Over 6 GW of Wind Power Capacity by 2040, Report Says

JSW Energy places orders for two 800 MW turbine generators for Salboni Phase II

According to the eligibility criteria, the bidders must have a minimum average annual turnover of at least Rs 3.27 billion over the past three years. Additionally, they must have a positive net worth on the last day of the preceding financial year. Only manufacturers of approved wind turbine generators with a minimum capacity of 3 MW, listed in the latest Revised List of Models and Manufacturers issued by the Ministry of New and Renewable Energy before the bid opening date, are eligible to participate. Moreover, NTPC REL intends to finance the project using its own resources.

Tags: NTPC RELRenewable EnergyWind
ShareTweetShare
Palak

Palak

Related Posts

Hungary

Hungary Targets Over 6 GW of Wind Power Capacity by 2040, Report Says

by Urja Daily
October 13, 2026
0

Hungary could connect to the grid more than 6 GW of wind farms by 2040 in an attempt to reduce...

JSW Energy

JSW Energy places orders for two 800 MW turbine generators for Salboni Phase II

by Urja Daily
September 28, 2026
0

JSW Thermal Energy Limited, a wholly owned subsidiary of JSW Energy Limited, has placed an order with its associate company,...

Solar Wind

AMPIN Energy Transition Raises $100 Million Investment from Norfund

by Urja Daily
September 24, 2026
0

The Climate Investment Fund, managed by Norfund, will invest up to $100 million in AMPIN Energy Transition. The investment will...

Wind and Solar Farms

Network Infrastructure for Wind and Solar Farms

by Palak
September 1, 2026
0

Bangalore - R&M, the globally active developer and provider of infrastructure solutions for data and communications networks, based in Wetzikon,...

WestWind Energy

WestWind Energy Gets Approval for 122 MW Australian Wind Project

by Palak
August 18, 2026
0

WestWind Energy has received planning approval for the Normanville Energy Park. The park will consist of a 122 MW wind...

Next Post
Waaree RTL

Waaree RTL Wins 40 MWh BESS Order from Continuum Green Energy

Aslan Energy Capital

Aslan Energy Capital Signs MoU to Supply Green Hydrogen to CalYan XGH

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

October 23, 2026
Emmvee

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

October 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

Fujiyama Power Systems Limited clarifying the potential impact of China’s proposed export restrictions on solar cell manufacturing technology and machinery

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved