Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

NTPC floats tender for 215 MW wind project

Palak by Palak
February 17, 2026
in Wind
Reading Time: 1 min read
0
Wind
Share on FacebookShare on TwitterShare on Linkedin

NTPC Green Energy Limited (NGEL), a wholly owned subsidiary of NTPC Limited, has floated a tender for the development of a 215 MW wind project for IndianOil NTPC Green Energy Limited (INGEL). INGEL is a joint venture between NGEL and the Indian Oil Corporation. The project will be situated at the Anantapur-II interstate transmission system (ISTS) substation in Andhra Pradesh under Tranche-III.

According to the tender guidelines, the scope of work covers the design, engineering, micro-siting, manufacturing, erection, testing, installation, and commissioning of the wind project. It also involves providing 10 years of operations and maintenance for the project, along with supplying mandatory spares.

RELATED POSTS

South Korea announces 2.2 GW offshore wind auction

Vayona Energy wins 108 MW order from Continuum Green Energy

Furthermore, the selected bidders are required to provide the wind-monitoring masts and the external extra-high-voltage transmission line to the ISTS substation. They are also required to construct all the project site roads, storage area, and sheds, and obtain the project transfer of title/lease deeds, the right-of-way, and infrastructure development approvals, and transfer them to NGEL. The bid submission deadline is March 27, 2026. 

Tags: NGELNTPCWind
ShareTweetShare
Palak

Palak

Related Posts

Wind

South Korea announces 2.2 GW offshore wind auction

by Urja Daily
November 5, 2026
0

South Korea’s Ministry of Climate, Energy and Environment has announced an auction for approximately 2.2 GW of offshore wind capacity...

Vayavya Labs

Vayona Energy wins 108 MW order from Continuum Green Energy

by Urja Daily
November 3, 2026
0

Mumbai : Vayona Energy has secured a firm 108 MW order from Continuum Green Energy Limited, an Independent Power Producer...

petrovietnam

PetroVietnam and CIP advance 1 GW offshore wind project in Vietnam

by Urja Daily
November 2, 2026
0

Vietnam’s state-owned PetroVietnam and Denmark-based investment firm Copenhagen Infrastructure Partners (CIP) have signed a cooperation agreement to advance the 1...

Wind

PetroVietnam and CIP advance 1 GW offshore wind project in Vietnam

by Urja Daily
October 30, 2026
0

Vietnam’s state-owned PetroVietnam and Denmark-based investment firm Copenhagen Infrastructure Partners (CIP) have signed a cooperation agreement to advance the 1...

Powerica

Powerica receives LoI for 50 MW wind power project in Gujarat

by Urja Daily
October 26, 2026
0

Powerica Limited has received a letter of intent (LoI) from Gujarat Urja Vikas Nigam Limited (GUVNL) for a 50 MW...

Next Post
NLC India

NLC India signs MoU with NALCO for thermal and renewable energy collaboration

Enlight Renewable Energy Limited

Goa issues tender for solar plus storage project

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved