Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

MNRE Releases Standard Operating Procedures for ALMM Wind and Wind Turbine Certification

Palak by Palak
November 3, 2025
in Wind
Reading Time: 2 mins read
0
MNRE
Share on FacebookShare on TwitterShare on Linkedin

The Ministry of New and Renewable Energy (MNRE) has released standard operating procedures (SOP) for the Approved List of Models and Manufacturers (ALMM) Wind and ALMM wind turbine components (ALMM-WTC). According to the SOP, a wind turbine model can be listed in the ALMM Wind only if it holds a valid type certificate from an accredited certification body. The certificate should clearly specify the components, such as blades, towers, gearboxes, generators, and bearings. Additionally, such elements must conform to the relevant technical and performance standards.

Additionally, the ALMM-WTC listing process starts once a component is approved within a certified wind turbine design. Manufacturers for the components must provide comprehensive documentation, following which the ALMM-WTC committee reviews the submission and requires an on-site factory inspection to evaluate infrastructure, quality assurance processes, and testing facilities. The inspection fee is Rs 0.15 million plus applicable taxes for each component type. Furthermore, upon successful evaluation, applicants are recommended for inclusion in the ALMM-WTC list.

RELATED POSTS

South Korea announces 2.2 GW offshore wind auction

Vayona Energy wins 108 MW order from Continuum Green Energy

The SOP released by the MNRE further lays down clear definitions to differentiate between new turbine models and variants. A new model must involve design changes such as different generator technology, drive train configuration, or rotor diameter and rated power deviations. Furthermore, minor variations like hub height or wind class adjustments are treated as variants. Moreover, newly listed turbine models will be granted a temporary waiver from sourcing components exclusively from the ALMM-WTC list for up to 800 MW of capacity within two years of their enlistment.

Earlier in August 2025, MNRE renamed the Revised List of Models and Manufacturers of Wind Turbines as the ALMM Wind.

Tags: ALMMMNREWind Turbine
ShareTweetShare
Palak

Palak

Related Posts

Wind

South Korea announces 2.2 GW offshore wind auction

by Urja Daily
November 5, 2026
0

South Korea’s Ministry of Climate, Energy and Environment has announced an auction for approximately 2.2 GW of offshore wind capacity...

Vayavya Labs

Vayona Energy wins 108 MW order from Continuum Green Energy

by Urja Daily
November 3, 2026
0

Mumbai : Vayona Energy has secured a firm 108 MW order from Continuum Green Energy Limited, an Independent Power Producer...

petrovietnam

PetroVietnam and CIP advance 1 GW offshore wind project in Vietnam

by Urja Daily
November 2, 2026
0

Vietnam’s state-owned PetroVietnam and Denmark-based investment firm Copenhagen Infrastructure Partners (CIP) have signed a cooperation agreement to advance the 1...

Wind

PetroVietnam and CIP advance 1 GW offshore wind project in Vietnam

by Urja Daily
October 30, 2026
0

Vietnam’s state-owned PetroVietnam and Denmark-based investment firm Copenhagen Infrastructure Partners (CIP) have signed a cooperation agreement to advance the 1...

Powerica

Powerica receives LoI for 50 MW wind power project in Gujarat

by Urja Daily
October 26, 2026
0

Powerica Limited has received a letter of intent (LoI) from Gujarat Urja Vikas Nigam Limited (GUVNL) for a 50 MW...

Next Post
Joint Solar

Joint Solar Showcased Innovative Solar Solutions at REI Expo 2025

Mr. Saleem Ahmed, Officiating Head, ESSCI

Celebrating the Backbone of Electronics Manufacturing: The Assembly Line Experts

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026
Ampt

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

STM32 Summit 2026: STMicroelectronics announces its unified MCU platform, addressing technology convergence across industrial, automotive and physical AI applications

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved