Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

MNRE Expands ALMM Solar Module Capacity by 2 GW

Urja Daily by Urja Daily
October 1, 2024
in Solar
Reading Time: 1 min read
0
MNRE
Share on FacebookShare on TwitterShare on Linkedin

The Ministry of New and Renewable Energy (MNRE) has increased the solar module capacity on the Approved List of Models and Manufacturers (ALMM) by 2,084 MW. The new total module manufacturing capacity now stands at 56.5 GW. The new entrants on the list include Junna Solar System (94 MW), Sun N Sand Exim (69MW), and Powertrac Solar Projects (47 MW). Companies like Waaree Energies, RenewSys India, and Goldi Solar have further increased their enlisted capacity by 1,144 MW, 495 MW, and 235 MW, respectively.

Sunbond Energy, has been included in the provisional ALMM list with an applied capacity of 290 MW but its current enlisted capacity is 60 MW.

RELATED POSTS

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

Servotech Renewable Launches New TVC for Solar Lithium Batteries Featuring Sonu Sood

MNRE has also revised the guidelines for the inspection and final enlistment of provisionally listed manufacturers. Now, the final enlistment must be completed within two months of the application. The provisional enlistment automatically becomes final after two months if the inspection has been conducted by the National Institute of Solar Energy (NISE) but MNRE has not yet received the recommendation.

Tags: ALMMJunna Solar SystemMNRENISESunbond Energy
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Shweta Solar

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

by Palak
August 22, 2026
0

New Delhi : The rooftop solar market in India has moved well beyond the early stage of convincing households to...

Servotech Renewable Power System Ltd.

Servotech Renewable Launches New TVC for Solar Lithium Batteries Featuring Sonu Sood

by Palak
August 20, 2026
0

New Delhi : Servotech Renewable Power System Ltd. has launched its latest TVC under its ongoing brand campaign featuring actor...

KPI Green Energy

KPI Green Energy Commissions 130 MW Solar Capacity in Gujarat

by Palak
August 20, 2026
0

KPI Green Energy Limited has commissioned 130 MWac/195 MWdc of solar capacity under its 370 MWac/677 MWdc wind-solar hybrid power...

BESCOM Floats Tender for 500 MW Solar Projects

BESCOM Floats Tender for 500 MW Solar Projects

by Palak
August 20, 2026
0

Bangalore Electricity Supply Company Limited (BESCOM) has invited tenders for the installation of 500 MW of solar under the Mukhyamantri Saura...

Saatvik Green

Saatvik Solar Signs MoU for 3.6 GW Cell Plant in Odisha

by Palak
August 19, 2026
0

Saatvik Solar Industries Private Limited, a material subsidiary of Saatvik Green Energy Limited, has signed a memorandum of understanding (MoU)...

Next Post
Greenzo Energy

Greenzo Energy Wins TANGEDCO Green Hydrogen Project

HPCL

HPCL Issues EPC Tender for Floating Solar Projects in Rajasthan and Andhra Pradesh

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Beyond Installation: What Defines a Successful Industrial Solar Project?

August 22, 2026
Shweta Solar

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

August 22, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Beyond Installation: What Defines a Successful Industrial Solar Project?

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

VinFast India Partners with Federal Bank to Strengthen Dealer Financing Ecosystem

MC²+ Ignite Selects 30 Energy Deep-Tech Startups for Funding

Servotech Renewable Launches New TVC for Solar Lithium Batteries Featuring Sonu Sood

Nuvoton Begins Production of 16-Cell Battery Monitoring ICs for AI Servers

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved