Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

MNRE Expands ALMM Solar Module Capacity by 2 GW

Urja Daily by Urja Daily
October 1, 2024
in Solar
Reading Time: 1 min read
0
MNRE
Share on FacebookShare on TwitterShare on Linkedin

The Ministry of New and Renewable Energy (MNRE) has increased the solar module capacity on the Approved List of Models and Manufacturers (ALMM) by 2,084 MW. The new total module manufacturing capacity now stands at 56.5 GW. The new entrants on the list include Junna Solar System (94 MW), Sun N Sand Exim (69MW), and Powertrac Solar Projects (47 MW). Companies like Waaree Energies, RenewSys India, and Goldi Solar have further increased their enlisted capacity by 1,144 MW, 495 MW, and 235 MW, respectively.

Sunbond Energy, has been included in the provisional ALMM list with an applied capacity of 290 MW but its current enlisted capacity is 60 MW.

RELATED POSTS

BluPine Energy Achieves Financial Closure for 100 MW Solar Project in Gujarat

Vikram Solar bags 326.62 MW solar module supply order

MNRE has also revised the guidelines for the inspection and final enlistment of provisionally listed manufacturers. Now, the final enlistment must be completed within two months of the application. The provisional enlistment automatically becomes final after two months if the inspection has been conducted by the National Institute of Solar Energy (NISE) but MNRE has not yet received the recommendation.

Tags: ALMMJunna Solar SystemMNRENISESunbond Energy
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

BluPine Energy

BluPine Energy Achieves Financial Closure for 100 MW Solar Project in Gujarat

by Palak
May 14, 2025
0

BluPine Energy has secured the financial closure for its 100 MW solar power project in Tharad, Banaskantha district of Gujarat...

Vikram Solar

Vikram Solar bags 326.62 MW solar module supply order

by Palak
May 14, 2025
0

Vikram Solar Limited has received a supply order from Gujarat Industries Power Company Limited to supply 326.625 MW of high-efficiency...

Aypa Power

Aypa Power Secures $535 Million for Solar-Plus-Storage Project in California

by Palak
May 14, 2025
0

Aypa Power has secured $535 million in debt financing to support the development of its Vidal hybrid renewable energy project,...

SJVN Limited

SJVN Reveals Auction Results for 1,200 MW Solar Projects with 2.4 GWh Energy Storage

by Palak
May 14, 2025
0

SJVN Limited has announced the results of its auction for 1,200 MW of interstate transmission system connected solar power projects...

Vikram Solar

Vikram Solar Secures 326 MW Solar Project Order from GIPCL at Khavda

by Palak
May 12, 2025
0

Kolkata :  Vikram Solar Limited has secured a significant order from Gujarat Industries Power Company Limited. It will supply 326.625...

Next Post
Greenzo Energy

Greenzo Energy Wins TANGEDCO Green Hydrogen Project

HPCL

HPCL Issues EPC Tender for Floating Solar Projects in Rajasthan and Andhra Pradesh

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

IFC and Canada

IFC and Canada Back Husk to Drive Solar-Powered Growth in Rural Nigeria

May 15, 2025
SLP Innovation

SLP and Posterity Institute Launch Program to Boost UAE Market Entry for Innovators

May 15, 2025
  • 643 Followers
  • 23.9k Followers

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

IFC and Canada Back Husk to Drive Solar-Powered Growth in Rural Nigeria

SLP and Posterity Institute Launch Program to Boost UAE Market Entry for Innovators

BluPine Energy Achieves Financial Closure for 100 MW Solar Project in Gujarat

MEDA Issues Tender for 130 KTPA Green Hydrogen Facilities

Vikram Solar bags 326.62 MW solar module supply order

TCL Solar, Grid Africa to Deploy Renewables in Africa

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved