Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

MNRE Expands ALMM Solar Module Capacity by 2 GW

Urja Daily by Urja Daily
October 1, 2024
in Solar
Reading Time: 1 min read
0
MNRE
Share on FacebookShare on TwitterShare on Linkedin

The Ministry of New and Renewable Energy (MNRE) has increased the solar module capacity on the Approved List of Models and Manufacturers (ALMM) by 2,084 MW. The new total module manufacturing capacity now stands at 56.5 GW. The new entrants on the list include Junna Solar System (94 MW), Sun N Sand Exim (69MW), and Powertrac Solar Projects (47 MW). Companies like Waaree Energies, RenewSys India, and Goldi Solar have further increased their enlisted capacity by 1,144 MW, 495 MW, and 235 MW, respectively.

Sunbond Energy, has been included in the provisional ALMM list with an applied capacity of 290 MW but its current enlisted capacity is 60 MW.

RELATED POSTS

TNB and IOI partner for 500 MW solar project in Malaysia

Vikran Engineering Posts 25% YoY Revenue Growth in Q2 FY27, Expands Solar EPC and Power T&D Presence

MNRE has also revised the guidelines for the inspection and final enlistment of provisionally listed manufacturers. Now, the final enlistment must be completed within two months of the application. The provisional enlistment automatically becomes final after two months if the inspection has been conducted by the National Institute of Solar Energy (NISE) but MNRE has not yet received the recommendation.

Tags: ALMMJunna Solar SystemMNRENISESunbond Energy
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Solar

TNB and IOI partner for 500 MW solar project in Malaysia

by Urja Daily
November 12, 2026
0

Tenaga Nasional Bhd (TNB) plans to invest up to RM424.4 million in a joint venture (JV) with IOI Corp Bhd...

Vikran Engineering

Vikran Engineering Posts 25% YoY Revenue Growth in Q2 FY27, Expands Solar EPC and Power T&D Presence

by Urja Daily
November 6, 2026
0

Thane : Vikran Engineering Limited, one of India's fast-growing EPC companies with a diversified presence across Power Transmission & Distribution,...

Bluebird Solar

Bluebird Solar Expands BESS Solutions Across Industries

by Urja Daily
November 4, 2026
0

Bluebird Solar Private Limited has announced its entry into the Battery Energy Storage System (BESS) segment with a new portfolio...

ACME Solar

ACME Solar signs PPA with NTPC for 400 MW FDRE project

by Urja Daily
November 2, 2026
0

ACME Marigold Urja Private Limited, a wholly owned subsidiary of ACME Solar Holdings Limited, has signed a power purchase agreement...

Mr. Vinay Thadani - Director & CEO - GREW Solar

GREW Solar Receives ALMM List-II Approval for 2.4 GW N-Type TOPCon G12R Cell Manufacturing Capacity, Supporting India’s Solar Self-Reliance Vision

by Urja Daily
November 1, 2026
0

Mumbai / Ahmedabad : GREW Solar has received approval for the inclusion of its 2407 MW solar PV cell manufacturing capacity...

Next Post
Greenzo Energy

Greenzo Energy Wins TANGEDCO Green Hydrogen Project

HPCL

HPCL Issues EPC Tender for Floating Solar Projects in Rajasthan and Andhra Pradesh

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved