Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Kundan Green Energy Commissions Luni Hydro Plant in Himachal Pradesh

Urja Daily by Urja Daily
October 7, 2024
in Power
Reading Time: 1 min read
0
Kundan Green Energy
Share on FacebookShare on TwitterShare on Linkedin

Kundan Green Energy has commissioned a hydropower plant at Luni, Himachal Pradesh. It has a budget of approximately Rs 750 million. This will be the seventh operational plant in Dharamshala, Himachal Pradesh. The project was awarded in September of 2022. The Luni hydropower plant will bring operating hydropower capacities of Kundan Green Energy to 85 MW.

Currently, the existing solar, hydro and wind based installed generation projects of Kundan Green Energy stand at a capacity of 120.5 MW. Kundan Green Energy and its subsidiaries have four operational hydro power plants in Sikkim and three more are under construction, with larger capacities.

RELATED POSTS

Singapore and the Philippines Advance Plans for Cross-Border Power Connectivity

POWERGRID Secures MCA Approval for Merger of 28 Wholly Owned Subsidiaries

In April 2024, Kundan Green Energy announced its authorisation to build a new hydropower plant in Okhali, Uttarakhand. Scheduled for completion in 2028, the hydropower project will produce energy from 42 MW hydro project, with the potential to increase output to 60 MW in the future, significantly boosting Uttarakhand’s renewable energy capacity.

Tags: hydropowerKundan Green EnergyLuni Hydro Plant
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Power

Singapore and the Philippines Advance Plans for Cross-Border Power Connectivity

by Urja Daily
November 5, 2026
0

Singapore and the Philippines have agreed to explore opportunities for cross-border electricity interconnections and strengthen cooperation in nuclear energy.  The...

POWERGRID

POWERGRID Secures MCA Approval for Merger of 28 Wholly Owned Subsidiaries

by Urja Daily
November 5, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has received approval from the Ministry of Corporate Affairs (MCA) for the merger...

NEEPCO

NEEPCO signs PPA with GUVNL for 164.4 MW power allocation

by Urja Daily
October 30, 2026
0

North Eastern Electric Power Corporation Limited (NEEPCO) has signed a power purchase agreement (PPA) with Gujarat Urja Vikas Nigam Limited...

Electricity

MoP releases National Electricity Data Sharing Framework 2026

by Urja Daily
October 30, 2026
0

The Ministry of Power has released the National Electricity Data Sharing Framework 2026 to establish common practices for sharing operational,...

NLC India

NLC India Signs MoUs with IPICOL to Develop Power and Industrial Projects in Odisha

by Urja Daily
October 27, 2026
0

NLC India Limited (NLCIL) has signed memoranda of understanding with the Industrial Promotion and Investment Corporation of Odisha Limited (IPICOL)...

Next Post
Runergy

Runergy Opens Solar Module Manufacturing Plant in the US

Servotech

Servotech Secures Additional Order to Build EV Charging Stations for Nashik Municipal Corporation

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved