Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable

KSERC Issues Draft Regulations on Renewable Energy and Related Matters

Palak by Palak
June 13, 2025
in Renewable
Reading Time: 2 mins read
0
KSERC
Share on FacebookShare on TwitterShare on Linkedin

The Kerala State Electricity Regulatory Commission (KSERC) has released the draft Renewable Energy and Related Matters Regulations, 2025. The draft applies to grid-interactive renewable energy systems, captive consumers and generating projects, as well as consumers and prosumers across domestic, agriculture, and industrial categories, generating companies, distribution licensees, and other obligated entities. Consumers and prosumers in the identified categories are allowed to opt for net metering (1 kW–3 kW), net billing, gross metering, behind-the-meter, virtual net metering (minimum 10 kW), and group net metering systems. For net billing, renewable energy generating systems (REGS) capacity cannot exceed the connected load or 500 kW, whichever is lower. Inverter capacity for single-phase connections is capped at 3 kW. The cumulative capacity connected to a distribution transformer must not exceed 90 per cent of its rated capacity, and 30 per cent on each phase. Furthermore, independent power producers and captive consumers can request grid connectivity and must bear the cost of infrastructure upgrades. Entities generating electricity from renewable sources have the right to open access, but charges such as transmission losses, wheeling charges, and grid support charges will be applicable.

All REGS must have an automatic synchronisation device and meters that comply with Central Electricity Authority norms, including RS-485 or higher communication standards. Metering requirements differ based on system size: availability-based tariff (ABT)-compatible special energy meters for capacities of at least 1 MW, smart meters for 100 kW to below 1 MW systems, and smart meters for systems under 100 kW installed on or after April 4, 2027. Consumers with compliant meters are not required to install separate net meters. Prosumers with systems above 1 MW must install ABT-compatible meters within six months of notification. The distribution licensee will test, install, and maintain metering equipment, while eligible consumers must procure the renewable energy generation meter at their own cost. Virtual power plants must register with the distribution licensee and establish real-time monitoring systems. Electric vehicle owners, charging stations, and licensees are permitted to participate in vehicle-to-grid integration. A state agency will be designated within three months of the notification to monitor enforcement, develop a web portal, and collect data on fossil fuel-based generation and open access transactions from obligated entities.

RELATED POSTS

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

Obligated entities must fulfil both renewable purchase obligations (RPO) and energy storage obligations (ESO), including sourcing a share of their energy from renewables and storage systems. The energy stored as part of the ESO will count towards RPO compliance. Renewable energy procurement by distribution licensees must primarily follow tariff-based competitive bidding. Tariff periods for the project must match the project’s useful life period. KSERC may notify a generic tariff or, if petitioned, determine a project-specific tariff. The determined tariff will act as an upper ceiling. The tariff structure includes a single-part tariff covering equity (maximum 30 per cent of capital cost), loan capital, depreciation, and other associated costs, with a normative debt-equity ratio of 70:30 and loan tenure of 15 years. Carbon credit proceeds from registered clean development mechanism projects will be shared between generating companies and beneficiaries. Additionally, KSERC has outlined technology-specific norms as well. For wind, solar and hybrid projects, KSERC will determine project-specific capital costs, considering market trends. Furthermore, the annual mean wind density should be measured at a hub height of 100 metres. For small hydro projects, the normative capacity utilisation factor should be 30 per cent, excluding pump mode operation. Grid-scale standalone battery energy storage systems must have a minimum round-trip efficiency of 85 per cent.

Tags: Battery Energycarbon emissionESOKSERCRenewable EnergyRPOsolarStorage
ShareTweetShare
Palak

Palak

Related Posts

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

by Urja Daily
October 23, 2026
0

For Indian industries, investing in solar power has become an important step towards controlling electricity costs and meeting sustainability goals....

Fujitsu

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

by Urja Daily
October 21, 2026
0

Kawasaki, Nagoya, Yokosuka and Tokyo, Japan - Fujitsu Limited (Fujitsu), Nagoya University, Tokai National Higher Education and Research System (Nagoya University),...

VIKRAM SOLAR

Vikram Solar to establish 7.5 GWh BESS plant in Tamil Nadu

by Urja Daily
October 21, 2026
0

VSL PowerHive, a wholly owned subsidiary of Vikram Solar, has announced plans to establish a 7.5 GWh battery energy storage...

Vikram Solar

Vikram Solar secures 187 MW module supply order in Karnataka and Tamil Nadu

by Urja Daily
October 20, 2026
0

Vikram Solar has secured a 187 MW module supply order from a leading renewable energy developer in India for solar...

Techzeal

Techzeal Info Pvt. Ltd. is Set to Execute Next-Phase Growth Strategy, Expanding Beyond Conventional Solar EPC

by Urja Daily
October 19, 2026
0

Mumbai, Maharashtra, India - Techzeal Info Private Limited is preparing for a major transformation of its business model, with plans...

Next Post
Inox Wind

Inox Wind receives NCLT approval for merger of Inox Wind Energy

Origis Energy

Origis Energy Achieves Financial Close for Wheatland Solar Project with MUFG

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

October 23, 2026
Emmvee

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

October 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

Fujiyama Power Systems Limited clarifying the potential impact of China’s proposed export restrictions on solar cell manufacturing technology and machinery

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved