Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

WeWork India to develop 10 MWp solar power plant in Karnataka, accelerating its goal to transition to 100% renewable electricity

Expected to generate 15–16 million units of clean electricity annually and power ten WeWork India centres in Bengaluru - Investment strengthens company’s pathway to 100% renewable electricity by March 2028 while driving long-term energy cost efficiency

Palak by Palak
September 5, 2026
in Solar
Reading Time: 2 mins read
0
WeWork India
Share on FacebookShare on TwitterShare on Linkedin

BENGALURU : WeWork India Management Limited, the industry leader in the flexible workspace sector, today announced  plans to develop a 10 MWp (DC) ground-mounted solar power plant in Karnataka, marking a significant milestone in its goal to transition towards 100% renewable electricity by March 2028.

Targeted for commissioning in FY27, the plant is expected to generate approximately 15–16 million units of clean electricity annually. Once operational, it is expected to increase the share of renewable electricity across WeWork India’s portfolio from close to 40% currently to approximately 50%, bringing the company closer to its 100% renewable electricity goal. Nearly 80% of the plant’s output will support WeWork India’s operations, including 10 centres in Bengaluru. The remaining 20% of the plant’s output will be used for their future growth.

RELATED POSTS

Waaree Energies moves to merge Indosolar into the company

The “Solar Shelf-Life” Problem and how today’s Best Module Become Obsolete Before Its 25-Year Warranty Ends?

Karnataka is a strategic location for the investment, with Bengaluru representing WeWork India’s largest market at 30 operational centres. The state accounts for approximately 30% of the company’s total electricity consumption across its portfolio, making it a natural market to drive renewable energy adoption at scale. The solar plant will enable WeWork India to meet a meaningful share of this demand through renewable power, while reducing its reliance on conventional grid electricity.

Commenting on the development, Karan Virwani, Managing Director & CEO, WeWork India, said, “Bengaluru is our largest market, making it the natural starting point for an investment of this scale. As we grow, we want a greater share of that growth to be powered by clean energy, but we also want sustainability to make strong business sense. Building our own renewable generation capacity allows us to do both – reduce the carbon footprint of our operations while creating greater certainty over energy costs for the next 25 years. This is the kind of long-term investment we believe can make sustainability an integral part of how we scale, rather than an initiative that sits alongside the business.”

This investment also reflects WeWork India’s approach towards combining sustainability outcomes with disciplined capital allocation. With a design life of 25 years, the solar plant will provide greater long-term visibility over electricity costs for a significant part of its Bengaluru operations, helping insulate the portfolio from fluctuations in grid tariffs. Solar power is expected to provide electricity at a more competitive cost over the life of the asset, translating into operating efficiencies at the centres it serves. By combining owned renewable generation, captive consumption and open access, WeWork India is creating a more diversified energy sourcing model designed to deliver both lower-carbon operations and greater cost certainty.

The project is part of WeWork India’s broader effort to embed sustainability into the growth and operation of its portfolio. As enterprises increasingly look to reduce the environmental footprint of their operations and supply chains, access to workspaces powered by cleaner energy can also help support their wider sustainability ambitions. Expected to be commissioned by Q1 2027, the solar plant marks WeWork India’s progression from renewable electricity procurement towards direct investment in renewable generation capacity. As the company scales its portfolio, this approach is intended to ensure that growth is accompanied by a more resilient, efficient and lower-carbon energy model.

Tags: ElectricitypowerRenewable EnergysolarWeWork India
ShareTweetShare
Palak

Palak

Related Posts

Waaree Energies

Waaree Energies moves to merge Indosolar into the company

by Urja Daily
September 28, 2026
0

Waaree Energies Limited’s board of directors approved the draft scheme of amalgamation of Indosolar Limited with Waaree Energies Limited and...

Dushyant Kumar, PV Quality Manager

The “Solar Shelf-Life” Problem and how today’s Best Module Become Obsolete Before Its 25-Year Warranty Ends?

by Urja Daily
September 28, 2026
0

Rapid efficiency gains, falling costs and policy push in India are shortening the economic life of solar modules, raising new...

Solar Wind

AMPIN Energy Transition Raises $100 Million Investment from Norfund

by Urja Daily
September 24, 2026
0

The Climate Investment Fund, managed by Norfund, will invest up to $100 million in AMPIN Energy Transition. The investment will...

Ceigall India

Ceigall India’s Maharashtra Solar Project Reaches 10 MW capacity with Commissioning of Another 5 MW

by Urja Daily
September 22, 2026
0

National : Ceigall India Limited (CIL) announced that its wholly owned subsidiary (WOS), Ceigall Green Energy MH2 Limited, has successfully commissioned...

Grew Solar

Grew Solar Partners with Caelux, USA To Accelerate Next-Generation Solar Technology

by Urja Daily
September 16, 2026
0

Mumbai/Ahmedabad : GREW Solar, one of India's fastest-growing solar manufacturers, and Caelux Corporation (Caelux), a global leader in perovskite solar technology, today announced a 4 Gigawatt (GW), five-year commercialization partnership to produce high-power Hybrid-TandemTM solar modules with Caelux’s Energy...

Next Post
Solar

Solar Growth Accelerates: Utility-Scale Installations Rise 12% in August, Rooftop Reaches April Peak

Matthias Lapp leads LAPP Group as third-generation CEO

LAPP celebrates three decades in India as the country emerges as its largest market after Germany

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

JSW Energy

JSW Energy places orders for two 800 MW turbine generators for Salboni Phase II

September 28, 2026
IndiGrid

IndiGrid to Acquire Luhri Power Transmission from EnerGrid for Up to Rs13.36 Billion

September 28, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0

JSW Energy places orders for two 800 MW turbine generators for Salboni Phase II

IndiGrid to Acquire Luhri Power Transmission from EnerGrid for Up to Rs13.36 Billion

Nawgati Partners with Petrol Dealers Association (Thane, Raigad & Palghar) for AGM 2026

Pace Digitek arm secures major bess order from ntpc ge power services

Waaree Energies moves to merge Indosolar into the company

The “Solar Shelf-Life” Problem and how today’s Best Module Become Obsolete Before Its 25-Year Warranty Ends?

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved