Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

Jupiter Wagons secures 100 MW BESS projects in West Bengal 

Palak by Palak
August 12, 2026
in Storage
Reading Time: 1 min read
0
Jupiter Wagons
Share on FacebookShare on TwitterShare on Linkedin

Jupiter Wagons Limited, through e-reverse auctions conducted under tariff-based competitive bidding, has secured two standalone battery energy storage system (BESS) projects with a combined capacity of 100 MW/400 MWh from West Bengal State Electricity Distribution Company Limited (WBSEDCL). The projects will be located in Jeerat and Kharagpur, West Bengal.

Furthermore, the projects will be executed and operated by JEM Energy, a subsidiary of Jupiter Wagons. The scope includes the supply and commissioning of BESS projects worth approximately Rs 4 billion. The projects will be operated under a 15-year build-own-operate model with WBSEDCL.

RELATED POSTS

HKSTP Unveils Its First-Ever Strategic Analysis Report on Battery and Energy Storage

CTUIL sets BESS discharge requirements for ISTS connectivity

Following these wins, JEM Energy’s BESS order book has increased to around 500 MWh, including commercial & industrial projects, with a value of more than Rs 5 billion. The company is targeting a BESS order book of approximately Rs 10 billion by financial year 2026-27.

Tags: BESSElectricityJEM EnergyJupiter Wagons
ShareTweetShare
Palak

Palak

Related Posts

HKSTP

HKSTP Unveils Its First-Ever Strategic Analysis Report on Battery and Energy Storage

by Urja Daily
October 30, 2026
0

Responding to Global Energy Transition Demands: Energy security, renewable energy grid integration, accelerating electrification, and surging power demand from AI...

Battery Energy Storage

CTUIL sets BESS discharge requirements for ISTS connectivity

by Urja Daily
October 27, 2026
0

Central Transmission Utility of India Limited (CTUIL) has set minimum discharge durations for battery energy storage systems (BESS) seeking connectivity...

Battery storage

Himachal Pradesh Launches Spiti Valley’s First Solar Plant with Battery Storage

by Urja Daily
October 21, 2026
0

The 2 MW plant is paired with a 1 MWh battery energy storage system (BESS) and was built at a...

Premier Energies

Premier Energies Subsidiary Signs JV Agreement for 12 GWh BESS Manufacturing

by Urja Daily
October 20, 2026
0

Premier Energies Limited’s wholly owned subsidiary, Premier Battery Technologies Private Limited (PBTPL), has executed a share allotment cum shareholders agreement...

Pace Digitek Limited

Pace Digitek Secures 115 MWh Battery Energy Storage Project from BRPL

by Urja Daily
October 12, 2026
0

Pace Digitek Limited has received a letter of intent (LoI) from BSES Rajdhani Power Limited (BRPL) for a 57.5 MW/115...

Next Post
Purvah Green Power

Purvah Green to Acquire 1.4 GWp ReNew Solar Portfolio

HiNa Battery on WTF

Nikhil Kamath Explores the Battery Technologies That Could Power India's Next Manufacturing Wave

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Mr. Vinay Thadani - Director & CEO - GREW Solar

GREW Solar Receives ALMM List-II Approval for 2.4 GW N-Type TOPCon G12R Cell Manufacturing Capacity, Supporting India’s Solar Self-Reliance Vision

November 1, 2026
SgurrEnergy

SgurrEnergy Crosses 240 GW Global Renewable Energy Milestone, Targets 400 GW by 2030

November 1, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

GREW Solar Receives ALMM List-II Approval for 2.4 GW N-Type TOPCon G12R Cell Manufacturing Capacity, Supporting India’s Solar Self-Reliance Vision

SgurrEnergy Crosses 240 GW Global Renewable Energy Milestone, Targets 400 GW by 2030

Avaada Electro achieves major milestone with 7.1 GW of ALMM-enlisted TOPCon Solar Cell Manufacturing Capacity

NEEPCO signs PPA with GUVNL for 164.4 MW power allocation

PetroVietnam and CIP advance 1 GW offshore wind project in Vietnam

JVVNL and Global Energy Alliance plan sodium-ion BESS pilot in Jaipur

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved