Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

IOCL Tenders for 2.75 MW Solar Plant in Trichy

Urja Daily by Urja Daily
September 11, 2020
in News
Reading Time: 2 mins read
0
IOCL Tenders for 2.75 MW Solar Plant in Trichy
Share on FacebookShare on TwitterShare on Linkedin

The Indian Oil Corporation (IOCL) has issued a tender, inviting bids from eligible bidders for setting up of 2.75 MW ground-mounted solar power project at the firms’ LPG bottling plant in Trichy, Tamil Nadu.

IOCL proposes to set up the 2.75 MWp solar project for captive consumption at multiple IOCL locations across Tamil Nadu through the Open Access Agreement and Energy Wheeling Agreement. The project will be done through an EPC Contractor on LSTK basis.

RELATED POSTS

POWERCON Group Deepens Leadership Bench with Ravindra Chauhan’s Appointment

ESSCI Partners with Aditya Birla Group to Skill 40,000 Electricians Across India

The scope of work for the selected bidders will include the engineering, procurement and construction (EPC) work on the grid-connected solar project. Which will be followed by 5 years of comprehensive operation and maintenance services for the plant, from the date of successful commissioning.

The commissioning of the full capacity of the project must be completed within nine months from the date of the site handing over.

The last date for bid submission is September 22, 2020, and the techno-commercial buds will be opened on September 23, 2020. A pre-bid meeting has been scheduled for September 15, 2020, to address the concerns raised by the prospective bidders. All bidders will be required to submit an Earnest Money Deposit of Rs 9.6 lakh along with their bids, and there is no MSME preference under this tender.

Further, the manufacturer’s warranty for all bought out items shall be made available to the Owner and shall be valid for the entire defect liability period. And, the Manufacturer’s/Contractor’s warranty, for any replaced item shall also be made available to the Owner and shall be kept valid for the original warranty period.

The Photovoltaic modules shall have a product warranty of a minimum of 10 years and a performance warranty of 25 years from the date of commissioning and the inverters / PCUs shall be warranted for 5 years from the date of commissioning and the Supervisory Control and Data Acquisition (SCADA) System shall be warranted for minimum 5 years.

Tags: IndiaIndian OilIndian Oil Solar Plant in TrichySolar PlantTamil NaduTrichy
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Ravindra Chauhan, Senior Management Officer – Business Development - POWERCON

POWERCON Group Deepens Leadership Bench with Ravindra Chauhan’s Appointment

by Urja Daily
September 12, 2026
0

Pune : POWERCON Group has appointed Ravindra Chauhan as Senior Management Officer – Business Development. The appointment reinforces POWERCON's commercial...

ESSCI

ESSCI Partners with Aditya Birla Group to Skill 40,000 Electricians Across India

by Urja Daily
September 12, 2026
0

New Delhi: The Electronics Sector Skills Council of India (ESSCI) has partnered with the Aditya Birla Group’s Wires and Cables business...

ETC 2026 Inauguration_Mr. Sriram Kumar, Mr. Bhawesh Kumar, Mr. Kiron D. Shah, Mr. Anand Anandkumar, Dr. Veerappan V. V., and Ms. Nandini B

ELCIA Tech Summit 2026 Positions Electronics City as a GCC Growth Hub

by Urja Daily
September 12, 2026
0

Bengaluru : From AI in manufacturing and human-AI collaboration to healthcare, startups, aerospace and defence, urban mobility, quantum computing and...

Fujitsu

Palantir and Fujitsu Deepen Partnership to Advance Enterprise AI Transformation, with Fujitsu Strengthening as a Global FDE Partner

by Urja Daily
September 11, 2026
0

KAWASAKI and MIAMI - Palantir Technologies Inc. and Fujitsu Limited announced the renewal of their strategic partnership, with a deeper investment...

Power Mech

BNC Power Projects secures Rs 2.8 billion LoAs from MSETCL for AIS-to-GIS conversion

by Urja Daily
September 11, 2026
0

BNC Power Projects Limited has secured two turnkey engineering, procurement and construction (EPC) contracts worth over Rs 2.8 billion from...

Next Post
The IPO beginning of a new chapter Access To Capital Markets

The IPO beginning of a new chapter Access To Capital Markets

ISA announced Implementing Agency for ‘One Sun One World One Grid’ Initiative

ISA announced Implementing Agency for ‘One Sun One World One Grid’ Initiative

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Ravindra Chauhan, Senior Management Officer – Business Development - POWERCON

POWERCON Group Deepens Leadership Bench with Ravindra Chauhan’s Appointment

September 12, 2026
Grew Solar

GREW Solar Strengthens West India Presence with New Distribution Partnership with Indogreen Infra LLP

September 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0

POWERCON Group Deepens Leadership Bench with Ravindra Chauhan’s Appointment

GREW Solar Strengthens West India Presence with New Distribution Partnership with Indogreen Infra LLP

ESSCI Partners with Aditya Birla Group to Skill 40,000 Electricians Across India

ELCIA Tech Summit 2026 Positions Electronics City as a GCC Growth Hub

Palantir and Fujitsu Deepen Partnership to Advance Enterprise AI Transformation, with Fujitsu Strengthening as a Global FDE Partner

Flow Battery Market Size Worth USD 4,074.68 Billion by 2034 | CAGR: 23.46%

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved