Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Hitachi ABB Power Grids Commissions UHVDC Project in India

Urja Daily by Urja Daily
July 26, 2021
in Power, Smart Grid
Reading Time: 2 mins read
0
Hitachi ABB Powergrids
Share on FacebookShare on TwitterShare on Linkedin

Bangalore – Hitachi ABB Power Grids in India (listed on Indian stock exchanges as “ABB Power Products and Systems India Limited”) has successfully commissioned one of India’s longest ultra-high voltage direct current (UHVDC) transmission links for Power Grid Corporation of India Limited.  

The +/-800 kilovolt (kV), 6,000-megawatt (MW) link has the capacity to meet the electricity needs of more than 80 million people and stretches 1,800-kilometers to connect Raigarh in Central India to Pugalur in the southern state of Tamil Nadu. Reliable power can now be transmitted in either direction depending on demand, with exceptionally low power losses and minimal environmental footprint. The link supports the Indian government’s mission and the UN Sustainable Development Goal No. 7 of increasing access to affordable, reliable, sustainable, and modern energy for all.

RELATED POSTS

Singapore and the Philippines Advance Plans for Cross-Border Power Connectivity

POWERGRID Secures MCA Approval for Merger of 28 Wholly Owned Subsidiaries

Hitachi ABB Power Grids worked with the customer, government agencies, local authorities and suppliers to deliver the link during the COVID-19 pandemic.  Responsible project execution with health and safety at the forefront were key to this achievement.

“We strive to be a socially responsible business. Supporting society and protecting our people is at the center of our operations,” said N Venu, Managing Director and CEO, Hitachi ABB Power Grids in India. “With the commissioning of this groundbreaking UHVDC link, we have kept our promise to enable more clean and reliable power for millions of people, helping to build a future where electricity will be the backbone of the entire energy system. During the entire project, the health and safety of our customers, employees and partners remained our top priority.”

The link strengthens grid resilience and stabilizes the power infrastructure by combining traditional and renewable power generation. It enables further development and integration of sustainable energy, supporting the government’s goal of reaching 450 gigawatts (GW) of renewable energy by 2030.

Using HVDC helps to conserve the environment by only occupying about one-third of the land compared to a traditional AC link. In this case, that amounts to a saving of approximately 130 square kilometers – equal to a quarter of the area of Mumbai.

The consortium of Hitachi ABB Power Grids and state-owned engineering and manufacturing firm BHEL won the order in 2016 from Power Grid Corporation of India Limited. Hitachi ABB Power Grids has been responsible for delivering the UHVDC converter stations, including design, engineering, construction, installation, and commissioning, as well as major equipment, including 800 kV converter transformers, converter valves, high-voltage products and control and protection technology.

Hitachi ABB Power Grids is the global market leader in HVDC technology. The company has an impressive HVDC track record in India, where it introduced the technology with the Vindhyachal project in 1989. Raigarh-Pugalur is the company’s sixth HVDC project in India and the second UHVDC installation, following the multi-terminal North-East Agra link.

Tags: GridHitachiIndiapowerultra-highvoltage
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Power

Singapore and the Philippines Advance Plans for Cross-Border Power Connectivity

by Urja Daily
November 5, 2026
0

Singapore and the Philippines have agreed to explore opportunities for cross-border electricity interconnections and strengthen cooperation in nuclear energy.  The...

POWERGRID

POWERGRID Secures MCA Approval for Merger of 28 Wholly Owned Subsidiaries

by Urja Daily
November 5, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has received approval from the Ministry of Corporate Affairs (MCA) for the merger...

NEEPCO

NEEPCO signs PPA with GUVNL for 164.4 MW power allocation

by Urja Daily
October 30, 2026
0

North Eastern Electric Power Corporation Limited (NEEPCO) has signed a power purchase agreement (PPA) with Gujarat Urja Vikas Nigam Limited...

Electricity

MoP releases National Electricity Data Sharing Framework 2026

by Urja Daily
October 30, 2026
0

The Ministry of Power has released the National Electricity Data Sharing Framework 2026 to establish common practices for sharing operational,...

NLC India

NLC India Signs MoUs with IPICOL to Develop Power and Industrial Projects in Odisha

by Urja Daily
October 27, 2026
0

NLC India Limited (NLCIL) has signed memoranda of understanding with the Industrial Promotion and Investment Corporation of Odisha Limited (IPICOL)...

Next Post
Solar PV Junction

Solar PV Junction Box Market to Valuation of US$ 2 Bn

talos-gom-assets

Talos Energy Provides Update On Recent Drilling Operations

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Link Factory verification

November 13, 2026

Clocks and the measurement of passing time

November 13, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Link Factory verification

Clocks and the measurement of passing time

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved