Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Rooftop

Gujarat Waives Technical Feasibility for Rooftop Solar Systems Under 10 kW

editor by editor
May 28, 2024
in Rooftop, Solar
Reading Time: 1 min read
0
Gujarat Waives
Share on FacebookShare on TwitterShare on Linkedin

The Gujarat Electricity Regulatory Commission (GERC) has released the Draft Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Fourth Amendment) Regulations, 2024. In an effort to improve the integration of higher solar capacities into the grid while maintaining fair cost distribution, the draft introduces specific requirements for low- and high-tension customers installing rooftop solar systems.

The regulator has waived the requirement for a technical feasibility study for rooftop systems with a maximum capacity of 10 kW. The distribution company will manage any increase in the permitted load for the consumer. Distribution licensees are required under the new amendment to update the capacity of their transformers to connect rooftop solar systems on an annual basis. To guarantee openness and effective grid capacity management, this information must be given to the commission. A significant modification included in the amendment concerns charges related to strengthening the distribution network in order to facilitate rooftop solar installations.

RELATED POSTS

NIRL Secures LoI for 900 MW Solar Project from GUVNL

NLC India Renewables Wins 900 MW Solar Project from GUVNL

Tags: GERCGujarat WaivesRooftop Solar
ShareTweetShare
editor

editor

Related Posts

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

SECI

SECI Announces Winners of 4.455 MW Rooftop Solar Auction

by Palak
July 30, 2026
0

The Solar Energy Corporation of India Limited (SECI) has announced the winners for grid-connected rooftop solar project under the renewable...

LNK Energy

LNK Energy Secures Funding for Phase 1 of 6 GW Solar Manufacturing Facility

by Palak
July 30, 2026
0

LNK Energy has secured financial closure for phase 1 of its 6 GW integrated solar manufacturing facility in Maharashtra through...

Shweta Solar

Shweta Solar champions dependable after-sales support in rooftop solar

by Palak
July 27, 2026
0

New Delhi : Installing a rooftop solar system is only the beginning of a much longer journey. As more households...

Next Post
Karnataka government

Karnataka Issues Guidelines to Boost Rooftop Solar Installations

RWE Wind Farms

RWE Plans 1.6 GW Offshore Wind Farms

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved