Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

Extension of Bid Submission Deadline & Amendment-2: Tender for 50 MW (AC) Solar PV Project at Tamilnadu

Urja Daily by Urja Daily
May 18, 2021
in Tenders
Reading Time: 2 mins read
0
Solar PV Project
Share on FacebookShare on TwitterShare on Linkedin

Extension of Bid submission Deadline & Amendment 2: Tender for 50 MW (AC) Solar PV Project with Land having 10 years plant O&M at Tamilnadu, India

Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India

RELATED POSTS

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

TNGECL Issues Tender for 1 GWh BESS with VGF Support

Tender title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 50 MW (AC) Solar PV Project with Land having 10 years plant O&M at Tamilnadu, India

Tender No: SECI/C&P/TD/2020/TN/50

Tender Search Code (TSC): SECI-2021-TN000001

Extension of Bid Submission Deadline & Amendment 2 are hereby uploaded at SECI’s e-tendering portal at https://www.bharat-electronictender.com & SECI’s website at www.seci.co.in.

Amendment-2 is attached along with this notification for reference purpose, however the complete details are uploaded at https://www.bharat-electronictender.com

Extension of Bid submission Deadline: 

Existing Date & Time of Bid Submission: 19.05.2021 till 1400 HRS

Existing Date & Time of Bid Opening: 19.05.2021 at 1600 HRS

Revised Date & Time of Bid Submission: 07.06.2021 till 1400 HRS

Revised Date & Time of Bid Opening: 07.06.2021 at 1600 HRS

Prospective Bidders are requested to remain updated for any notices wrt the Bidding documents through the websites www.seci.co.in as no separate notification will be issued in this regard.

‘Click Here To See Files’

Tags: 50 MWSECISolar EnergySolar PV project
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

KPTCL

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

by Palak
April 9, 2025
0

Karnataka Power Transmission Corporation Limited (KPTCL) has announced the results of its 500 MW/1 GWh battery energy storage system (BESS)...

TNGECL

TNGECL Issues Tender for 1 GWh BESS with VGF Support

by Palak
March 18, 2025
0

Tamil Nadu Green Energy Corporation Limited (TNGECL) has initiated the bidding process for the development of six standalone battery energy...

NVVN

NVVN Issues Tender for 1,000 MWh BESS Project in Rajasthan

by Palak
March 3, 2025
0

NTPC Vidyut Vyapar Nigam Limited (NVVN) has invited proposals to develop standalone battery energy storage systems (BESS) with a total...

TGGENCO

TGGENCO Launches Tender for 250 MW/500 MWh BESS Project

by Urja Daily
January 27, 2025
0

Telangana Power Generation Corporation (TGGENCO) has issued a tender to develop a pilot project for a standalone battery energy storage...

NHPC Limited

NHPC Issues Tender for 125 MW/500 MWh BESS in Kerala

by Urja Daily
January 23, 2025
0

NHPC Limited has issued a tender to establish standalone battery energy storage systems (BESS) with an aggregate capacity of 500...

Next Post
Grid connected

Selection of SPDs for Setting Up of 75 MW Grid Connected :UPNEDA

SB Energy Solar Plant

AGEL to Acquire SB Energy’s 5000 MW India Renewable Power Portfolio For a Fully Completed EV of USD 3.5 Bn

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Vikram Solar

Vikram Solar Honored as Top Brand PV India 2025 by EUPD Research

May 20, 2025
Mr. Sandesh Chitnis, CEO - Core Integra

Core Integra Launches Bengaluru Regional Office to Drive Expansion in South India

May 20, 2025
  • 643 Followers
  • 23.9k Followers

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Vikram Solar Honored as Top Brand PV India 2025 by EUPD Research

Core Integra Launches Bengaluru Regional Office to Drive Expansion in South India

Acme Solar reports strong annual performance, delivering on commitments

Kisani Urjaa Names Damini Bisht as Co-Founder to Expand Reach to 10,000 Villages

Renny Strips Fuels Urban Growth in India with Innovative Scaffolding and Formwork Solutions

Lupin and Honeywell Collaborate to Advance HFO Technology in Inhalers

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved