Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

Estonia Announces Offshore Wind Auction

Urja Daily by Urja Daily
December 6, 2024
in Wind
Reading Time: 1 min read
0
Estonia
Share on FacebookShare on TwitterShare on Linkedin

The Consumer Protection and Technical Regulatory Authority (CPTRA) of the Republic of Estonia has announced an electronic auction for the development of an offshore wind farm in the Saare 1 area, which spans 88 square kms and is located 60 km west of Saaremaa island in the Baltic Sea. The auction will take place between January 21 and January 23, 2025. 

The auction includes three qualified participants: CI Estonia Wind GmbH & Co. KG, OÜ Utilitas Wind, and Oxan Energy. The starting price is set at €1.32 million, with a minimum bid increment of €50,000. Furthermore, interested bidders must submit an application and a deposit of €26,400 to the CPTRA. The planned capacity for the offshore wind farm ranges between 900 MW and 1,200 MW. 

RELATED POSTS

Gujarat Urja Vikas Nigam Limited Announces Winners of 250 MW Wind Power Auction

Made in India, Made for the World: India’s Wind Power Converter Manufacturing Reaches New Scale

Following the auction, the winning bidder will proceed with the superficies license application and environmental impact assessment process within 90 days. The developer is required to submit an environmental impact assessment program to the CPTRA within 18 months of approval and a final report within 24 months.

Tags: EstoniaOxan EnergyWind
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

GUVNL

Gujarat Urja Vikas Nigam Limited Announces Winners of 250 MW Wind Power Auction

by Palak
July 13, 2026
0

Gujarat Urja Vikas Nigam Limited (GUVNL) has announced the winners of its auction to procure power from 250 MW of...

Delta Electronics India

Made in India, Made for the World: India’s Wind Power Converter Manufacturing Reaches New Scale

by Palak
July 11, 2026
0

India's wind sector is crossing a meaningful manufacturing milestone. For years, much of the critical equipment inside turbines—especially converters that...

NTPC

NTPC Green Energy Limited Commissions 50.4 MW Vanki Wind Project in Gujarat

by Palak
July 10, 2026
0

NTPC Green Energy Limited (NGEL) has declared the commercial operation of the first part capacity of 50.4 MW of the...

Solar and Wind

Hexa Climate signs 100 MW wind-solar hybrid PPA with CESC

by Palak
July 9, 2026
0

Hexa Climate has signed a power purchase agreement (PPA) with CESC Limited for the supply of 100 MW of inter-state...

Tata Power

Tata Power Commissions 100.8 MW Wind Project

by Palak
July 6, 2026
0

Tata Power Renewable Energy Limited (TPREL), a subsidiary of Tata Power Company Limited, has commissioned its 100.8 MW Jewali wind...

Next Post
DEET

Telangana Embraces Workruit's DEET Platform for Employment Ecosystem Enhancement

KERC

KERC Simplifies Rooftop Solar Installation Rules for Systems Up to 10 kW

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Mr.Vinkesh Gulati

Automotive Skills Development Council Empowers Over 5 Lakh Learners with Future-Ready Automotive Skills on World Youth Skills Day

July 14, 2026
Automation Expo 2026 Invite

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

July 14, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

Automotive Skills Development Council Empowers Over 5 Lakh Learners with Future-Ready Automotive Skills on World Youth Skills Day

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

POWERGRID secures LoI for ISTS augmentation project under TBCB

JSW Energy arm bags Rs 4.4 billion BESS order from Bondada Engineering

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

SAEL bags solar module supply order from NTPC REL

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved