Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Enertopia Received Positive 3rd Party Engineering Study

Urja Daily by Urja Daily
October 23, 2021
in News, Solar
Reading Time: 2 mins read
0
Enertopia
Share on FacebookShare on TwitterShare on Linkedin

KELOWNA, British Columbia – Enertopia Corporation a company focused on building shareholder value through a combination of our Nevada Lithium claims, intellectual property, & patents in the green technology space, is pleased to announce the following technology update.

Over the past few months, the independent engineering firm Thermal Energy System Specialists, LLC. conducted engineering studies to confirm our in-house analysis on field validation and demonstration, as well as next-generation PV increase in production and co-extraction of waste heat energy.

RELATED POSTS

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

These early findings indicate that a one-megawatt solar PV array could potentially have it’s annual production increased by up to 193 MW/h per year.  This is based on a current annual rated production capacity of 1,400 MW/h per year for a one MW solar PV array.

“Enertopia is looking forward to moving into the fabrication and beta phase on the Solar booster and the Heat Extractor as we move to maximize the increased PV and thermal outputs during this next phase of development in providing carbon-neutral energy production options.” Stated President and CEO Robert McAllister.”

The three main goals from the detailed 9-page report.

  1. Verify that existing PV/T models have the flexibility to address the specific design considerations being proposed and by applying reasonable assumptions, while also confirming that we see the same order of magnitude electrical performance improvement that has been documented at other actively cooled PV arrays.Results:Data analysis projects increased annual PV output under the top three scenarios of 11.8% to 13.8% with the increase in PV output during the month of July running between 17.4% and 19.9%Data analysis using the combination of PV and thermal recovery resulted in an increased annual PV output of 8.2% and thermal energy output of 14.6%
  2. Identify the critical design elements of the PV/T to which the electrical (and thermal) performance are most sensitive, in order to guide the design of the cooling mats.Results:Thermal loss between layers, length of run, and flow of the cooling medium are three areas targeted for increased performance output.
  3. Lay the groundwork for a model calibration exercise, in which the PV/T model will be driven with site measured weather conditions, allowing us to adjust model parameters so as to minimize the difference between modeled and measured energy production. The calibrated model will then be used as a test bed for additional cooling mat design options.Results:Data monitoring and Beta testing are underway on the first rooftop Solar Booster, which is providing PV cooling and Thermal water heating for a residential pool. 
Tags: EnertopiaGreen TechnologyLithium claimsNevadaSpace
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

by Palak
August 3, 2026
0

HONG KONG - Driven by the rapid iteration of global artificial intelligence (AI) large models, the continuous surge in computing demand...

ASDC CEO Prasanna Pahade

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

by Palak
August 3, 2026
0

New Delhi: The Automotive Skills Development Council (ASDC), India's apex skill development body for the automotive sector, today announced the appointment...

Ather Energy

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

by Palak
August 3, 2026
0

National : Ather Energy reported a strong EBITDA improvement of 1,650 basis points (bps) year-on-year (YoY).The company delivered 83,173 units...

PVV Infra

PVV Infra secures land mark sites from NHLML for developing wayside amenities

by Palak
August 3, 2026
0

Hyderabad : PVV Infra Limited has received two prestigious Letters of Award (LOAs) from National Highways Logistics Management Limited (NHLML), a...

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

Next Post
Risen-Energy

Risen Energy Heralds the Arrival of PV 7.0 Era

Atlas-Renewable

IJGlobal Recognized Atlas Renewable Energy with its 2020 ESG Energy Deal

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved