Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

CESC Invites Bids for 600 MW Wind-Solar Hybrid Projects

Palak by Palak
November 28, 2025
in Wind
Reading Time: 1 min read
0
CESE
Share on FacebookShare on TwitterShare on Linkedin

The Calcutta Electric Supply Corporation (CESC) has floated a tender for the development of 600 MW of interstate transmission system (ISTS)-connected wind-solar hybrid projects. The projects will be developed under a build-own-operate model.

According to the tender guidelines, the scope of work encompasses setting up the wind–solar hybrid projects. It also includes establishing the transmission network up to the interconnection point. Furthermore, the scope includes securing land, installing and operating the projects, and obtaining the necessary approvals. The electricity produced from these projects will support CESC in fulfilling its renewable power and consumption commitments. Additionally, CESC will ink a 25-year power purchase agreement with the shortlisted bidders.

RELATED POSTS

South Korea announces 2.2 GW offshore wind auction

Vayona Energy wins 108 MW order from Continuum Green Energy

Further, according to the tender guidelines, bidders need to furnish an earnest money deposit of Rs 2 million per MW per project. They are also required to provide a performance bank guarantee of Rs 2.3 million per MW for the solar portion and Rs 3.2 million per MW for the wind portion of the projects. The bid submission deadline is January 19, 2026.

Tags: CESCElectricitypowersolarWind
ShareTweetShare
Palak

Palak

Related Posts

Wind

South Korea announces 2.2 GW offshore wind auction

by Urja Daily
November 5, 2026
0

South Korea’s Ministry of Climate, Energy and Environment has announced an auction for approximately 2.2 GW of offshore wind capacity...

Vayavya Labs

Vayona Energy wins 108 MW order from Continuum Green Energy

by Urja Daily
November 3, 2026
0

Mumbai : Vayona Energy has secured a firm 108 MW order from Continuum Green Energy Limited, an Independent Power Producer...

petrovietnam

PetroVietnam and CIP advance 1 GW offshore wind project in Vietnam

by Urja Daily
November 2, 2026
0

Vietnam’s state-owned PetroVietnam and Denmark-based investment firm Copenhagen Infrastructure Partners (CIP) have signed a cooperation agreement to advance the 1...

Wind

PetroVietnam and CIP advance 1 GW offshore wind project in Vietnam

by Urja Daily
October 30, 2026
0

Vietnam’s state-owned PetroVietnam and Denmark-based investment firm Copenhagen Infrastructure Partners (CIP) have signed a cooperation agreement to advance the 1...

Powerica

Powerica receives LoI for 50 MW wind power project in Gujarat

by Urja Daily
October 26, 2026
0

Powerica Limited has received a letter of intent (LoI) from Gujarat Urja Vikas Nigam Limited (GUVNL) for a 50 MW...

Next Post
ACMA

ACMA Welcomes New Scheme to Boost Sintered REPM Manufacturing

Vedanta

Vedanta Aluminium Doubles India’s Largest Electric Forklift Fleet

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved