Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

CESC Invites Bids for 600 MW Wind-Solar Hybrid Projects

Palak by Palak
November 28, 2025
in Wind
Reading Time: 1 min read
0
CESE
Share on FacebookShare on TwitterShare on Linkedin

The Calcutta Electric Supply Corporation (CESC) has floated a tender for the development of 600 MW of interstate transmission system (ISTS)-connected wind-solar hybrid projects. The projects will be developed under a build-own-operate model.

According to the tender guidelines, the scope of work encompasses setting up the wind–solar hybrid projects. It also includes establishing the transmission network up to the interconnection point. Furthermore, the scope includes securing land, installing and operating the projects, and obtaining the necessary approvals. The electricity produced from these projects will support CESC in fulfilling its renewable power and consumption commitments. Additionally, CESC will ink a 25-year power purchase agreement with the shortlisted bidders.

RELATED POSTS

MNRE Unveils WT-MARUT Portal for Wind Sector

NTPC REL floats tender for the supply and installation of WTGs for 813 MW wind project

Further, according to the tender guidelines, bidders need to furnish an earnest money deposit of Rs 2 million per MW per project. They are also required to provide a performance bank guarantee of Rs 2.3 million per MW for the solar portion and Rs 3.2 million per MW for the wind portion of the projects. The bid submission deadline is January 19, 2026.

Tags: CESCElectricitypowersolarWind
ShareTweetShare
Palak

Palak

Related Posts

MNRE

MNRE Unveils WT-MARUT Portal for Wind Sector

by Palak
June 18, 2026
0

The Ministry of New and Renewable Energy (MNRE) has launched the Wind Turbine Materials and Resources Utility Tracker (WT-MARUT) portal,...

NTPC Renewable Energy

NTPC REL floats tender for the supply and installation of WTGs for 813 MW wind project

by Palak
April 10, 2026
0

NTPC Renewable Energy Limited (NTPC REL) has issued a tender for the supply and installation of wind turbine generators (WTGs)...

Terra Clean

Terra Clean Floats Tender for 100 MW Wind Project in Gujarat

by Palak
March 25, 2026
0

According to the tender guidelines, the scope of work includes the development of the InSTS project and ten years of...

ACEN India

ACEN India raises Rs 7.52 billion for 100 MW wind project in Karnataka

by Palak
March 25, 2026
0

ACEN India, has raised Rs 7.52 billion from Mitsubishi UFJ Financial Group and Sumitomo Mitsui Banking Corporation. The financing has...

Suzlon Energy

Suzlon Energy Wins 100 MW Wind Project Order from GAIL India Limited

by Palak
March 25, 2026
0

Suzlon Group has secured an order for a 100 MW wind energy project from Gas Authority of India Limited (GAIL)....

Next Post
ACMA

ACMA Welcomes New Scheme to Boost Sintered REPM Manufacturing

Vedanta

Vedanta Aluminium Doubles India’s Largest Electric Forklift Fleet

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

FPT TUVSUDV

FPT Enters The Top Three of Europe’s Certified High-Voltage Battery Producers With TÜV SÜD Recognition 

June 23, 2026
FPT

FPT And Green Power Systems Help Boost Algeria’s Powdered Milk Production

June 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • How proper refurbishment can extend life of pre-owned bikes in India?

    0 shares
    Share 0 Tweet 0

FPT Enters The Top Three of Europe’s Certified High-Voltage Battery Producers With TÜV SÜD Recognition 

FPT And Green Power Systems Help Boost Algeria’s Powdered Milk Production

Gruner’s CBG Plant Sets Asia Record with 23.5 TPD Output, Achieves 120% of Design Capacity at Satna

Integrals Power Validates Sustainably Produced Iron Phosphate Precursor and LFP Cathode Material in Cell Level at University of St Andrews

Power Transmission is the Foundation of Economic Growth

VinFast India, Tata Capital Join Hands for Dealer Financing

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved